HomeMy WebLinkAboutBLD2019-00432 Cancelled Demo - BLD Permit / Conditions - 4/29/2019 T
Yt�. ,'•
Mason County
( \ Mason County - Division of Community Development
•t,`--�� / 615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
FPROJECT
9-00432 DEMO
DESCRIPTION: DEMO PERMIT FOR 1979 MFG HOME ISSUED: 04/29/2019
DE
ESS: 51 NE HARPOON DR BELFAIR EXPIRES: 10/26/2019
PARCEL: 123305200011
APPLICANT: MANUEL HERNANDEZ OWNER: MANUEL HERNANDEZ
P O BOX 1318 PO BOX 1318
BELFAIR,WA 98528 BELFAIR,WA 98528
F Paid Due
olition Fee $120.00 $0.00
tate Fee-Residential $6.50 $0.00
Totals : $126.50 $0.00
rN
\40Y REQUIRED INSPECTIONS
BLD-Final Inspection
CONDITIONS
" The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful
for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing
materials have been removed from the area to be demolished. work shall not commence on an asbestos project or
demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia
WA 98502, 360-586-1044, 800-422-5623, www.orcaa.org
* All construction and demolition debris must be removed from the beach after project completion. Proper disposal of
construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State
waters.
• The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire.
• For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric,
gas, water, sewer, ...) have been terminated prior to demolishing a structure.
Printed by:Genie Mcfarland on:04/29/2019 02:42 PM
Page 1 of 2
i
Mason County
c<\ Mason County - Division of Community Development
••TA
615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
DEMO BLD2019-00432
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The grantinA of a permit does not presume to give authority to violate or cancel
the provisions of any other state/I&M law regulating construction or the performance of construction.
Issued By:
Contractor or thorized Agent: r Date:
A
Printed by:Genie Mcfarfand on:04/29/2019 02:42 PM Page 2 of 2
v0 0 0 0 D m ® g '
z z z � �
n n it *�
a N m O O
CD
r _
.' � n N
z m z o
z C o cri
m r- N C;
= o
m o 0
.p,
z W
z N
Z p
m
N
D
m
0 rn
O -.1
r D y c„
Z v v -0 -a
v
_D ♦Z^
m m m O O`
-I (D V
o m Do p CQ M
W N o O n n
� n N � N
x � m O v Q
cn
a)
O0-) O
� O ci� �1 000
z O Q
Z3 CD � = Z
z > lD
v p cn v WOK ` �
0 0 m N D
O v D
z
o � v
:3 Ul
O 00
A
00
z m v
Co
n D
v m
D G)
m = Cn
00
mO N
E: 00
x x
m
O O Cl)
z z z
m m O
r
n m
o
(D rn
41- m
co�`�� MASON COUNTY PERMIT NO.1JIG12LIq
m . F COMMUNITY SERVICES DEPARTMENT
BUILDING•PLANNING a,FIRE MARSHAL
- 1�1&i2v+cf - W4 71
WW .CO.MASON.WA.US (360)427-9670 Shelton ext.352
W
Mason County Bldg.#8, 615 W.Alder St (360)275-4467 Belfair ext.352
Shelton,WA 98584 (360)482-5269 Elma ext.352
DEMOLITION PERMIT APPLICATION
OWNER INFORMATION: nn CONTRACTOR INFORMATION:
NAME: M rzn y f� I act ll C1t �t NAME:'
MAILING ADDRESS: {� C, , P b x 13) 8r MAILING ADDRESS: KP
CITY: (�rt 1 E c{ ,f STATE: Uy d ZIP: 9 CITY: kP a STATE: LQ J ZIP:_ ` C191.
PHONE:' CELL:?GaD- (pq 9 -CW.3 y PHONE: CELL: 25.3- -3 ;?Z S-
EMAIL: EMAIL :
L&I REG# EXP.
