Loading...
HomeMy WebLinkAboutBLD2019-00692 Final SFR - BLD Permit / Conditions - 9/18/2019 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 - 360-427-9670 ext 352 www.co.mason.wa.us B DD2019-00692 NEW SINGLE FAMILY RESIDENCE PROJECT DESCRIPTION: NEW SFR ISSUED: 09/18/2019 SITE ADDRESS: 600 NE HAVEN LAKE DR TAHUYA EXPIRES: 03/16/2020 PARCEL: 223305000327 APPLICANT: ROBERT S&KATHLEEN J MANNING OWNER: ROBERT S&KATHLEEN J MANNING 511 HAVEN LAKE DR 511 HAVEN LAKE DR TAHUYA,WA 98588 TAHUYA,WA 98588 1.253.326.9784 GENERAL CONTRACTOR'S LICENSE: COVAL HOMES License: COVALHL894QD 2023 125TH ST EAST Expires: 11/04/2019 TACOMA,WA 98445 VALUATIONS: FEES: Paid Due R-3 VB Residential, one- 1576.00 $190,302.00 State Fee-Residential $6.50 $0.00 and two-family Planning Review Fee $240.00 $0.00 U VB Utility, miscellaneous 528.00 $25,238.40 Building Plan Review/Change of $110.00 $0.00 Use-Onsite Sewage Building Permit Fee $1,801.52 $0.00 Plumbing Fees $131.00 $0.00 Plan Check Fee $1,170.99 $0.00 Mechanical Base Fee $30.00 $0.00 Mechanical Fees $102.00 $0.00 Plumbing Base Fee $25.00 $0.00 Total: $215,540.40 Totals : $3,617.01 $0.00 FIXTURES City Mechanical Fixtures Qt_y Plumbing Fixtures 1.0000 Dryer Vent(s) 1.0000 Number of Clothes Washers 1.0000 Kitchen Exhaust Hood(s) 1.0000 Number of Dishwashers 1.0000 Furnace(s) 1.0000 Number of Kitchen Sinks 1.0000 Heat Pump(s) 1.0000 Number of Water Heaters and or Vent Printed by:Genie Mcfarland on:09/18/2019 09:47 AM Page 1 of 8 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2019-00692 Qt C Mechanical Fixtures S -[ Plumbing Fixtures 4.0000 Spot Vent Fan(s) 2.0000 Number of Hose Bibs 2.0000 Number of Bath Tubs 2.0000 Number of Showers 2.0000 Number of Toilets 3.0000 Bathroom Sink REQUIRED INSPECTIONS Setback Inspection Framing Inspection Footing Inspection Rough- Plumbing Inspection Foundation Wall-Pre-Pour Inspection Mechanical Inspection Underfloor Inspection Insulation Inspection Shearwall Inspection BLD-Final Inspection CONDITIONS Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC Section R315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling. EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations(including addition or alteration of fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. Printed by:Genie Mcfarland on:09/18/2019 09:47 AM Page 2 of 8 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 - 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2019-00692 The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. " All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * The foundation/footing must be placed on undisturbed,firm-native soil. * A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space where the furnace is located, a utility room, or an approved location inside the building. When located on the elctrical panel, the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient(SHGC) of fenestration.Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment, duct leakage rates including test conditions as specified in WSEC Section R401.3 & R402.4.1.2, and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air changes per hour when tested with a blower door in accordanve with IECC/.WSEC Section R402.4.1.2. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 500 square feet. Reference IECC/WSEC R402.4.1.2. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate" and are available in '/4 or'/z sheets. The Mason County Permit Center will also have some available. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext.450 or 100 W Public Works Dr. Shelton.The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. Printed by:Genie Mcfarland on:09/18/2019 09:47 AM Page 3 of 8 r , Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2 1 0 9-00692 * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Genie Mcfarland on:09/18/2019 09:47 AM Page 4 of 8 Mason County i Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 \ - 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2O19-00692 ' Installation of heating equipment in a single-family residence shall meet the requirements of the current IECC/WSEC R403, applicable sections of the IRC, and IMC. Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4, all ducts, air handlers,filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure- sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches (38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT,permitted as a sealant on any ducts.When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in accordance to IECC/WSEC Section R403.3.3 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results (Existing Construction)." Duct tightness testing is not required if the air handler and all ducts are located within the heated space. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All property lines shall be clearly identified at the time of foundation inspection. * WIND LOADS-Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * A minimum of 75 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance with IECC/WSEC Section R404.1. Printed by:Genie Mcfarland on:09/18/2019 09:47 AM Page 5 of 8 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 - 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2019-00692 A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. Printed by:Genie Mcfarland on.09/18/2019 09:47 AM Page 6 of 8 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 � Shelton, WA 98584 \ _ 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2019-00692 * Adopted IECC/Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C,Window(Max U- Factor):0.30, Skylight(Max U-Factor):0.50, Doors(Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10. 2a-AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2a: Compliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes per hour maximum and All whole house ventilation requirements as determined by Section M1507.3 of the International Residential Code shall be met with a high efficiency fan (maximum 0.35 watts/cfm), not interlocked with the furnace fan.Ventilation systems using a furnace including an ECM motor are allowed, provided that they are controlled to operate at low speed in ventilation only mode. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the maximum tested building air leakage and shall show the qualifying ventilation system. 3b- HIGH EFFICIENCY HVAC EQUIPMENT 3b: Air-source heat pump with minimum HSPF of 9.0 5a- EFFICIENT WATER HEATING 5a: All showerhead and kitchen sink faucets installed in the house shall be rated at 1.75 GPM or less.All other lavatory faucets shall be rated at 1.0 GPM or less. 5c- EFFICIENT WATER HEATING 5c: Water heating system shall include one of the following: Gas, propane or oil water heater with a minimum EF of 0.91 or Solar water heating supplementing a minimum standard water heater. Solar water heating will provide a rated minimum savings of 85 therms or 2000 kWh based on the Solar Rating and Certification Corporation (SRCC)Annual Performance of OG-300 Certified Solar Water Heating Systems or Electric heat pump water heater with a minimum EF of 2.0 and meeting the standards of NEEA's Northern Climate Specifications for Heat Pump Water Heaters * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. * Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. RR5 * Height of structure not to exceed 35 feet from average grade. * Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). Printed by:Genie Mcfarland on:09/18/2019 09:47 AM Page 7 of 8 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2019-00692 A separate inspection in addition to the inspections required in the IBC, Section 110 shall be required in accordance with the 2015 IBC, Section 1705.12.2 and Section 1707.1. The additional inspection is required when shear wall fastener spacing is required to be 4 inches or less. The shear wall schedule shown on sheet S1.0 designate wall(s)type W2 with fastener spacing 4 inches or less. The required inspection may be performed by the Mason County Building Department, a WABO certified