RESOLUTION NO.---20
Six-Year Transportation Improvement Program
WHEREAS,in compliance with 136-15 WAC,Mason County has prepared the
attachment Six-Year Transportation Improvement Program for the period January 1,2021
through December 31,2026; and,
WHEREAS,the Board of County Commissioners hereby certifies that the priority array
of potential projects on this County's road system,including bridges,was prepared by the
County Engineer during the preparation of the said Six-Year Transportation Improvement
Program; and,
WHEREAS,the Board of County Commissioners reviewed the current bridge condition
report as prepared by the County Engineer on June 8,2020; and,
WHEREAS,the Board of County Commissioners finds that the proposed 2021-2026
Six-Year Transportation Improvement Program is consistent with the County Comprehensive
plan; and,
WHEREAS,the Board of County Commissioners has held a public hearing on this 3'
day of November, 2020.
NOW,THEREFORE,BE IT RESOLVED,that the attached Six-Year Transportation
Improvement Program for 2021 through 2026 be adopted,which is hereby incorporated and
made part of this Resolution.
BE IT FUTHER RESOLVED that the County Engineer is hereby directed to distribute
copies of the Six-Year Transportation Improvement Program for 2021-2065 to all required
agencies. LT
ADOPTED this day"of MW020.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
ATTEST:
` SHARON TR SK, Chair
MCKENZIE WITlY,Clerk of the Board
RANbY RLIN,Vice Chair
APPROVED AS TO FORM:
KE IN S Y,Commissioner
TIM WHIT DPA
cc: Commissioners
Public Works
Community Development
County Road Admin.Board
WSDOT
Six Year Transportation Improvement Program
Agency: Mason County From 2021 to 2026
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/3/2020 Adoption Date:
City No. --- MPO/RTPO:Peninsula Amend Date: Resolution No.:
'Project Identificatlori` '- '` -' z `' P'ro'ect:05st's in Thousands of Dollars' -FeddrOI Funded`
m A.^Federal Aid No. B. Bridge No. o, `Fund'Sou�celnformation Expenditure Schedule -Pro ectsOnl:
o C.Project Title ' J mYm ` Federaifundin R/W
E n. D. Street/Road Name of Number � .o t Phase Federal Federal State 4th -Required
E. Beginning MPor road-Ending:MP or road Z. a s Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru'Envir Type Date
F. Describe Work to be Done (mm/dd/ Code Phase Source Funds Funds Funds 6th mm/
1 3 6 '8 9 1 10 11 12 13 14 15 16 17 18 19 20 21
CRP PE 1/1/2021 STP 25.95 4.05 30 15 15
E.Agate Road Resurfacing Project RW
07 1 Rd.No.: 23910 0.68 CN 6/1/2021 STP 368.374 57.491 426.865 212.9 212.93 E N/A
From: MP 3.10 To: MP 3.78
_.,,.:._ .._.-1 13Fel.,....„ � m �..
-T,ota•2021 Pro ect Cost �$�456iS65j TOTALS 394.324 61:541 r455:865 15.�r. 15 272:9;212'.93
CRP PE 1/1/2021 STP" 25.95 4.05 30 15 15
Old Belfair Highway Resurfacing Project - RW
07 2 Rd.No.: 98250 1.00 CN 6/1/2021 STP 344.969 53.839 398.808 199.41 199.4 E N/A
From: MP 0.20 To: MP 1.20
to-RI t2d21 Proiect TOTALS.;"¢ 370i91'9 57i889" 428.898 15 -16''199:4;'199A
CRP PE
Boyer Road Resurfacing Project RW
09 3 Rd.No.: 03630 0.50 CN 6/1/2021 168.9 168.9 168.9 E WA
From: MP 0.00 To: MP 0.50
Gravel to Chip Seal
TotaP3021.P.�o eci CosF�`", a P1, 900 TOTALS
CRP PE
Snider Road Resurfacing Project RW
09 4 Rd.No.: 19210 0.18 CN 6/1/2021 94.7 94.7 94.7 E NIA
From: MP 0.00 To: MP 0.18
Gravel to HMA
Tit ffd l _
Pro'e C st7, -7, , -$97,b0' TOTALS - 997 917 „.