PARCEL INFORMATION:
PARCEL NUMBER(12 DIGIT NUMBER) 0001 FIRE DISTRICT
LEGAL DESCRIPTION(ABBREVIATED) :
SITE ADDRESS 1 C(r LA CITY
DIRECTIONS TO SITE ADDRESS:
N5
IS PROPERTY WITHIN 200 FT:
SALTWATER❑ LAKE[] RIVER/CREEK❑ POND[] WETLAND❑ SEASONAL RUNOFF❑ STREAM ❑
DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES❑ NO ❑
IF YOUR PROJECT IS LOCATED ADJACENT TO OR WITHINANAREA THAT IS LISTED ABOVE, PLEASE
CONTACT THE PLANNING DIVISION OF COMMUNITY DEVELOPMENT PRIOR TO DEMOLITION TO
ENSURE REDEVELOPMENT.
USE OF STRUCT MEMOLISFIED(RESIDENCE,GARAGE ETC.) M lz` -
HOW n�J=V,
BRIS BE�@D�ISPOLiz, K ALL I
PROVIDE A P OT PLAN INDICATING LOCATION OF STRUCTURE TO BE DEMOLISHED
ooY1 1�IR.,
; r�0^
OWNER/CONTRACTOR acknow es submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or contractor. I further
declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary
parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for
review and inspection.This permit/application.becomes null&void if work or authorized construction is not commenced within 180
d r if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF
I TION. I TIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WI;L INVALIDATE THE APPLICATION.
X 11
Signature of Applicant n_ ate
X�Y�n y.R< I,nccOt OWNER/REPRESENTATIVE/CONTRACTOR
Print Nam (CIRCLE TO INDICATE)
;DEPARTMENTAL REVIEW_`< APPROVED DATE DElYiED. DATE TAG560TES/CONDITIONS
BUILDING DEPARTMENT
PLANNING DEPARTMENT
KC6
E VIRONMENT L KCBENVIRONMENTAL SERVICES
seavtces Phone: (360)830-5022 Cell: (360)271-8252
�� P.O. BOX 829 Seabeck,WA. 98380
Email: xskylax@gmail.com
CERTIFIED AHERA ASBESTOS INSPECTION
MASON COUNTY
April 18,2018
51 NE Harpoon Dr.
Belfair, WA
I _
{
Prepared for:
Manuel Hernandez
PO Box 1318 Belfair,
WA 98528
1
TABLE OF CONTENTS
001. Regulatory Compliance....................................
002. Asbestos Definition.........................................
003. Sampling Protocol...........................................
004. Survey Methodology/Limitations..........................
005. Site Specifications...........................................
006. Summary......................................................
Attachments which may be included:
* Site location maps
* Photos
* Notification forms
* Lab analysis
* Field reports
* Chain of Custody forms
* Certifications
* Print outs
* Miscellaneous information
2
001. Regulatory Compliance
This inspection satisfies the current regulation WAC 296-62-07707 that requires
building owners to conduct an inspection before any repair, remodel, or demolition can
be performed where asbestos may be disturbed(Chapter 49-17 RCW) and...
Olympic Region Clean Air Agent(ORCAAI Regulations Article 14 of the
Asbestos Control Standards Section 14.05 Notification Requirement and Fees
"It shal I be unlawful for any person to cause or allow work on an asbestos project or
demolition unless owner or the operator has obtained written approval from the control
officer as follows:
(1) A written"Application to Perform an Asbestos Project"or
An application to Perform a Demolition; shall be submitted
on Agency-provided forms by the owner or operator for
approval by the Control Officer before any work on an
asbestos project or demolition begins. It shall be unlawful
for any person to cause or allow any false or misrepresenting
information on either form-
(2) The written application shall be accompanied by the appropriate
Application fee and a certification that an asbestos survey has
been conducted.
(3) The written application for a demolition shall also include a
Certification that there is no known asbestos-containing materials
remaining in the area of the demolition.
(4) The duration of an asbestos project or demolition shall not exceed
one year beyond the original starting date that is commensurate with
the amount of work involved.
(5) A copy of the approved application and asbestos survey shall be available
For inspection at the asbestos project or demolition site.
(6) Upon completion of an asbestos project or demolition, awritten"Notice
Of Completion" shall be filed with the Control Officer.
(7) Submission of an"Application to Perform an Asbestos Project" shall be
Prima facie evidence that the asbestos project involves ACM.
(8) Application for multiple asbestos projects may be filed on one form, if
Specific criteria are met(see ORCAA website for details).
Notification is required for demo)i ti on's i nvol vi ng structures with a projected roof area
greater than 120 square feet, even if no ACM is present.