inspector, certified to inspect lateral connections, the Engineer of record (EOR), or an authorized representative of the (EOR). The special inspectors duties and responsibilities shall be as specified in Chapter 17. When a third party inspector is used to perform the inspection, special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton, WA 98584 and also available on site for review by the Building Official. Inspection reports shall be completed and submitted to the Mason County Building Department in a timely manner and shall be submitted prior to the framing inspection of said project. n On-site Septic System final installation approval required prior to temporary/final occupancy of the residence. * Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/Reserve requires a 1 Oft setback from all footing/foundations. B. Septic tank(s) requires 5ft setback from all footing/foundations. C. No foundation drains within 30ft, down gradient of drainfield/reserve area. X I herebycertify that I have read and examined this application and know the same to be true and correct. fY pp All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: L Contractor or Author4eAgen • Date: Printed by:Genie Mcfarland on:09/18/2019 09:47 AM Page 8 of 8 dY MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 BELFAIR:360-275-4467,EXT 352 Building,Plunning,Environment*I Hcvlth,Cwumunily He Ith ELMA:360-482-5269,EXT 352 www.co.masonma.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit httpJ/www.co.mason.wa.us/community-services/bid-inspecOon.php Permit Number BLD2019-00692 Date Issued 09/18/2019 Issued By Project NEW SFR Site Address 600 NE HAVEN LAKE DR Applicant ROBERT S&KATHLEEN J MANNING Contractor COVAL HOMES Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW SINGLE FAMILY RESIDENCE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Peritnete ( Z p/ f Point load Footing Footing Interior Footing Decks/Porches"1 Foundation Stem Walls %p/ Other I I _ Rough-In Groundwork Plumbing I Framingr Groundwork Mechanical Plumbing 5e•e-A Ji Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Na"Ing Underfloor f -13-fe? '71-.- Other Insulation Slab Ceiling Floor -Uy22, Vaulted Ceiling Walls a-o ao Vapor Barrier 1-21 A./ Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building - _ Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other Request to Revise Approved Plans Permit Number: LD COM �-���Z1�iame e� M� Parcel Number ` 0 - - G6 2-W' Phone Number daytim 2 Project Address NE ti� 4�5Iailing Address��7L /U E-* Please provide a complete, detailed description of the proposed revisions to the approved plans: C{ - G_ , e- I S E-j� //L,) �/ • Are two sets of the revised plans or addendum indicating the changes included? [ 'Yes ❑ No • Are the approved construction plans included? ❑ Yes ❑ No The RED stamped "site" approved construction plans must be included. • Are the revisions clearly and accurately identified on the plans or addendum? ❑ Yes ❑ No • Does the plan contain an engineer's or architects lateral or vertical analysis? ❑ Yes ❑ No If Yes, Has the engineer or architect approved this revision? ❑ Yes ❑No Is a stamped and signed approval included with this request? ❑ Yes ❑ No No structural changes to a "designed" plan will be approved without the written consent of the engineer and/or architect of record.) • Does the proposed revision modify the footprint or location of the structure? ❑ Yes ❑ No If Yes, Is a revised site plan, with all new setback dimensions included with this request? ❑ Yes ❑No Additional Information: Applicant's signa `l!e' ' Date: Received by: Date: OFFICIAL USE ONLY Initials Department Date of Date Reviewers $ for Review Received Assigned Approved Approval Original nation: 215 5l f�1, Reviewer Additional V tion: $ Sq.Ft. x$ Building �"��'2oZc� /� Sq.Ft. G x$ Planning Total New aluatj $ 2i ,�-J ZQ- � Public Health Additional Fees: Additional Planning ept. Fire Marshal Additional Plan R 'ew Public Additional Buil g Permit $ \ , Works Additional P bing $ Additiona echanical $ Additional Conditions/Comments: Additional E.H.Dept. $ Other $ Total Amount Due: $ -`'1� eo 0v N TO 9or o zb5 30 w 0,0 BA P10 Plc , ! Pctri�l�22�3 -'SD-. 