Loading...
HomeMy WebLinkAboutCOM2017-00051 Final and Special Inspection and Testing Agreement - COM Inspections - 7/21/2017 0 0 K CONCRETE MECHANICAL MANUFACTURED HOME > Date By ............ Footings I Setbacks Ribbons Gas Piping o Interior Date By interior-Date By Date By cC)ii Exterior Date By Exterior-Date 0 114SULAIION Set-up n Point Load I Isolated Footings BG I SLAB INSULATION Date By 0 ate 0 D By- Date By FIRE DEPARTMENT Foundation Walls Floors Date By m Date By Data By DECKS 0 FRAMING wails Date By Date By 0 Date By PROPANE TANKS z Vault Date By 0) PLUMBING Date By OTHER Groundwork Attic Date By Date By Type. Dale By D.W.V DRYWALL Typw 0 Int Brace Wall Date By 0 Date By ic Date By FINAL INSPECTION Water Line Fire Seperation Date By Date By Date By 11 O Pass or Request Inspect. Type of In Fail Date Date Done By Comments 4 nal .............. ................... (D 01 0 oy E �El V BUILDING MAY 12 2017 o'si co . Mason County Community Services Building Division SPECIAL. INRIION & 615 WAlderStreet Shelton, WA 98584 - �- TESTING AGREEMENT 350.42Z9670 ext.352 www.co.mason.wa.Ys n� (All references are per the 20151nterrnational Building Code) Project Name: l"t' , „ k. r,4-- Project Address: 3q.?V 14E .5A cl A.// 12or. . !a eI f�; t✓ �l S S� Building Permit Number: Date Issued: BEFORE A PERMIT CAN BE ISSUED: The registered Design Professional in responsible charge shall fill out the Agreement and Include the name and address of the company or inspector. Two (2) copies of this form are to be submitted to the County prior to the issuance of a building permit. If changes are made as to who will perform the special Inspections a new form shall be submitted and turned Into the Building Permits&Inspections Division for approval. i i STATEMENT 'OF SPECIAL INSPECTIONS: In addition to this Agreement, a "Statement of Special Inspections" shall be provided per IBC 1704.3. This Statement shall be made as part of the approved plans, and be placed in a conspicuous location,such as the first page of the construction plans or the first page of the structural sheets. SPECIAL INSPECTORS: All special inspectors shall be approved by the Building Division prior to performing any duties. The special inspector shall provide proof of certification as a special inspector for each inspection Item and be licensed by the State of Washington. SPECIAL INSPECTION REPORTS: Special inspection reports are to meet the requirements of ISC 1704.2.4. Copies of each report are to be sent to the address listed in the letterhead noting the Project Address and Permit Number. A final report shall be submitted stating that all special inspection and structural testing Items were completed and are in conformance with the approved design drawings and specifications. Items not in conformance,unresolved Items,or any discrepancies in inspection coverage(i.e. missing Inspections, periodic inspections when continuous was required,etc.) shall be specifically itemized in the final report. 1 - a r in a ra...