Friable, asbestos-containing material need not be removed from a component if the
component can be removed, stored, or transported for reuse without disturbing or
damaging the asbestos.
3
It shall be unlawful for any person to cause or allow the burning of any facility for
fire training without removing all asbestos-containing materials prior to burning. This
includes both friable and nonfriable ACM.
---------------------------------------------------------------------------------------------------
Section 4.05 Procedures for Asbestos Projects. Training Requirements
It shall be unlawful for any person to cause or allow any work on an asbestos project
unless it is performed by persons trained and certified in accordance with the standards
established by the Washington State Department of Labor and Industries,the federal
Occupational Safety&Health Administration(OSHA), or the United States
Environmental Protection Agency(whichever agency has jurisdiction) and whose
certification is current. "
This certification requirement does not apply to asbestos projects conducted in an
owner-occupied, single family residence performed by the resident owner of the
dwelling.
AHERA(Asbestos Hazard Emergency Response Act) regulation requires this
inspection to include the identification of Friable and Non-Friable ACM in
(1) Surfacing Materials,
(2) Thermal System Insulation, and
(3) Miscellaneous Materials:to delineate homogeneous areas and to sample or
"Presume" all materials located.
Friable ACM is thought to release fibers into the air more readily, however, many
types of Non-Friable ACM can become airborne if disturbed. Additionally,the
condition of the material will be graded and the potential for
future damage assessed.
The number of samples required is specified in the AHERA Rule (40 CFR 763.86)
as follows:
Surfacing_Materials: (SM)
3 samples per homo-geneous area of less than 1000 square feet,
5 samples for greater than 1000 but less than 5000 square feet,
7 samples for greater than 5000 square feet.
Thermal System Insulation: (TSI)
3 samples from each homogeneous area that is not"Assumed" to be asbestos,
1 sample per each patched area and as determined by the inspector for tees,
elbows or valves.
Miscellaneous Materials: (MM) Sample in amounts determined
sufficient by the inspector.
4
Friable asbestos is material that can be crumbled,pulverized or reduced to powder
by hand pressure. Non-Friable asbestos can become Friable by sanding, grinding,
sawing, or other mechanically induced means.
EPA(Environmental Protection Agency) regulates asbestos above 1%, as
determined using the method specified in Appendix A, Subpart F,40 CFR(Code of
Federal Regulations)Part 763, Section 1, by Polarized Light Microscopy(PLM).
These agencies regulate asbestos in these counties: (Washington State)
• Puget Sound Clean Air Agency(PSCAA)King,Kitsap,Pierce,Snohomish
• Olympic Regional Clean Air Agency(ORCAA)Jefferson,Clallam,Mason,Thurston,Pacific,Grays Harbor
• Southwest Clean Air Agency(SWCAA)Lewis,Clark,Wahkiakum,Cowlitz,Skamania
• Yakima County Clean Air Authority(YCCAA)Yalama
• Northwest Air Pollution Authority(NAPA)Whatcom,Skagit,Island
• Douglas County Clean Air Cornmission,Douglas
• Grant County Clean Air Authority, Grant
• Tri Counties Air Pollution Control Authority,Benton Walla walla,Franklin
• Spokane County Air Pollution Control Authority(SCAPCA)Spokane
• Washington Department of Ecology,(DOE)Stevens,Ferry,Okanogan,San Juan,Chelan,Kittitas,Klickitat,
Columbia,Garfield,Asotin,Adams,Lincoln,Pend Oreille
A fee must be paid, and the Notice of Intent filed, and be submitted prior to
renovation or demolition of a building.
There is a required waiting period after filing a notification before work can begin.
(Mandatory 10 days for all demolition's) Calendar or working day wait is stipulated by
each regulatory agency's policy.
Further information regarding compliance may be obtained at our office.
It is unlawful for the owner or the owner's agent to remove asbestos in excess of 10
linear feet or 48 square feet per year,per structure,unless the building is an owner-
occupied, single family private residence.
Washington State law requires asbestos that is left in place,be in good repair and
maintained at regular intervals. Maintenance should be documented.