03Z� RECEIVED 1700NE-HAV64 Loh,Or -P�xx0_ o bo"AeA UN 21 2019 _2oAa�T 64uv%!.L t,>- Zx 52 7.5 615 W. Alder Street n.5 � �� © (z ZF prJwag QF- � � p NNING -r�n� � oq,oc,f �•s n,s a l b inJ��e52rV2.i n �j� L �- "-re �x. f 0 C4 MT ,cp 4t I ti � 7"s cm cn 1 oaiyt, `co \�b �� - roR s � Mott,' ro-ofs � c+-t�n FT ;'7 Ol Audio-visual Alarm LJ1. Clean.out 0 Gal-Ion w _ 500 Glon Pre-Trash tank C 32g 1 O NuWater BNR- OO ATU Tank 1,5100'Gallon Pump Chamber PLANNING- 6 aloe Control Box p vi �bo r w � , '?'_ 'LC'SETBACKS ARE MEASURED 1 e0 r �rQ,n�; �1 d , FROM THE FURTHEST PROJECTION OF THE BUILDING �} Ffj APPROVED MASON COUNT`( DCD PLANNING SITE PLAN REQUIRED TO BE ON SITE N` 5100349 C N SUBJECT TO APPRO AL yZ FAULA JOY JOHNSON L(�1�tsCti'bF�i�tvi=�.. DateBy -2- MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES BUILDING DIVISION SHELTON (360) 427-9670 BELFAIR (360) 275-4467 Elma (360) 482-5269 FAx: (360)427-7798 WEB SITE: www.co.mason.wa.us 615 W ALDER STREET, SHELTON 98584 2015 International Energy Conservation Code, as amended by WAC 51-11 (IECC) Effective July 1, 2016. Ventilation code provisions are located in the 2015 International Residential Code (IRC), 2015 International Mechanical Code (IMC), & 2015 International Building Code A complete energy code application form will include information that clearly identifies compliance methods for heat sizing, thermal envelope, and whole-house ventilation. This form includes compliance instructions and information needed. Energy code compliance information, forms, worksheets, and educational information is also available on the Washington State University Extension Energy Program (WSU-EP) website. To access the website go to hftp://www.energy.wsu.edu/BuildingEfficiency/EnerqvCode.aspx . The website includes a heat system sizing calculator. Submit a completed heat sizing calculator worksheet when the building permit is submitted. In addition to the heat sizing calculator the website has helpful compliance information and worksheets for prescriptive and component performance options along with a glazing schedule. INSTRUCTIONS: Complete the Mason County Energy Code application and submit with a heat sizing calculator available on the WSU-EP website, see item #4 below: 1 Identify the compliance method. The most common and simplest approach is the prescriptive method for energy code compliance. See prescriptive table R402.1.1 located in the instructions. The Performance Alternative approach referenced in IECC Section R405 may also be used for energy code compliance. For more information contact Mason County Building Department staff at (360) 427-9670 ext. 352 or WSU Energy Program at (360) 956-2042. Compliance must be shown on your construction drawing in addition to this application. 2 Identify the whole-house ventilation compliance method. A ventilation system must be installed in accordance with The International Residential Code, Section M1507. The most common ventilation methods include a whole-house ventilation system using exhaust fans (M1507.3.4) and a whole-house ventilation system integrated with a forced-air system (M1507.3.5). Other ventilation systems include whole-house ventilation system using a supply fan (M1507.3.6) and whole-house ventilation system using a heat-recovery ventilation system (M1507.3.7). Ventilation openings are required in each habitable room in accordance with M1507.3.4.4. If you need additional information we recommend that you discuss with your heating and ventilation system professional. In addition Mason County staff will be happy to discuss the options if you are not sure which compliance option will work for you. 3 Identify the Additional Energy Efficiency Requirements listed in Table R406.2. The drawings included with the building permit application must show and identify which options have been selected and the point value of each