-..:• :..:,;.;.: : °.4d7 o-f'et�afo c ❑ Unapproved Fabricators(iBC 1704.2.5) Other than Structural Steel(IBC Table 170S.2.2) ❑ Steel floor&roof decks ❑ Welding of reinforcement ❑ Cold-formed steel Structural Steel iej S ❑ Welding(Per NSA of AISC 360-10) ❑ Details(Per N5.7 of AISC 360-10) X Nigh-strength bolts(Per N5.6 of AISC 360-10) Concrete Construction(per IBC Table 1705.3) ❑ Reinforcement,embeds,anchors ❑ Formwork ❑ Materials ❑ Shotcrete ❑-Post-tensloned/Pre-stressed Concrete ❑ Erection of precast concrete Page 1 of 3 Co Mason County Community Services Building Division SPECIAL INSPECTION & 615 W Alder Street Shelton, WA 98584 360.427.9670 ext.352 TESTING AGREEMENT www.co.mason.wa.us C e!qt-Ag6q A 6ress-&­C6ntabt_-Tnfbrmaq.c, ,Y Masonry Construction(IBC 1705,4) C3 Prior to Construction(Article 1.15,TMS-602) 171 As Construction Begins(Article 1.19.2,TMS-402) El Priorto Grouting(Table 1.19.2,TMS-402) L3 During Construction(Per TMS-402&TMS-602) Wood Construction E) High-Load Diaphragms(IBC 1705,5.1) E) Wood Trusses>soft(IBC 1705.5,2) 1:1 Soils(IBCTable 1705.6) 0 Driven Deep Foundations(IBC Table 1705.7) 11 Cast-in-place Deep Foundations(IBC Table 1705.8) 1:1 Helical Pile Foundations(IBC 1705.9) r7l Sprayed Fire-Resistant Materials(IBC 1705.13) 13 Mastic&Intumescent Coatings(IBC 2705.14) 13 EIFS(IBC 1705.15) 13 Fire-Resistant Penetrations(IBC 1705.16) 11 Smoke Control(IBC 1705.17) 0 Structural Steel(113C 1705.11.1&AISC 341-10) 11 Structural Wood(IBC 1705.11.2) Page 2 of 3 0N cot, �� -,� Mason County Community Services Building Division SPECIAL INSPECTION & 615 W Alder Street _ Shelton, WA 98584 TESTING AGREEMENT 360.427.9670 ext.352 Z'�s' www.co.mason.wa.us ❑ Cold-formed Steel(IBC 1705.11.3) ❑ Mechanical&Electrical Components(1705.11.4) ❑ Architectural Components(IBC 1705.11.5) ❑ Storage Racks(IBC 1705.11.7) ❑ Other 5`ru(-t'i,tlrL Jt! ) MPWQ__rAC5 (1 T1 L ❑ Other (IBC 1705.1.1) Declaration by Architect/Engi.neer S t) I, the design professional in responsible charge for this project, declare that the w�GNE$�9 above listed special inspection and structural testing items are required for this 4� oFWASkr�c 0 Apr, ett-try accordap�e with IBC Chapter 17. �rt'��w TO _6/o 1(-7 t Signature Date 53429 tC O� CrURALE� G �sslONP61, Declaration by Owner I,the Owner of the project,declare that the,a a listed firm(s)or individual(s)are hired by me to perform special inspections and tructural tesgi fo"th project pursuant to IBC 1704.2. Signature Date CONTRACTOR RESPONSIBILITY: Each contractor involved with the construction of wind or seismic force-resisting systems shall comply with the requirements of IBC 1704.4. The contractor is responsible for providing the special inspector access to approved plans and contract documents at the job site. All special inspection records shall be retained at the job site by the contractor and shall be made available to the Building Department upon request. Declaration by General Contractor I, the General Contractor of the project, agree to comply with the "Contractor Responsibility" items noted above. Shure Date -C,INs Page 3 of 3 Pl!l S►`�fS ji - G. kc-7 Dl-yxP.:74 , WA S Materials Testing & Consulting, Inc. > C Geotechnical Engineering&Consulting•Special Inspection•Materials Testing+Environmental Consulting May 12,2017 Cory Holien Facilities Planner 1 Washington State Department of Corrections Capital Planning&Development PO Box 41112 Olympia,WA 98504-1112 (360) 725-8327 (360) 890-0246(cell) cmholien a DOCl.WA.GOV RE:MCCCW Radio Toner Special Inspections and Material Testing Proposal Dear Cory: Materials Testing & Consulting, Inc. (MTC) thanks you for the opportunity, and respectfully submits the following proposal to provide materials testing and special inspection services during construction of the above-referenced project. All services will be provided on a time and materials basis. Although