Loading...
HomeMy WebLinkAboutBLD2019-00026 Final MFG Home - BLD Permit / Conditions - 2/21/2020 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2019-00026 MANUFACTURED HOME PROJECT DESCRIPTION: NEW MFG HOME ISSUED: 03/15/2019 SITE ADDRESS: 1321 NE COLLINS LAKE DR TAHUYA EXPIRES: 09/11/2019 PARCEL: 223315100012 APPLICANT: AARON SHUMAKER OWNER: AARON T&BARBARA J SHUMAKER PO BOX 3378 PO BOX 3378 BELFAIR,WA 98528 BELFAIR,WA 98528-3378 360-2754855 GENERAL CONTRACTOR'S LICENSE: SHUMAKER CONSTRUCTION License: SHUMACI942MF Expires: 08/22/2020 360-377-2425 FEES: Paid Due Planning Review Fee $240.00 $0.00 Manufactured Home $275.00 $0.00 Change in Tenant-Minor EH $110.00 $0.00 Plan Review Modular/Manufactured Home $275.00 $0.00 Fee-2nd half collected at ready to issue Totals : $900.00 $0.00 REQUIRED INSPECTIONS Setback Inspection Set-Up Inspection Footing Inspection BLD-Final Inspection CONDITIONS Printed by:Ariane Paysse on:03/15/2019 12:01 PM Page 1 of 4 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W.Alder St. Bldg. 8 Shelton, WA 98584 m 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME BLD2019-00026 A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * This permit is for the placement and installation of the manufactured home only and does not imply approval or review for any other items indicated on the plot plan. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * The foundation/footing must be placed on undisturbed, firm-native soil. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. Printed by:Ariane Paysse on:03/15/2019 12:01 PM Page 2 of 4 Mason County MASON COUNTY Mason County Community Services C"O tMUl"+€M SERVICFS 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME BLD2019-00026 * REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been discovered. Until resolution of any/all problems no occupancy (Final Inspection)will be granted for the residence. OWNER/CONTRACTOR(indicate which) If you are installing a manufacturing home and no longer have the installation manual for the home, you must use the instructions of the American National Standards Institute(NCSBCS/ANSI A225.1). * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each major part of the installation. RCW43-63B.090 An approved Installer verification tag shall be placed on the end of the manufactured home directly above or below the HUD certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification tag for each certified installer accounting for the work that each installer performed or installed. Certification number and signature of the certified installer responsible for each major part of the installation. WAC365-210 * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * All property lines shall be clearly identified at the time of foundation inspection. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * Mason County has four areas with ground snow loads between 25#-55#. The owner/agent of this permit acknowledges that if the unit permitted under this permit does not meet the area snow load rating, there is a potential for failure due to weight accumulation beyond that of the design criteria for the unit. If you are uncertain please contact Department of Community Services for snow load or vist our website at www.co.mason.wa.us. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. Printed by:Ariane Paysse on:03/15/2019 12:01 PM Page 3 of 4 Mason County MASON COUNTY Mason County Community Services COMMUNITY SERVICES 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MANUFACTURED HOME BLD2019-00026 Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. IH * Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). " Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations. B.) Septic tank(s) requires 5ft setback from all footing/foundations. C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area. D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions any other st /loc regulating construction or the performance of construction. Issued By: q�b l Contractor or Authorized Agent: Date: �� Printed by:Ariane Paysse on:03/15/2019 12:01 PM Page 4 of 4 -n m , n n 0 0 0 2 D m � \ m m 0 pr . m m y �m2 k .0 £ q q /y 0 0 0 ƒ2 0 ƒ m m Z/ z m \ \ m 3 0 ƒ � a m ¥ / o a m « 7 $ Co \ k ® 0) > } ) / / 5 \ ® z « > 2 £ 2 § r » D D O m M 0 0 C0 CO) q 0 0 C q CD T � " \ \ 0 In x x m 0 m $ w — / \ \ -q k \ � § 3 $ q 00 0 ( E 2 0 0- 2 : m � o ECl) k - _7 \ CD { 0 k E % � $\ � "�: z f f o n D 0 / % 7 m E 2 \/ . o E C r 7 > 7 :c o � k 2 2 \ m m « ( � .2 \ # � %