Loading...
HomeMy WebLinkAboutCOM2020-00053 Dominos Change in Tenant - COM Permit / Conditions - 8/3/2020 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us F 0-00053 NEW COMMERCIAL PERMIDESCRIPTION: DOMINOS CHANGE IN TENANT W/TI ISSUED: 08/03/2020 0023)ESS: 23969 NE STATE ROUTE 3 BELFAIR EXPIRES: 01/30/2021 PARCEL: 123294190021 APPLICANT: ACAH INVESTMENTS LLC OWNER: ACAH INVESTMENTS LLC 5312 PACIFIC HWY E 5312 PACIFIC HWY E FIFE,WA98424 FIFE,WA98424 VALUATIONS: FEES: Paid Due B VB Business 1623.00 $219,088.77 IFC Plan Check Fee $593.50 Building Permit Fee $1,826.16 Pre-application meeting - Major $220.00 $0.00 EH Plan Review Planning Commercial Review $380.00 $0.00 Fee Plan Check Fee $1,187.00 $0.00 State Fee-Commercial $25.00 Mechanical Base Fee $30.00 Plumbing Base Fee $25.00 Plumbing Fees $63.00 Mechanical Fees $45.00 Technology Surcharge $63.52 Total: $219,088.77 Totals : $1,787.00 $2,671.18 FIXTURES (3ty Mechanical Fixtures Qt C Plumbing Fixtures 1.0000 Gas Outlet(s) (1-5) 1.0000 Number of Clothes Washers 1.0000 Dryer Vent(s) 1.0000 FLOOR SINK 1.0000 Other 1.0000 SINK-3 WITH DRAIN 1.0000 Number of Water Heaters and or Vent Printed by:Genie Mcfarland on:08/03/2020 10:34 AM Page 1 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 ca Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2020-00053 0 ty Mechanical Fixtures Qty Plumbing Fixtures 1.0000 For each ventilation system which is not a portion 3.0000 Number of Kitchen Sinks of any other permitted heating or air-conditioning system REQUIRED INSPECTIONS Framing Inspection Fire Marshal Final Rough-Plumbing Inspection BLD-Final Inspection Gas Piping Inspection CONDITIONS All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All changes to"approved building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. " CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. " OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null& void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Printed by:Genie Mcfarland on:08/03/2020 10:34 AM Page 2 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 00 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2020-00053 * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not be used until the final inspection has been performed and approved by a Mason County building inspector. * Lever hardware is required at doors. The unlatching of any door shall not require more than ONE operation. Hardware with locks must open with a single action from the egress side of the door. Door hardware shall allow egress doors to be readily open able from the egress side without the use of a key or special knowledge or effort. Handles, pulls, latches, locks and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight- grasping, pinching, or twisting of the wrist to operate.X * All wall cavities serving as exterior walls, exposed during construction or remodeling work shall be insulated to the full depth of the wall cavity and inspected prior to covering. Insulation R-values shall be as follows: 2x4 wall cavities min. R-15 and 2x6 wall cavities min. R-21. * All doors shall be pivoted or sides hinged and swing in the direction of exit travel. Means of egress doors shall be readily distinguishable from the adjacent construction and finishes such that the doors are easily recognizable as doors. Egress doors shall be side-hinged unless specifically exempted in the Section 1010.1.2.1 & 10.10.1.2 of the International Building Code& International Fire Code. X * Parking shall be sufficient for standard parking stalls (9 feet by 20 feet)and handicap parking stalls (12.5 feet by 20 feet) with sufficient maneuvering aisles. Handicap stalls shall be of a smooth surface at level or ramped to entry, located closest to the building entry, and shall be signed with the International Symbol of Access. Screening from adjacent residential properties is required. Printed by:Genie Mcfarland on:08/03/2020 10:34 AM Page 3 of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 ca) Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2020-00053 * In accordance with Washington State Energy Code Section C405.2.1 Occupancy sensor controls shall be installed to control lights in the following space types: 1. Classroom/lecture/training rooms 2. Conference/meeting/multipurpose rooms. 3. Copy/print rooms 4. Lounges 5. Employee lunch and break rooms. 6. Private offices. 7. Restrooms. 8. Storage rooms. 9. Janitorial closets 10. Locker rooms 11. Other spaces 300 square feet or less that are enclosed by floor-to-ceiling height partitions. 12. Warehouse spaces. Occupant sensor controls (WSEC Section C405.2.1.1)shall comply with the following: 1.Automatically turn off lights within 30 minutes of all occupants leaving the space. 2. Be manual on or shall be controlled to automatically turn the lighting on to not more than 50 percent power. Exception: Full automatic-on controls shall be permitted to control lighting in public corridors, stairways, restrooms, primary building entrance area and lobbies, and areas where manual-on operation would endanger the safety of security of the room or building occupants. 