option. Each one and two-family dwelling unit and townhouses are required to achieve the following minimum number of credits: a) Small dwelling units: less than 1500 sq. feet of heated or cooled floor area and less than 300 sq. ft fenestration area (skylights, doors, windows, etc). Additions to existing building that are greater than 500 sq. ft. of heated floor but less than 1500 sq ft of area. Requires 1.5 credits b) Medium dwelling units that are not included in (a) above {small dwelling), OR (c) below{large dwelling) Requires 3.5 credits EXCEPTION: Dwelling units serving R-2 occupancies shall require. Requires 2.5 credits. 1 (R-2,occupancy is Residential occupancies containing sleeping units or more than two dwelling units where the occupants are primarily pemnanent in nature, including: Apartment houses, Boarding houses (non-transient) with more than 16 occupants, Congregate living facilities (non-transient) with more than 16 occupants, Convents, Dormitories, Fraternities and' sororities, Hotels (non-transient), Live work units, Monasteries, Motels (non-transient), Vacation timeshare properties.) c) Large dwelling unit is a dwelling unit that exceeds 5,000 sq. ft. of heated or cooled floor area. Requires 4.5 credits. d) Additions less than 500 sq feet. Requires .5 credits 4 Must provide a completed heating/cooling system size worksheet to verify compliance to IECC R403.7. The calculator/worksheet is available on the WSU-Energy Program website at: http://www.energv.wsu.edu/Documents/Heat Sizing code%20specs final 2015.xis. Staff may be able to assist with preparation of the worksheet. 5 Must meet the prescriptive option for all fenestration products. Products shall comply with the required U- factor listed in Table R402.1.3. Windows, doors, and glazed doors shall have a tested U-factor or .30 or less. When using the small dwelling option for energy credits (a) or Performance Alternative approach you must provide a fenestration schedule that identifies the square feet and U-factor of each item. Fenestration is defined in the IECC as skylights, roof windows, vertical windows, opaque doors, glazed- doors that include products with glass and non-glass glazing materials. 6 Identify on the construction drawings the location and fuel type of the heating system, water heater, location of exhaust fans (bathroom, laundry, kitchen, etc.) and R-factor of proposed insulation for walls, floors, ceilings, and concrete slab floors on the building plans. 7 Not less than 75% of all permanently installed lamps in lighting fixtures shall be high efficacy lamps. High efficacy lamps are defined in IECC Chapter 2 and are considered compact fluorescent lamps, T-8 or smaller diameter linear fluorescent lamps, or lamps with a minimum efficacy 60 lumens per watt for lamps over 40 watts, 50 lumens per watt for lamps over 15 watts to 40 watts, and 40 lumens per watt for lamps 15 watts or less. If you need assistance please contact Mason County Community Development at (360) 427-9670 ext. 352 or WSEC compliance information and code text is also available on the WSU-Energy Program website at: http://www.enerqV.wsu.edu/BuildingEfficiency/EnerqvCode.aspx Prescriptive Requirements M for Mason County Climate Zone 4-C, Table R402.1.1 Fenestration Glazing U-factor Wall Area% Vaulted Wall Slab don Option of Floor Vertical Skylight Ceiling Ceiling Above int°"below grade Floor Grade (Includes doors, b Grade windows etc. R-10,2 ft R-21 1011521 int+ Heated slabs 4C Unlimited 30 .5D R-49 R-38 int ki TB R-30 require R10 full slab. n Log & solid timber wall with a min. avg. thickness of 3.5" are exempt from the above grade wall insulation requirements. All footnotes are available on WSU-Energy Program Website @ http://vw✓w.energv.wsu.edu/BuildingEfficiency/EnergyCode.aspx 2 Prescriptive Energy Code Compliance for All Climate Zones in Washington Project Information Contact Information MANNING RESIDENCE COVAL HOMES 600 NE Haven Lake Dr, Tahuya, WA 98588 2023 125TH ST E, TACOMA WA 98445 PLAN 1576 253-693-4446 This project