HomeMy WebLinkAboutBLD2019-01026 Cancelled MFG Home - BLD Permit / Conditions - 5/30/2020 Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
F
9-01026 MANUFACTURED HOME
ESCRIPTION: INSTALLATION OF NEW MFG HOME ISSUED: 11/07/2019
ESS: 3131 E BROCKDALE RD SHELTON
EXPIRES: 05/05/2020
PARCEL: 321314490010
APPLICANT: GEORGIA L&THOMAS R PRIESKORN OWNER: ORGIA L&THOMAS R PRIESKORN
3081 E BROCKDALE RD 3 BROCKDALE RD
SHELTON,WA 98584 ELTON,WA 98584
CONTRACTOR: THE HOUSING MART, INC.
197 HAMILTON RD
CHEHALIS,WA 98532
360.269.1418
GENERAL CONTRACTOR'S LICENSE: TH HOS
MA T, INC. License: HOUSIM1D44RO
1 AMExpires: 01/11/2020
C L532
60.2
FEES: Paid Due
Modular/Manufactured Home $275.00 $0.00
Fee- 1st half collected at
submittal
Modular/Manufactured Home $275.00 $0.00
Fee-2nd half collected at ready
to issue
Building Plan Review/Change of $110.00 $0.00
Use-Onsite Sewage
Planning Review Fee $240.00 $0.00
Totals : $900.00 $0.00
REQUIRED INSPECTIONS
Setback Inspection Set-Up Inspection
Footing Inspection BLD-Final Inspection
Printed by:Nicole Norris on:11/07/2019 09:58 AM Page 1 of 4
s
Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
--- 360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2019-01026
CONDITIONS
" This permit is for the placement and installation of the manufactured home only and does not imply approval or review for
any other items indicated on the plot plan.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* The installation permit shall be displayed in clear view of the site access road. The approved site plan and other
applicable instructions, including installation instructions, shall be available in this location OR placed in the location
specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions.
* If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the
instructions of the American National Standards Institute (NCSBCS/ANSI A225.1).
* The foundation/footing must be placed on undisturbed, firm-native soil.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is
installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work
shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An
Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for
each major part of the installation. RCW43-63B.090
An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD
certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification
tag for each certified installer accounting for the work that each installer performed or installed. Certification number and
signature of the certified installer responsible for each major part of the installation. WAC365-210
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to
skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required
inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the
prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by
the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable
practices or problems that have been discovered. Until resolution of any/all problems no occupancy (Final Inspection)will be
granted for the residence.
OWNER/CONTRACTOR(indicate which)
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* Mason County has four areas with ground snow loads between 25#-55#. The owner/agent of this permit acknowledges
that if the unit permitted under this permit does not meet the area snow load rating, there is a potential for failure due to
weight accumulation beyond that of the design criteria for the unit. If you are uncertain please contact Department of
Community Services for snow load or vist our website at www.co.mason.wa.us.
Printed by:Nicole Norris on:11/07/2019 09:58 AM Page 2 of 4
'® Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
- 360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2019-01026
All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* All property lines shall be clearly identified at the time of foundation inspection.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
Printed by:Nicole Norris on:11/07/2019 09:58 AM
Page 3 of 4
� ® Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
____., 360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2019-01026
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation
should be minimized and any areas disturbed should be restored to prevent erosion and other environmental
impacts.X
* Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel.
Zoning for parcel is Rural Residential 5.
* Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
A. Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B. Septic tank(s) requires 5ft setback from all footing/foundations.
C. No foundation drains within 30ft, down gradient of drainfield/reserve area.
X
hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of a�y other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: ,d&kx, Date: =�"r
41
Printed by:Nicole Norris on:11/07/2019 09:58 AM
Page 4 of 4
� I
tr w w
O W Q V- Z Z CD g lJ- /7 0
N>,� �• a vI> a a ® w I
a
a 0D w� f zz U WZ
O ¢N ^Oo mw w6. ham] 2 Z GG
H Z M a 00'n N N OZ Y # a F U O ~~ Z 0-
LLJ W Z CJ 1t.-.� i1 ai _
O �.
Q W O LW S ^ Vt FG. G a U �) Z I Q L�
W JW^ FQ Z� ' w co
W Z Nm �7 U amm �Z al W t O Z � O VJ f
E., Q Z who a0 O_ Z
O LJ� ZZ a0K wo Up2 EF m Z Z ri aei inLJ
L*7 J FN Y QN ...w0 z 3 6 M1 40 CIEv r•I rk:--J¢J3 CO
sa oz� '3o QQLL 5 m a o a : o o< a .,�-I cn cv
F. ate¢ 2= ¢a>-
o w In d a E0E 3V.
z m S}s
W 0 Vr-Iw oo I m OOw
°
F U fQ1
]®
mar L), Z mm
O Z
a
m NZ c
WZ OZ
wo ? aso ,
_
W
tY � I
4
G 3
Z �
W �
O
Z.
a o or I r--
r m
0 0 = M)
cn r`
I ~
CD CD
O
b M I d N o
I Z o a o o IMi
CD
w
0 j m
0 § I aS
I
w
W
0 0 co �a CD .o m CC)
� co �o co co
s9 co m I 1 O �
a m a a Li Li �
J-IL vI _ m Q m m m m
--4-- o Q
b I
tv �D
.B-.9L
Y I I
o]
O I
a
I Q
81-,81
L(1
- --}- m
W
2 a l0
CO
CD
w r J m j CC r `—
w w
i W Z CI 0j O Ln
x 1 O
V LY Z >
F— ¢ 3 r
Q w J w Q0
W U w = O
ZZ m
F� WO 2W i
r co
N
A 97 /
N r7 d- Lc7 co r- 00 Q
Q m N V
w
a
I �
N E
E
O p
� U
W uJ
Z Z
O O
00 = =
U') w n. d
0
rn
Q O F
� a
c LL,
o �
� a
U) w ?
a Z
w
op O
LO m Z
co _0 O
Q U
O
nI m` Q Z
Q w Q O O
F
N to E-- U c +�
V 0O p
z W O
4-4 +r M cY Z � N a
_ LU
X J Z Q w
Zp N
O C- O Y z a ii
(p (6
U O
i N H O =- w,
V U) mN o O V w = cn m
�-; ' U) - T-
W co
Q 0 m
C/ w w ccnn U)
Z ¢ O O W w w r
� a o. a a
C
af
O
Y �
U) W
w_
Q� O Q
QCL
Z p
O Q z i
N o
0 0 _
o D O
0 z
= Z
w W
chi H U O
m
w O '�
a u u 0y
O O z C a
� U U c c
w x rn
d' Q' Z Z Z u
1 a O U a O cn i°
360-427-9670 Shelton ext.352
MASON COUNTY
360-275-4467 Belfair ext.352
COMMUNITY SERVICES 360-482-5269 Elma ext.352
Building, Planning, Environmental Health,Community Health
615 W.Alder St. Bldg. 8 - Shelton,WA 98584 www.co.mason.wa.us
CORRECTIONANSPECTION REPORT
PERMIT/CASE NUMBER Z
ADDRESS/LOCATION: ` ` 1'i �L
YH-
FINDINGS:
Items listed above must be corrected to gain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
Call for re-inspection when corrections are made before proceeding with any further work.
Make corrections, items will be checked on the next inspection.
❑ OK to
Date:, A 1 ❑ Please contact our office regarding possible
Department: I structural damage incurred by recent
Inspector: "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12