3. Shall incorporate a manual control to allow occupants to turn lights off. Washington State Energy Code Section C405.2.1.2 Occupant Sensor control function in warehouses. In warehouses, the lighting in aisleway and open areas shall be controlled with occupant sensors that automatically reduce lighting power by not less than 50 percent when the area are unoccupied. The occupancy sensor shall control lighting in each aisleway independently and shall not control lighting beyond the aisleway being controlled by the sensor. " Storage racks greater than 69" and up to 8'0" in height shall be installed in accordance to manufacturer specifications for seismic attachment. When seismic attachment is not provided by the manufacturer an engineered design and attachment details shall be required. Installation specifications or engineer's design shall be available during inspections performed by the Mason County Building Department. Storage racks greater than 8-ft in height shall require an engineer's design addressing seismic conditions and attachment. In addition, storage racks 8-ft tall or more shall require special inspection performed by the design professional or an approved representative. The special inspection report and engineered design shall be provided to the Mason County Building Department for approval prior to the final occupancy inspection " Accessibility—Site Arrival Points Accessible routes within the site shall be provided from public transportation stops, accessible parking, and accessible passenger loading zones and public streets or sidewalks to the accessible building entrance served. Provisions for the accessible route shall be designed in accordance to ICC A117.1. Slopes shall not exceed 1:12 and shall be continuous and unobstructed that consist of walking surfaces and marked crossings at vehicular ways. The route shall be at least 36-inches wide, except at doorways. When a route turns around an obstruction the width shall be at least 48-inches wide. A clear space of at least60-inches by 60-inches shall be provided at intervals of 200-feet or less for passing. Curb ramps shall be at least 36-inches wide with a maximum slope of 1:12 horizontal with flared sides in accordance to ICC A117.1. * Where parking is provided the number of accessible parking spaces shall be provided in compliance with IBC Table 1106.1. Where the total parking spaces provided are 1 to 25, not less than one accessible parking space shall be provided. The accessible parking space shall be located on the shortest accessible route of travel from adjacent parking to the picnic and playground area. The accessible parking space shall be constructed in accordance with ICC/ANSI A117.1-2003, Section 502. A copy of the specifications is attached to the approved construction plans. The accessible parking space shall be marked, not less than 96-inches wide and shall extend the full length of the parking space. The accessible space shall be identified by approved signage that display the international symbol of accessibility not less than 60-inches above the floor of the parking space, measured from the bottom of the sign. * Hood and Hood suppression must be permitted and inspected and approved prior to calling for Final Occupancy inspection. This is a separate permit and Inspection from Tenant Improvement Permit. * Suppression system shall be tied to the fire alarm system as a separate zone. Printed by:Genie Mcfarland on:08/03/2020 10:34 AM Page 4 of 5 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 GOO Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW COMMERCIAL PERMIT COM2020-00053 * Know Box is available on-line at www.knoxbox.com. Contact North Mason Regional Fire Authority for installation requirements at (360)275-6711 * Per public works Richard Dickinson-"Project proponent did not provide a drawing showing plumbing fixtures Wor drains. Appropriately sized grease traps Wor grease interceptor is required for connection. Please consult uniform plumbing code for ordinance." Consult with Kayla Hamme (EHS, food lead)for kitchen installation. Sheds available at khamme@co.mason.wa.us, 360- 427-9670 ext 361. 1 hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorize A ent: � Dater ice` Printed by:Genie Mcfarland on:08/03/2020 10:34 AM Page 5 of 5 MASON COUNTY 615 W.Alder St Bldg 8,SHELTON,WA 98584 COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 BELFAIR:360-275-"67,EXT 352 Buildln%Plawmir4 Environmental Health,Community Health ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an Inspection call or visit httpJ/www.00.mason.wa.us/communl"eMces/bld-inspecUon.php Permit Number COM2020-00053 Date Issued 08/03/2020 Issued By Project Dominos Change in Tenant W/TI(FIR2020-00023) Site Address 23969 NE State Route 3 Applicant ACAH INVESTMENTS LLC Contractor Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW COMMERCIAL PERMIT Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Depitartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing -Zq Groundwor Gas Pipe Mechanical Gas Piping 114* g,_._ �7,� Je L Shear Wall N 'lin Underfloor ` s 7,F.#9 1 Other 114,442 t 6y� Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building 11_JF2,oz.0 J L Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other ��Cou �/c` W E 1( 4-V �w l tk( l- -}� t�e✓ _7z1 "- l L�etrac afire ` 16 �f In,,4t t(ufvt to , t'1`tin, 1 .&'t.( 1 V-34 d IZ--