°94.7
CRP PE
Sunny Slope Road Resurfacing Project RW
09 5 Rd.No.: 61950 0.55 CN 6/1/2021 222.7 222.7 222.7 E NIA
From: MP 0.00 To: MP 0.55
Gravel to Chip Seal
T6t912021P,ro'e6tCost $222;700 TOTALS°^-. ;u-" `,"-.222a '4222:7 `r ":222.7 '
07 PE 10 10 10
0g Programmatic Bridge Program RW 5 5 5
CN 50 50 50
17
18
Tolal.2021"Pro"ectCost�'�"- $.65;000 TOTALS',- ""s, `"� ^'65.. -:65 1 -'5 ,. 50`."
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP-Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and Stale
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 1 of 6
Six Year Transportation Improvement Program
Agency: Mason County From 2021 to 2026
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/3/2020 Adoption Date:
City No. MPO/RTPo:Peninsula Amend Date: Resolution No.:
_.,.__._a_.__...__._ ___ _____...... _..a__.._ _.__ _ ,.
'Pf6j ctldentification —.. - ___ _._____ proecfCoslsinThousands"of'Dollars" -' ``" '"`` �`'' —Federally^Fundetl"
A. Federaf Aid No.: B. Bridge No. a, `-' - Fund Source lnfdrmation - Expenditure Schedule " Projects Only
9 " C. Project.Title. m` 6 m Federal Fundin R/W
o a Z, D. Street/Road Name of Number _ o t Phase Federal Federal State 4th EnviFType `Required
u- E. Beginning MP or road.-Ending MP or road o a a Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Date
F. Describe Work to be bone ~ (mm/dd/y Phase Source: Funds Funds.. Funds ` 6th mm/y y
1 3 6 8 9 10 11 12 13 14 15 16. 17 18 19 20 21
07 PE - 10 10 101 10 10 30
08 County-Wide Small Capital Projects RW 5 5 5 5 5 15
09 7 _ CN 85 85 85 85 85 265
17
18
19 Total 2021 Pro'ecf Cosh.-'. $:100;0001 TOTALS`' „"' , n a .`„„ - ` `""' ' a*-100 =100 ^'100 '100 100-"";300
07 PE 10 10 10
08 Neighborhood Roadway Safety Grants RW
09 8 _ CN
17
18
19 fotaL2021 Proecf'Cost $:10,V001 TOTALS
CRP2006 PE 1/1/2015 HSIP 4.5 0.5 5 5
Bear Creek Dewatto Road Clear Zone RW 2/1/2021 HSIP 15 15 15
07 9 Rd.No.: 79800 1.50 CN 4/l/2021 HSIP 222 318 540 540 DCE - 2121
From: MP 5.2 To: MP 6.7
Clear Zone Project
Total 2�21'^Pro eci Cost "� $660;000 TOTALS ":' °HSIP °226.5" 333".5 560 560
CRP2022 PE 12/1/2020 RCO 47 8 55 55 5
Uncle Johns Upper Culvert RW 2/1/2021 10
09 10 Rd.No.:23500 _ CN 7/1/2021 RCO 430
From: MP 0.64 To: MP 0.64
Replace existing culvert with a new structure
^'iofal{20'2�ProectCost-„ ',., ,$55,000 TOTALS.,,,, 55 „"`55 -:945
CRP 2023 PE 12/1/2020 RCO 298 52 350 350 50
Uncle Johns Lower Culvert RW 1/1/2021 _ 20
09 11 Rd No.:23500 CN 7/1/2023 2580
From MP 1.02 To:MP 1.02
Remove existing culvert and replace as needed
TotaY2021 Project Cost $350,000 TOTALS,' '" j;.._"� o ��"" � '.'". r 2967 �;52 w, .� ,r 35A .350, ''70 ""62560
CRP 2024 PE 7/1/2020 RCO 47 8 55 55 5
Dayton Creek Culvert RW 2/1/2021 10
07 12 Rd No.:04450 CN 8/1/2021 RCO 430
From MP 0.33 To:MP 0.33
Replace existing culvert with a new structure
fotaaT2021 Proect-Cost -fir"$5Kd00 TOTALS. _ " ' 47, ' -- 8,'`° 55 55 A45
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP-Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and State
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 2 of 6
Six Year Transportation Improvement Program
Agency: Mason County From 2021 to 2026
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/3/2020 Adoption Date:
City No. - MPO/RTPO:Peninsula Amend Date: Resolution No.:
Project Identification' `" "' "- ''L Project Cos&in Thousands of Dollars '' °'`Federatly=Funded `
A.'Federal Aid No. B. Bridge No.` :m Fund Source.information Expenditure Schedute Pro eels Onl'
o S.E. `C Project Title m ' Federal Fundin - .:.° .._,,R/W.