will use the requirements of the Prescriptive Path below and incorporate the the minimum values listed. In addition, based on the size of the structure,the appropriate number of additional credits are checked as chosen by the permit applicant. Authorized Representative Date All Climate Zones R-Value' U-Factory Fenestration U-Factorb n/a 0.30 Skylight U-Factor n/a 0.50 Glazed Fenestration SHGCbe n/a n/a Ceiling" 49 0.026 Wood Frame Wall"' 21 int 0.056 Mass Wall R-Value' 21/21h 0.056 Floor 30' 0.029 Below Grade Wall`m 10/15/21 int+TB 0.042 Slab'R-Value& Depth 10, 2 ft n/a *Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2. Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 so as to achieve the following minimum number of credits: 1. Small Dwelling Unit: 1.5 credits ❑ Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are greater than 500 square feet of heated floor area but less than 1500 square feet. 0 2. Medium Dwelling Unit: 3.5 credits All dwelling units that are not included in#1 or#3. Exception: Dwelling units serving R-2 occupancies shall require 2.5 credits. ❑ 3. Large Dwelling Unit: 4.5 credits Dwelling units exceeding 5000 square feet of conditioned floor area. ❑ 4. Additions less than 500 square feet: .5 credits Table R406.2 Summary Option Description Credit(s) 1a Efficient Building Envelope 1a 0.5 ❑ 1b Efficient Building Envelope I 1.0 ❑ 1c Efficient Building Envelope 1c 2.0 ❑ 1d Efficient Building Envelope 1d 0.5 ❑ 2a Air Leakage Control and Efficient Ventilation 2a 0.5 2 0.5 2b Air Leakage Control and Efficient Ventilation 21b 1.0 ❑ 2c Air Leakage Control and Efficient Ventilation 2c 1.5 ❑ 3a High Efficiency HVAC 3a 1.0 ❑ 3b High Efficiency HVAC 31b 1.0 21 1.0 3c High Efficiency HVAC 3c 1.5 ❑ 3d High Efficiency HVAC 3d 1.0 ❑ 4 High Efficiency HVAC Distribution System 1.0 5a Efficient Water Heating 5a 0.5 0 0.5 5b Efficient Water Heating 5b 1.0 ❑ 5c Efficient Water Heating 5c 1.5 2 1.5 5d Efficient Water Heating 5d 0.5 ❑ 6 1 Renewable Electric Energy 0.5 *1200 kwh 0.0 Total Credits 3.50 *Please refer to Table R406.2 for complete option descriptions Table R402.1.1 Footnotes For SI: 1 foot.=304.8 mm, ci .=continuous insulation, int.= intermediate framing. a R-values are minimums. U-factors and SHGC are maximums.When insulation is installed in a cavity which is less than the label or design thickness of the insulation,the compressed R-value of the insulation from Appendix Table A101.4 shall not be less than the R-value specified in the table. b The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed fenestration. "10/15/21.+TB" means R-10 continuous insulation on the exterior of the wall, or R-15 on the continuous insulation on the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the basement wall at the interior of the basement wall. "10/15/21.+TB"shall be permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity insulation at the interior of the basement wall. "TB" means thermal break between floor slab and basement wall. d R-10 continuous insulation is required under heated slab on grade floors. See R402.2.9.1. e There are no SHGC requirements in the Marine Zone. f Reserved. g Reserved. h Reserved. The second R-value applies when more than half the insulation is on the interior of the mass wall. Reserved. k For single rafter-or joist-vaulted ceilings,the insulation may be reduced to R-38. Reserved. m Int. (intermediate framing)denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. Table R402.1.3 Footnote a Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as specified in Section R402.1.3. I Window, Skylight and Door Schedule Project Information Contact Information MANNING RESIDENCE COVAL HOMES 600 NE Haven Lake Dr, Tahu a, WA 98588 2023 125TH ST E. TACOMA WA 98445 PLAN 1576 253-693-4446 Width Height Ref. U-factor Qt. Feet " h Feet " ' Area UA Exempt Swinging Door (24 sq. ft. max.) 0.0 0.00 Exempt Glazed Fenestration (15 sq. ft. max.) 0.0 0.00 Vertical Fenestration (Windows and doors) Component Width Height Description Ref. U-factor