References:
WAC 296-62-077 Asbestos, Tremolite, Anthophlylite &Actinolite
WAC 296-65-001 Asbestos Removal&Encapsulation
NESHAP Asbestos Regulations 40 CFR 61 Sub Part M
PSCCA Regulation III Article 4
AHERA Model Accreditation Plan 1 AHERA Final Rule 40CFR 763
OSHA 29 CFR Parts 1910
US EPA Guidance for Controlling Friable ACM in Buildings
5
US EPA ACM in School Buildings, A Guidance Document Part 1&2
US EPA Asbestos Waste Management Guidance (Office of Solid Waste)US EPA
Reporting&Recordkeeping Requirements for Waste Disposal 11-90
US EPA Asbestos in the Home,A Homeowners Guide 6-88
United States Environmental Protection Agency; The Asbestos Informer
All federally recognized Tribal Lands are not under the jurisdiction of a local air
pollution control agency but must report to the US EPA when undertaking asbestos
abatement.
6
002. Asbestos Definition
"Asbestos" includes Chrysotile,Amosite, Crocidolite, Tremolite asbestos,
Anthrophylite asbestos, Actinolite asbestos, and any of these minerals that have been
chemically treated and/or altered. Chrysotile is the most commonly used type of
asbestos in North America, known as"white asbestos', the only mineral in the
serpentine group of asbestos minerals.
The word"asbestos" (Greek- not extinguishable)was first recorded in the first
century AD, although the substance was known as early as the second century BC.
75%of the world's asbestos is mined in Quebec.
Exposure to asbestos fibers can cause asbestosis,various cancers and the deadly
mesothelioma which is an inoperable cancer of the chest and abdominal linings.
Because there is no known safe level of exposure to asbestos, all exposure should be
avoided.
Asbestos was used in the United States in over 3600 different building materials,
and while it is possible to suspect that a material contains asbestos, actual
determination can only be made by instrumental analysis.
Sample List of Suspect Asbestos Containing Materials
• Cement Siding/Wallboard/Cement asbestos pipes
• Window putty
• Vinyl Floor Tile/Vinyl Wall Coverings
• Vinyl Sheet Flooring/backing and adhesives
• Vermiculite attic insulation
• Construction Mastics/Joint Compounds/Spackling/Caulking/Putty
• Acoustical and Decorative Plaster
• Textured Paints and Coatings
• Ceiling Tiles and Lay-in Panels/"popcorn" oei I ing texture
• Spray-on Insulation/Duct&Boiler Insulation
• Blown-in Insulation/Wiring Insulation
• Fireproofing Materials/Cooling Towers/Base Flashing
• Taping Compounds/Chalkboards/Roofing Shingles
• Packing Materials(Walls/Floors)
• Gaskets/Drywall/Roofing Felt
• Laboratory Hoods/Gloves/Table Tops
• Fire Blankets/Fire Curtains/Fire Doors
• Heating&Electrical Ducts/Pipe Insulation
7
003 Sampling Protocol
This survey addresses Friable and Non-friable suspect asbestos containing materials
to meet NESHAP 40 CFR 61 (National Emissions Standards for Hazardous Air
Pollutants)requirements for renovation and/or demolition activities.
When suspect ACM is observed our technicians are trained and proficient in
gathering samples by approved industry standards. All samples are then analyzed by an
independent EPA approved NVLAP/NIST/A -IA accredited lab that participates in the
PAT program according to 29 CFR 1910.1001, 0)(8)(ii)(A&B).
The samples are analyzed using PLM with dispersion staining to estimate the
percentage of asbestos composition by volume.
Samples in which less than 1%of asbestos mineral is detected is designated as
"None Detected" (ND)or"No Asbestos Detected" (NAD).
Random samples are gathered of each homogeneous suspect ACM identified during
a visual search. A series of samples are gathered (according to the 3-5-7 AHERA Rule)
and are read at the lab for a positive result. If positive, no other samples are read of that
material; if the sample is negative of asbestos content,the other samples are studied.
All samples gathered must be reported negative for the material to be considered "None
Detected".