dependent on the actual construction schedule and Sequencing,D1TC will only bill for actual work-performed,regardless of the raxouuts estimated. Our project manager will review weekly budget status reports,and invoices will be sent on a monthly basis. No work will be performed beyond the scope and cost estimate without your prior authorization. Each of MTC's laboratories are regularly audited by the American Association for Laboratory Accreditation(A21-A)as well as the Washington Association of Building Officials(WABO). We are specifically recognized to meet the requirements of ASTM C1077, D3666,D3740,E329,and AASHTO R-18 standards for agencies engaged in construction materials testing. Our proposed inspection team includes WABO certified senior special inspectors with decades of collective experience and together have worked on thousands of projects throughout the Northwest totaling over$4 Billion in construction costs. In order to provide cost reductions and more efficiency to your project, and to reduce our global footprint, MTC provides the advantage of electronic reporting, distribution, and storage of all the inspection reports produced for your project(s) through our secure, online system called the Digital Paper Route(DPR). The DPR is an online report distribution and project management tool which not only enables full-time,web-based access to all of our testing and inspection reports,but also provides daily updates of the project budget allowing our clients to review both overall contract amounts and "drill down"within a project to further evaluate specific inspection or lab tasks. The DPR service is provided free of charge to all our clients and their appointed project team. Additional information and further illustration of this service is included in this proposal. In closing, our experienced inspection staff will ensure the highest level of quality is brought to your project. We believe that our local staff and vast experience on projects of similar size and scope make MTC the clear team member of choice for this project. We look forward to working with you. Respectfully Submitted, y �s� Deane Ramsdell Senior Project Manager Attachment(s): Bid Form,Bid Assumptions, Corporate • 777 Chrysler Drive • Burlington, \VA 98233 • Phone 360.755.1990 • Fax 360.755.1980 SVV Region • 2118 Black Lake Blvd. S. V.• Olympia, WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NAY Region 805 Dupont St, Suite 5 • Bellingham, WA 98226 • Phone 360.647.6061 Fax 360,647.8111 Kitsap Region 5451 N.W. Newberry Hill Road, Suite 101 • Silverdale, WA 98383 • Phone/Fax 360.698.6787 Visit our website: wu•w.mtc-inc.net Page 1 of 6 Trish Woolett- FW: FW: Tower at Sand Hill Rd From: "Holien, Cory M. (DOC)" <cmholien@DOCI.WA.GOV> To: "Trish Woolett(Tw@co.mason.wa.us)" <Tw@co.mason.wa.us> Date: 6/23/2017 2:44 PM Subject: FW: FW: Tower at Sand Hill Rd CC: "Zuniga, Jose R. (DOC)" <jrzuniga@DOCl.WA.GOV> Attachments: 160949-ERECTION DRAWINGS.PDF; Modified copy of 160949-ERECTION DRAWINGS.PDF Trish, Attached is an Engineer Stamp Erection set of drawings for the tower. MTC Inc. will be conducted the bolting inspection. Please advise on the next steps. Thank you, Cory Holien I Facilities Planner 1 Washington State Department of Corrections Capital Planning&Development (360) 725-8327(office) 1 (360)890-0246(cell) I cmholien@DOCI.WA.GOV www.doc.wa.clovlbusiness/capitalprocjrams/ From: Luke Nixa [Inixa@sabreindustries.com] Sent:Thursday,June 22, 2017 1:15 PM To: Holien, Cory M. (DOC) <cmholien@DOCI.WA.GOV> Cc:Zuniga,Jose R. (DOC) <jrzuniga@DOCI.WA.GOV> Subject: RE: FW:Tower at Sand Hill Rd Cory/Jose, Please see attached. Hope this helps! Thanks! **P/ease note my new office and cell numbers! Regards, LUKE NIXA, PMP -Construction Project Manager Sabre Industries, Towers & Poles/Government Services A Division of Sabre Industries, Inc. C: 712.422.0822 E: LNixa(d.)sabreindustries.com Sabre Industries,Inc.