Paz' D. Street/Road Name of Number :9 '8 t. Phase 'Federal Federal State 4th Envir Type Required'
a E. Beginning MP or road-Ending MP or road o a a Start Fund Cost by Fund State Local' Total 1st 2nd 3rd thru Date
F. Describe Work to be.Done _ ~ mm/dd/ Code Phase Source, Funds Funds Funds 6th mm/
1 3 6 8 9 10 1 11 1 12 13 1 14 15 16 17 18 19 20 21
PE 2/1/2021 STPR 730.01. 9.99 740 370 370
Harstine Island Polyester Overlay RW
07 13 Rd.No.: 30000 0.10 CN 6/1/2021 1954.9 305.1 2260 753.3 753.3 753.33
From:0.12 To: 0.40
Deck Repair
Tota12021Pro'ect Cost ', ,$�,000;000� TOTALS; 2684.91. n,° 315.:09'.,`-"":3000 370 „1123 753:3''753z33
Clear Zone Improvements PE 5/1/2020 HSIP - 89.1 9.9 99 49.5 49.5
07 Rd.No.:91100-Arcadia Road RW 7/1/2021 HSIP 19.8 2.2 22 22
07 14 Rd.No: 04450-Highland Road. 14.76 CN 1/31/2022 HSIP 984.6 109.4 1094 54.7 54.7
07 Rd.No.: 90100-Shelton Matlock Road
08 Rd.No.: 14880-Kamtiche Point Roadi
Tbta12021 Pro ect"Cost,T ';_.$1,2'115,0001 TOTAL"S-"' 1093.5=.` '121'5, 's a.' 1215 :49Z ,"71.5 54.7°' 54:3
CRP 1993 PE 1/1/2019 RATA 16.851 3.148 19.999 20
Shelton Matlock Road Culvert Replacement RW 9/1/2020 20 20 20
07 15 Rd.No.:90100-Shelton Matlock Road _ CN 7/1 512 0 2 1 RATA 387.59 72.407 459.999 460
From: MP 8.03 To: MP 8.03
Replace existing culvert with a new structure
CaP2021 fro ect t;°ost` ,., $ 9, 9. TOTALS,`_, 95.556" ;499.998 ,`20'rj;,20
CRP PE 1/1/2020 200 200 200 200
Belfair Connector-Log Yard Road E RW 10/1/2020 50 50 50 100
16 Rd.No.: _ CN 3/1/2021
From: SR3 To: Belfair Freight Corridor
Design for new construction
Tota;202"1"Pro eat Cost `�"$250,000 TOTALS` """"250 -"" "'T250 300
CRP 2019 PE 6/1/2019 50 50 50
Belfair Connector-Romance Hill RW 7/1/2020 50 50 60
09 17 Rd.No.: 86500 _ CN 3/1/2021
From: SR 3 To: Belfair Freight Corridor
Design for new construction
Total 2021 Pro'ecFCost; $100,b00 TOTALS ' "i00" 11'W. :11 100
PE 1/1/2018 FbD 10 10 10
Skokomish Valley Road Reconstruction RW 1/2/2022
08 18 Rd.No.:41640 0.40 CN 3/1/2023 FLAP 1600 TBD
From: MP 3.8 To: MP 4.6
Road reconstruction partner w/Mason Cons Dist$8M total project cost
Iota- 21 00ject Cos $_1,000 TOTALS '" 10" 10' 10 +1600
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP-Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and State
RW-Right of Way HSIP-Highway Safely Improvement Program TAP-Transportation Alternatives Program Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 3 of 6
Six Year Transportation Improvement Program
Agency: Mason County From 2021 to 2026
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/3/2020 Adoption Date:
City No. MPO/RTPO:Peninsula Amend Date: Resolution No.:
Project Identification "` '` "Project Costs in Thousands of Dollars - ': 'Federally Funded
A. Federal Aid:No. B,'Bndge No. rn ' . _ `= Fund Source'Information •Expenditure Schedule Pro eds 661V