The laboratory analysis of all bulk sampling is included in this report and intended
to be an integral part of the inspection data. Guidelines require laboratories reading
asbestos samples to read all materials which are included in the submitted sample (tile,
mastics,vinyls, adhesives, leveling compounds, etc). Because we frequently submit a
"layered" sample,we may not sample mastics/adhesives separately as we feel this
would be redundant and cause confusion in the interpretation for our clients and also
result in costlier lab fees. Therefore,the number of samples gathered will not always
result in the same number of sample results received from the lab.
Not all laboratories are qualified to analyze asbestos. The lab must be NVLAP
certified,participating in the PAT Program of the Federal government.
8
004. Survey Methodology/Limitations
Site reconnaissance was conducted by a Certified AHERA Building Inspector, in
accordance with 40 CFR Part 763 Appendix C, who is familiar with the probable uses
and locations of suspected Asbestos Containing Building Materials (ACBM). In
addition to a visual walk through, effort is expended to disclose prior uses of the
facility, age, and characteristics of construction, and other information which helps
determine the potential presence of suspected ACBM.
This inspection report is the written opinion of a qualified Certified AHERA
Building Inspector and is based on conditions visible at the time of the site visit. This
report does not constitute a warranty of any kind. Although extensive searches are
conducted,there remains a remote possibility that asbestos in some form may lie
undetected within the structure;under a floor, inside a duct,behind a wall, or buried in
the ground. No degree of demolition was authorized or performed.
Some printed materials may be included in this report strictly for educational
purpose.
Estimated dimensions quoted in this report are approximate estimates for location
awareness of the materials and are not intended to be accurate for bidding. The
Abatement Contractor should check all measurements by site visit.
No portion of this report should be removed from its entirety; copies can be made by
folding back the pages. This report should remain on file for future reference regarding
this structure.
In older structures, it should be noted for personal safety that most window putty did
contain asbestos, and that in the process of removing the putty to repair a pane, some
individual contamination would most likely occur. Such windows should be removed
with the glass intact, and disposed of as a unit.
When flooring is considered suspect of asbestos content,the mastic should always
be treated as suspect as well, and should never be chipped, sanded or scraped until
tested to determine if asbestos is present.
All questions pertaining to this report should be directed to our office for immediate
response.
Field notes are included in this report for their interpretive value. Photo's if taken
are included for identification.
Sample readings resulting in less than one percent(<I%) will not be recorded as
asbestos because this amount in unregulated, therefore not considered asbestos (ACM).
9
Our services have been executed in accordance with generally accepted
practices within the limitations of scope, schedule, and budget; no other conditions are
expressed or implied.
This report does not expire as long as all repairs and remodeling activities after
the inspection has been performed are conducted using new materials (not inventoried
or used) certified asbestos free; and this action is carefully documented.
Because materials are being imported into the United States from China,which
can contain asbestos, all suspect materials must be tested to ascertain whether or not
asbestos fibers are present. There no longer is a"cutoff" date from the year that the
U.S. stopped the manufacturing of ACM for residential use that we can rely on.
This document is protected by the Copyright Act of 1979 under Title 17 of the
United States Code. Under no circumstances can this report be used unless it has been
financially compensated for, nor can it be re-printed without express authorization from
this firm.
10
005. Site Specification:
This Certified AHERA Building Inspection has been authorized by Manuel
Hernandez at 51 NE Harpoon Drive in Belfair.
The site investigation was performed on April 26th, 2019 on this single wide
mobile home. It has aluminum siding and a flat metal roof.
(7) samples were collected on site of materials that were suspect of containing
asbestos fibers:
• Silver Seal Roof Coating
• Drywall
• Sheet Vinyl
• Adhesives
The suspect materials were collected wet, and sealed into 2mil poly lab pouches
and were shipped by Priority Mail to our preferred asbestos-specific NVLAP
laboratory for analysis using Polarized Light Microscopy.
"Suspect Material" is defined as any building material that has ever been
documented as containing asbestos fibers or materials that closely resemble those
that have.
The base amount of asbestos that is regulated is more than one percent.
This report was prepared for the exclusive use of Manuel Hernandez and his
agents or representatives for specific application to this site. If new information is
developed through excavations, borings or other studies,this inspector should be
retained to re-evaluate the conclusions of this report and provide amendments as
needed.
11
006. Summary:
The local Clean Air Agencies require a 10 day wait prior to asbestos abatement
of a commercial or other than owner-occupied structures;and requires the 14 day wait
for all demolitions. A demolition Permit must be purchased from ORCAA whether
or not asbestos was identified attached to your structure.