("Sabre)E-MAIL NOTICE-This transmission and any attachments may be confidential or subject to a legally recognized privilege and is intended only to be received and read by the proper party having a reason to send communications to or from Sabre. If you do not believe that you are the proper recipient of this message because of its address,contents and/or otherwise believe that this message was sent to you in error,you should not disclose,print,copy file ///C /L7sers/Trishw/APPData/Local/TemP/XP�Pwise/594D293BMasomail1001626B... 6/26/2017 lx Materials acting & Consulting, Inc. ' GwieAniral F &ConvAing a Special Impmtin*MaleriahTesting i Environmental Ceerselt F-nXk ymdAssrwann S mcw MCCCW Radio Tower- 17KO22 - Field Report: Concrete: Report#F82814 CLIENT Washington State Department of Corrections DATE 07/21/2017 PROJECT LOCATION 3420 Sand Hill Road PERMIT# Belfair WA 98528 Inspection Information: ...._...........................................__............. _,_...._._ _...._..__ Inspection Date: 07/21/2017 Time Onsite: 1400 Weather Conditions: j Partly Cloudy,60s*F Inspection Performed: Concrete Comments: -��m- MTC onsite to perform observation and testing of concrete placement for the radio tower foundation as follows: l Sheets: 1 of 1 Locations:Radio tower foundation Elevations:-3.5'below to the top of foundation Detail:none j , Drawings conform to the 2015 International Building Code. REINFORCING STEEL:Periodic Inspection No inspection required as per engineer. CONCRETE PLACEMENT:Continuous Inspection i f Observed the placement of approximately 19 CY of Cal Portland concrete mix design#3400,28 day strength @ 5000 psi.Required strength @ 4500 psi. Concrete was placed into the foundation forms by truck chute,consolidated by high frequency mechanical vibrator and hand finished with trowels. MTC performed temperature and slump testing in accordance with project specifications.One set of 5-4"x8"cylinders were cast for compressive strength testing.Please reference sample report#C48195 for additional information. To the best of my knowledge,work performed that was visually inspected was in conformance with the approved plans dated 05-10-2017. Images: UPLOADED: 07/21/2017 15:47:00 REPORTED BY:Emily Knutsen REVIEWED BY:Tim Macke,Technical Director az7.;,�,+tt�r...h�:,,rsp.a.t:c..s..�.,Ri�...,;.kA..,..n..4a�..,..�ar..-..r...� r,.+..a,,,k(scq w„1...ra+,v.a�.}c.,��+r.;ae�eae�h.+�.,der w.�wrrsn���r�v.+,. .�Y...a...wtw.�+....is�db••r�...r..d�r.+:�+. ,.;�M.,s.... es�aa: et aJ�x e9Y aM nT�nai+awn sn ti a�'�drate.�{ym�.C 3V1r-3s13 6 411 rijk-r—f,,J. Corporate • 771 Cbrysltr Drive * Rurlingtsa, WA 99233 * Phase 360.7S3.1994* Fax 3`t1.736.19119 SW ItegiaR t 1 k►aack I.att Htvtt.. . '.