HomeMy WebLinkAboutCOM2017-00059 - COM Inspections - 7/11/2018 0
0
CONCRETE MECHANICAL MANUFACTURED HOME >
C) Date By
Footings I Setbacks Ribbons rn
Gas Piping
C)C) interior Date By Interior-Date By Data sy
INSULATION
0
(n Extem Set-
Date By Exterior-Date Bv 0
(0 up -n
Point Load I Isolated Footings Date By 0
BB I SLAB INSULATION 0
Date By,
Data By FIRE DEPARTMENT
Foundation Walls Floors Date By M
B
Data y 0
Date By DECKS
FRAMING Walls Date By
Date By Date By PROPANE TANKS z
PLUMBING Vauk Date By Cn
Data By OTHER
Groundwork Attic
Date By Type:
Date By Date By
D.W.V DRYWALL Type 0
Inc Brace Wall Date, By 0
Date By I By
I FINAL INSPECTION Q
Water Line Fire Sepemtlon _L
-4
Date By Date By Date By
O
Pass or Request Inspect.
-Type of Insp. Fail Date Datp Done By Comments
5"
4
0
4