It is required to file your Notice of Intent with Olympic Region Clean Air
Agency online at ti,,v,,N orcaa_or;_* and you may phone them for more information at;
360.539.7610.Payment of the Notice of Intent will be accepted by credit/debit card.
We suggest you retain this document for as long as you own this property(or
hold contract to work on it)to verify your compliance to the asbestos standards in place
at this time.
If there are any questions, please feel free to contact this inspector:
Skyler Taylor, Certified AHERA Building Inspector#Bi-NEs-08-21-14-01
12
KCB ENVIRONMENTAL SERVICES
P.O.Box 829—Seabeck,WA 98380
360.830.5022
COMPENDIUM OF LOCATED
ASBESTOS-CONTAINING MATERIALS
51 NE Harpoon Drive
Belfair, WA
After due diligence was exercised in the investigation of this single
wide mobile, there were no materials identified to contain asbestos.
Skyler Taylor, Certified AURA Bdilduig Inspector#BI-NES-08-21-14-01
13
FIELD REPORTS -LABORATORY FINDINGS
K C B Environmental Services
14
N rn
r —I > lD
_ A p O oa o w O
0
N Do . o0 3
N CD
r 3 D m 3
z
D nLn
T fD
CD r-r �
� 2
CD
oLnm
n N
m > v
S � �
z
`n m
Ln
CD
rt o
v b rt Z 0
D 1 vr(p � z
+. p� D z ij m Ln
J n D I
r (7
N Q 1
d D > Z
KN Z
3 mo > cpo S
N
O .l tj 0 D
(' r- Z
p
r (�1
cln �
� T r �
> On p W
O
.� z o
�S ^
b ,
0 cu
'O
rD
� � O
w.
ILA .�
1� zrrl
N +�
Cl V i ram`
N o
'--4
0
m (D
�- z o m
o c C v
Dmi x r° n p T
O { �? O z
�+ v
M m
m <
rp
a m
m
70
3 tn
IA
x
3
rn
i_ M n V
O
N x
pa oo 1%,j v°
FQ
ro CD
x �
rmfD
(u
xco
4 g "' DoC o o
rn
Q Tr 1• (off A
Cr w S
rD z n
v
In
o O
— --- to
w v
O m c A D n7
C1 _ 5 m On
Z
Q CL v CLQj
N
tfDD r 2 A
amp
GjLIM
rn
° o
a rn
A � �
5
o
Analyt'lcal
Client: Skyler Taylor Report#: 0419142
KCB Date of Receipt: 04/23/2019
PO Box 829 Report Date: 04/23/2019
Seabeck Wa 98380 Date of Analysis: 04/23/2019
Project: 51 NE HARPOON
Sample Material
Client# Location Description Detection Composition
1-51 HARPOON LAYER 1 None Detected Cellulose Fiber 20%
Sheet Vinyl,White,Non- Non-Fibrous Material 80%
homogeneous,Fibrous-Rubbery,
Non-Friable
LAYER 2 None Detected Non-Fibrous Material 100%
Adhesive,Yellow,Non-
homogeneous,Resinous,Non-
Friable
2-51 HARPOON LAYER 1 None Detected Non-Fibrous Material 100%
Mud,White,Non-homogeneous,
Chalky,Non-Friable
LAYER 2 None Detected Cellulose Fiber 10%
Drywall,White, Non- Non-Fibrous Material 90%
homogeneous,Chalky-Fibrous,
Non-Friable
3-51 HARPOON LAYER 1 None Detected Cellulose Fiber 20%
Sheet Vinyl,Beige,Non- Non-Fibrous Material 80%
homogeneous,Fibrous-Rubbery,
Non-Friable
LAYER 2 None Detected Non-Fibrous Material 100%
Adhesive,Yellow,Non-
homogeneous, Resinous,Non-
Friable
4-51 HARPOON LAYER 1 None Detected Cellulose Fiber 20%
Sheet Vinyl,Beige,Non- Non-Fibrous Material 80%
homogeneous,Fibrous-Rubbery,
Non-Friable
LAYER 2 None Detected Non-Fibrous Material 100%
Adhesive,Yellow,Non-
homogeneous, Resinous,Non-
Friable