o `o E C. Project ,o N. Federal Fundin R/W
o D. Street/Road Name of Number 5 .o z Phase Federal Federal State 4th- Required
o.z E. Beginning-MPgr road-Ending MPorroad o a a Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru�EnvirType .Date
F. Describe Work to be Done ~ mm/dd/ Code Phase Source Funds Funds Funds 6th mm/
1 3 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21
CRP 1995 PE 6/1/2019 RATA 50 5 55 55 20
North Shore Road-Cady Creek Culvert Replacement RW 1/1/2021 20
08 19 Rd.No.: 70390-North Shore Rd 0.10 CN 7/1/2022 RATA 500
From: MP 6.9 To: MP 7.0
Replace existing culvert with a new structure
Tolat21 Project:Cost` -'�" -55,bOD TOTALS k 5040
CRP2011 PE 6/1/2019 RATA 34 6 40 40
North Island Drive Culvert Replacement RW 1/2/2021 20
07 20 Rd.No.:39630-North Island Drive 0.01 CN 7/15/2022 RATA 720
From: MP 3.46 To: MP 3.47
Replace existing culvert with a new structure
.."�„�2,0-.l,...-ro7-ct` .....,.,_.7.,.�a.„.-,. -4-0-, „y�
Tota12021Pro'ectCost •s, „$40,00 TOTALS' "'�` "" °'"` "''. 34' "".16, " ""40" 40 ,20 "'724."=% "
CRP2001 PE 10/1/2019 5 5 5 25
Homer Adams Road Culvert Replacement RW 3/1/2020 10
09 21 Rd.No.:00610 0.10 CN 8/1/2020 300 20
From: MP 0.1 To: MP 0.2
Reconstruction
ffota1"2021 Pro ecf-Cost ._'; T-^$6;00'D� TOTALS "'" ' `"` "`'. ,,,"°�:� , , .:. ;�..:,. �� .:."�>.. .,°:5 �:.;'5 „5^",;35 300;ti'i70
CRP 2021 PE 3/1/2020 RATA 5 5 10 10 60
North Shore Road-Great Bend Culvert Replacement RW 1/2/2022 20
08 22 Rd.No.: 70390 0.10 CN 7/1/2024 RATA 500
From: MP 16.6 To: MP 16.7
Replace existing culvert with a new structure
T6taP2b21 Pro ecECos '1,0;0001TOTALS' 6 ''' .10 '10, °60 '"'20 500.
CRP 2020 PE 3/1/2020 RATA 8.5 1.5 10 10 50 50 10
Old Belfair Hwy RW 5/1/2023 100
08 23 Rd.No.: 98250 0.40 CN 4/1/2024 RATA W1200From: MP 1.2 To: MP 1.6
3R Improvement-Resurfacing,Restoration and Rehabilitation
Total 2021 Project Cost $10,000 TOTALS' -;,'8.5 " ""IS ".10 90 50
Trails Road Alternate Route-Rasor Road PE
Rd.No.62310 RW 9/3/2020 150 150 150 40
24 __ CN
From: MP. To: MP.
ROW acquisition
Total 2020 Project Cost $150,000 TOTALS- A50", ",1.60; 150'. '40
WSDOT/County Intersection Feasability Study PE 40 40
Johns Prairie/SR3:Clifton Old Belfair Hwy/SR300 RW 10
07 25 Rd.No.: 0.10 CN 300
From: MP To: MP
Feasability Study
Total 2020 Project Cost $40,000 TOT7lLS a" T 40',,,:�" ="350
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP-Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and State
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 4 of 6
Six Year Transportation Improvement Program
Agency: Mason County From 2021 to 2026
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/3/2020 Adoption Date:
City No. -- MPO/RTPO:Peninsula Amend Date: Resolution No.:
'Pro`legt Identification Pro ecf Costs in Thdusands of'Dollars - Federally'Fundep".