* Olyenpia, WA '90112 . Plane W1.534.q77? - Fax N'I? Region * 905 Drtpow Strccl, Svitc 5 • Relliagham, WA 9922S * Phone .1641.641.tUil ` Fox :160.4 7AI tt Visit our wehs.ile: 5tY'w� ffit inc.r„t MCCCW Radio Tower-17K022,07/2112017,#F82814,Page l of I Materials tip & Consulting, Inc. (;Wk%hnlcsl f. ' A-Cvnsuking*apecial Mspcsitim*Materials Te c*Enr nnnmental C4multing Fmigarrarrd A nurnum Siam ltfi8 P �` MCCCW Radio Tower - 17KO22 - Compression Test: Concrete: Report#C48195 - DRAFT CLIENT Washington State Department of Corrections DATE 07/21/2017 PROJECT LOCATION 3420 Sand Hill Road PERMIT# Belfair WA 98528 Inspection Information: Inspection Date: 07/21/2017 Time Onsite: 1400 Weather Conditions Partly Cloudy,70s*F t Inspection Performed: Comp ression Test.Concrete w............... . �...., � Field Data (ASTM C-31): Location of Placement: Radio Tower Foundation .-»............ .- .-.. Sample Location: Lower half of foundation Contractor: abre Industries,Powers and Poles J Subcontractor:Slaterwin-__ d euppiter/Plant:Cal Portland/#778 _. _...m . Qty Placed,Cu.Yd.: of 19 Slump,Inches(ASTM C-143)or W/C Ratio 4.75 Concrete Temp,°F(ASTM C-1064): 7g Delivery Ticket#:'1657318 Job Spec.Slump:;N/A Ambient Temp,IF:1761 ..� Truck#.;7233 Air Content,%(ATSM C-231): N/A Min Temp,IF: __ L_ Batch Time: 1429�� .Job Spec.Air: N/A� Max Temp,IF:} Sample Time:f­1520 ............ . Mix#and Proportions: 3400/9 50 CY ....._._... .... ._.W._ _ _ Cement,lbs 95790 Coarse Agg,lbs.:L3/4 17600 Admixture,oz./cwt: �.m _a �..m Flyash,Ibs F _.. Coh9,lbs.: w Admixture oz lcwt i Water,gals169 � Coarse,eig ,lbs _ ®�� Admixture,oz/ewt Fine Agg,Ibs14000 .� "oarse�Agg,lbs.: Admixture,oz./cwt: Gallons of water were added ®Prior toiJimpling Sample Type & Compression Test Results: Received 07/22/2017., Sample Set 1 oft Type of Compression Test &ricrete(ASTM C 39) Lab Tests: Test Total: Sample Comp. Sample Break ASTM ASTM New Log# Age Date of Test Load Area(Sq. Strength Tested By (Days) (L6S) Dim.(In.) In.) (PSI) ( Type C-617 C-1231 3948. 7 07/28/201 a W.z.. _ r__ _ FI_.. ❑ ❑ 3949 28m08/18/201711 _. �.. . , _ _ _._0. . ❑ ❑3950 28 108/18/20171 „�_ji __. 1 .._; ._ ,.... `.. 0.. 3951 28 108/18/2017 ®` � , 3952 H_iL ----- .. �t _ _7�.._ m__..a. �� . F., ,� _...� __ ..._e, [mW,mO J ❑ ❑ 3953 4 107/25/201749,943 3.99 12.50 . i 4 000 W i Stan Mendell 3 REQD28. 4000 ..m Remarks: ........_- m Please refere­-1-111111111nce field report#F82814 by E Knutsen for more information. er�.�rRSwa r.vr& r*# nftr'",to ecsan oJxmtk-Tuner.area-1 f 3401• 3Oil MxerrinN I ,,in# A C,igokmo.4er do i4b,� tezr�s,l. Corporate w 771 Cbrysier Drive* Burlington,WA 992 S * Phame 360.7SS.1 +9p* Fax 364.735.1986 Sw Rct[ion 2111 t41#tlt 1-wile 1,11vd. S.W.- Olympia, WA 90112 . Phone 360.134.97l? * Fax 360.134.9 79 NW Rvgla■ * Nei Vuptirtt 5lttttt, Suitt 3 * Relliagham, W'A 911231. Phone 3t0.641.411,61 . Fay .160.6-47.R111 Visit Maurwellshr: �,nw mic ir,rmazt MCCCW Radio Tower-17K022,0712112017,#C48195,Page I of 2 Materials Testing & Consulting, Inc. ' Cret*iAnical Fo0waft.9,Con Ling O+p dul ln%W"f n i HM*Ha1%Teaifm6 Enaananmental Cowelfitu FxX~mdAnwuuro Siwnt ftt4f REPORTED BY:Emily Knutsen REVIEWED BY:, nrrra: za r'e H'k amr ae�,C�fc.anxJ�air��a av+esen+f' •� C 1 �R-7(II A al'ijN Ifn"1 I A S'a mule§m�.J'er 4,[I tijb-rxeI,, J. Corporate * 777 Chrysler Drive * Burlington, BRA 99233 * Pbnrr 368-7$3-1990* Fax 364_753.19SO w Region • t I 1 141ack 1,ak-e Ntvd- 8 W,•Olympia. WA 190112 - phoor #fit-10—Wl fax ;46(1_SA4.5e'779 NW Region • 90 Dupori atrc t, Suitt 5 . 1tr11ingham, WA 99221 * Phone .460.64-1.40,61 Fak 360.647AI11 Visit our wehsiie: swow��.nrtc ir.+t.a�c MCCCW Radio Tower-17K022,07/21/2017,#C48195,Page 2 of 2