5-51 HARPOON Roof Sealer,Silver,Non- Chrysotile <1% Non-Fibrous Material 99%
homogeneous,Flaky,Non-Friable
ANALYTICAL SERVICES Report Number
10744 HILLBROOK AVE, BATON ROUGE, LOUISIANA 70810 •0419142
Phone: (321)837-9837 Fax (225)478-9731
Page 1 of 2 NVLAP CODE 200670-0
Analytoical
Client: Skyler Taylor Report #: 0419142
KCB Date of Receipt: 04/23/2019
PO Box 829 Report Date: 04/23/2019
Seabeck Wa 98380 Date of Analysis: 04/23/2019
Project: 51 NE HARPOON
Sample Material
Client# Location Description Detection Composition
6-51 HARPOON Roof Sealer,Silver,Non- None Detected Cellulose Fiber 1%
homogeneous,Flaky,Non-Friable Non-Fibrous Material 99%
7-51 HARPOON Roof Sealer,Silver,Non- None Detected Cellulose Fiber 1%
homogeneous,Flaky,Non-Friable Non-Fibrous Material 99%
ASBESTOS TYPES:
Chrysotile,Crocidolite,Anthophyllite,Tremolite,Amosite,Actinolite
The samples listed above were suspect of containing asbestos. A result of"Non Detect"means a thorough search using appropriate
techniques was conducted and no type of asbestos was discovered. Samples submitted to this facility will be disposed of unless the
client requests the samples be returned. Reports will be archived for a period of no more than 3 years. The analysis performed is in
accordance with EPA 600/M4-82-020 and EPA 600/R-93/116. Test results apply only to the samples submitted.It is not our
policy to distribute the customer's information without the written consent of the customer. The test report shall not be reproduced
except in full,without the written approval of the laboratory.This report may not be used by the above client to claim product
certification,approval or endorsement by NIST,National Voluntary Laboratory Accreditation Program or the Federal Government.
Shawn Kearney Angela Kearney
Laboratory Director/Analyst President
ANALYTICAL SERVICES Report Number
10744 HILLBROOK AVE, BATON ROUGE, LOUISIANA 70810 - 0419142
Phone; (321)837-9837 Fax; (225)47B-9731
Page 2 of 2 NVLAP CODE 200670-0
s
p.
(D
� � � n
QD
0 :3 Q
9 " W CCDD N n n O n Q
O CD (D CAD CD CD
� O CEO o � C) 5, •i
� 3 Mom_
N % O
N0) m D OCp W OQ � � n ��
�\
t � z c -�
�? 'p
CD
C CD
w rn (n ..�
' p it A y . � �
O _ CD
CD V
,y W N
. ► —1
l / o (D3 rn t
_
S — CD
C-
Q
Q
CD
.. .. -:,__.>.•=..sxw,ba+..u22_..�rf.`rr�-.r s&��,,*i,r—vi-.,,.z•.t.r :.,aa ..,z a4s:-u.[ w-•.e.,s.;x .sYmo,,iu3z,••.-,.s..:x.marak'.`wi: '^+ •>xxaa: •�•'_-.*.+*. + - `j
� h
P
1
CD
o r
o
m Q C3 0
v CD r-+
o h Q-
Q z
m No sll CD c O
`n o CD 3 0 �
0 3 � 0 CDCD �.
cn m Z r+
w C1 _ CD
CD CD n
` )
Z V CD CD n � Ce--i-
M7 C) r f
�
:3C') Q O
p• 3 CD O cn O �C `O�^^
n MCD
CA -0 ��1 C) > � V
CD �J � C�•
cn Z3
CD
9 ° D CD o n n n C) (' �M CD
CD
SU O a CO CDC7 D l., �.
-n@N v0 C. Ncn
:3 CD
o 0 CIN �^
3om �, o -o o V, QO
co -0 o o O —I
z CD- `Q CD
C: 0 qlDr
_
o
CD n
� � O � CD
C-_0 � m O
VU n
V CD CC?
r
v
.tf� ►V 0
0cn
COo � O0 rnn
�o o
oCT
n o o
a 0 CNii N
, N o
.0 o 0
C= cn
o
m