A: Federal Aid No: B.Bridge No. o" °' Fund Source Information •Expenditure Schedule Project-bn(
o 'w' C. Project Title -' "'' d 6 0 "Federal Fundin .- �RIW
'c L)'� D. Street/Road Name of Number J o.m, Phase Federal State 4th Re wired
qzE. Beginning.MPorroad-Ending MPor road o a`4- Start Fund [,Federal
ost by Fund State Local Total 1st -2nd 3rd thru Envir Type .Date
F. Describe Work to be Done ~ (mm/dd/y Source Funds Funds Funds 6th . ..mm7
1 3 6 8 9 10 1 11 1 12 13 14 15 16 17 181 19 20 21
PE RAP 36.9 4.1 41 41
Shelton Valley Culvert RW 9 1 10 10
26 Rd.No.: 05930 0.12 CN 455.4 50.6 506 506 506
From: MP 1.94 To: 2.06
Replace existing culvert with new structure(winter creek)
Total2020 Project Cost $557.000 TOTALS `*; _ "° ,:501.3 55>7 -557. 606 "' r 4l 516
Allyn Access,Circulation Easement Acquisition PE 1/2/2021 100 350
Wheelwright,Wade,and Masterson ROW RW 6/1/2022 125
27 Rd.No.:TBD _ CN 6/1/2023 3000
From: MP To: MP
ROW acquisition
total 2Q_0 Pr ct Cosi mm' TOTALS i100,'475 5000
PE 1/1/2025 400
Trails Road Realignment RW 10/1/2025 50
07 28 Rd.No.:62310 040 QN 4/1/2026
From: MP 0.5 To: MP 1.6
Curve Realignment
To612020 Proect Cost° ;'45b
PE 6/1/2023 210
Log Yard Road W Freight Upgrade RW 7/1/2024 50
29 CN 4/1/2025 1325
3R Improvement-Resurfacing,Restoration and Rehabilitation
TOTALS " '`"" ,1585
Mason Benson Intersection Safety PE 6/112021 40
RW 10
30 Rd.No.63010 0.10 CN 300
From:MP 2.5 To:MP 2.6
Improve sight distance
TolaE10Dri''io'ectG`osf '' { TOTALS, ' °350
Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program
PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and State
RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program Emergency Management funds
CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board
Page 5 of 6
Six Year Transportation Improvement Program
Agency: Mason County From 2021 to 2026
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/3/2020 Adoption Date:
City No. -- MPO/RTPO:Peninsula - Amend Date: Resolution No.:
Project Identification--`"" " "-' "' "" "`---` - �` �"' -�"' "Pro'ecfCo"sts in'Thousands of:'Dollars -' '-"" �" ""' ""'FeiJerally`Fund'ed�°"
m A. Federal Aid No.. B. Bridge No: 'rn Fund Source Information Expenditure Schedule Pro'ects Only
o N c a C..Project Title d i, m FederaLFundin R/W
Street(Road Nameof Number—� .'0 1° Phase Fetleraf Federal State 4th Required.
ti z E. Beginning MP or road-Ending MP or road ii a`a Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Enwr Type Date
F. Describe Work tobe`Done ~ mm/dd/- Code Phase':.Source 'funds Funds Funds, I_. 6th (mml ,
1 3 6 8 9 10 11 12 13 14 1 16 16 17 18 19 20 21
PE 6/1/2021 120
Frieght Corridor Trail RW
31 CN
3R Improvement-Resurfacing,Restoration and Rehabilitation
1'o' "I2d20-P,io'ect Cost'' -"' °' '-? TOTALS K" r 120
TOTALS 4.00 4770.15 1405.2 2292.6 8467.971 2676 3671 3936 13781
Future ConsiderationsWishlist
Completion of Trails road Alternate Route-Rasor Road in phases Log Yard Port of Bremerton Industrial Loop Connectivity Planning
Cloquallum Road MP 4.6 to 5.2 curve realignments Gravel Road Conversions
Cloquallum Road MP 6.6 to 7.2 widening Kelley Hall Road
Shelton Matlock Road MP 16.36 to 16.5 realign pave shoulders Sunny Side Road
Johns Prairie Road add paved shoulders RR tracks to old capital hill rd Eels Hill Road
Guardrail upgrades-Brockdale,McReavy,and Johns Prairie Callifomia Road
Terrace Blvd Road and Hwy 101 intersection-partner project with WSDOT Webb Road
Brockdale and Island Lake Road intersection-partner project with City of Shelton
Illumination intersections county wide
Union Boat Launch Resurfacing
Trail near Roessel Road
New Roads Consideration
McEwan Prairie to Brockdale 101 connection
Johns Prairie and Hwy 3 connection
Connection between Cloquallum and City Center exit
Phase Funding BRAC-Bridge Replacement Advisory Committee FBRB-Brian Abbot Fish Barrier Removal
PE-Preliminary Engineering STP-Surface Transportation Program (Now Local Bridge Program) BoardFLAP- Federal Lands Access Program
RW-Right of Way HSIP-Highway Safety Improvement Program TP-Transportation Partnerships EM-Federal Emergency Management Act and State
CN-Construction RATA-Rural Arterial Trust Account TAP-Transportation Alternatives Program Emergency Management funds
Page 6 of 6