Qt. Feet Inch Feet Inch Area UA ENTRY DOOR 0.30 1 3 6 ft 20.0 6.00 FOYER 0.30 1 1 s 5 7.5 2.25 DINING 0.30 1 6 5 30.0 9.00 BEDROOM 3 0.30 1 6 5 30.0 9.00 BEDROOM 2 0.30 1 6 5 30.0 9.00 KITCHEN 10.30 1 14 1 3 1 1 12.01 3.60 GREAT ROOM DOOR 0.30 1 6 6 10 41.0 12.30 GREAT ROOM 0.30 1 5 5 25.0 7.50 MASTER BEDROOM 0.30 1 6 5 30.0 9.00 MASTER BATH 0.30 1 4 4 16.0 4.80 GARAGE/DWELLING DOOR 0.30 1 2 '3 6 9 1 17.81 5.33 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.01 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.01 0.00 0.01 0.00 0.01 0.00 Sum of Vertical Fenestration Area and UA 1 259.31 77.78 Vertical Fenestration Area Weighted U= UA/Area 0.30 Overhead Glazing (Skylights) Component Width Height Description Ref. U-factor Qt. Feet n°h Feet Inch Area UA 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.01 0.00 0.01 0.00 Sum of Overhead Glazing Area and UA o.01 0.00 Overhead Glazing Area Weighted U = UA/Area 1 0.00 Total Sum of Fenestration Area and UA (for heating system sizing calculations) 1 259.3 77.78 Simple Heating System Size: Washington State This heating system sizing calculator is based on the Prescriptive Requirements of the 2015 Washington State Energy Code(WSEC)and ACCA Manuals J and S.This calculator will calculate heating loads only.ACCA procedures for sizing cooling systems should be used to determine cooling loads. Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section,some values will be calculated for you.If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension Program at(360) 956-2042 for assistance. "d 21 q • 1Av.Xvq A Project Information Contact Information _ MANNING RESIDENCE COVAL HOMES 600 NE Haven Lake Or,Tahuya,WA 98588 12023 125TH ST E,TACOMA WA 9844S PLAN 1576 253-693-4446 RLE E I V E D Heatinq System Type: o All Other systems •Heat Pump To see detailed instructions for each section,place your cursor on the word'Instructions". U N 2U�JQQ Design Temperature 1i " "" Design Temperature Difference(AT) 47 'Shelton 1�' = AT=Indoor(70 degrees)-Outdoor Design Temp 615 W. Alder Street Area of Building Conditioned Floor Area LD I N G Instructions Conditioned Floor Area(sq ft) 1,576 ��' Average Ceiling Height Conditioned Volume Instructions Average Ceiling Height(ft) t3.3 13,081 Glazing and Doors U-Factor X Area = UA Instructions u-030 0.300 259 77.70 Skyliahts U-Factor X Area = UA Instructions 0.50 - Insulation Attic U-Factor X Area = UA Instructions illlw11111111 rwl 0.026 1,576 40.98 Single Rafter or Joist Vaulted Ceilings _ U-Factor X Area UA �SekctR Value r(Iil No selection II�lA�� Above Grade Walls Isee Figure 11 U-Factor X Area UA '. R-21Intermediate s'I 0.056 1,292 72.35 1 I� �.NIIIAAA��f Floors U-Factor X Area UA R 30 0.029 1,576 45.70 Below Grade Walls(see Figure 1) U-Factor X Area UA Select value - , No selection 0 Slab Below Grade(sea Figure 1)� F-Factor X Length UA Instructions - -- - No selection Select conditioning #' Slab on Grade(see Figure; F-Factor X Length UA Instructions - — - No selection 0 i Select R Valueimo— Location of Ducts _ Duct Leakage Coefficient Unconditioned Space ' = 1.10 Sum of UA 236.73 Envelope Heat Load 11,126 Btu/Hour Figure 1. sumo/uAXAT Air Leakage Heat Load 6,640 Btu/Hour VolumeX 06XATX.018 Above Grade Building Design Heat Load 17,766 Btu I Hour �11-1-111— Air Leakage•Envelope Heat Loss Building and Duct Heat Load 19,543 Btu/Hour Duds in unconditioned space:Sum of Building Beat Loss X 1.10 Duds in conditioned space:Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 24,429 Btu I Hour Building and Duct Heat Loss X 1.40 for Forced Air Furnace Building and Duct Heat Loss X 1.25 for Heat Pump 07/01 13 I (2015 WSEC - Table 406.2) OPTION DESCRIPTION CREDIT(S) la EFFICIENT BUILDING ENVELOPE la: 0.5 Prescriptive compliance is based on Table R402.1.1 with the following modifications: Vertical fenestration U =0.28 Floor R-38 Slab on grade R-10 perimeter and under entire slab Below grade slab R-10 perimeter and under entire slab or Compliance based on Section R402.1.4: Reduce the Total UA by 5%. lb EFFICIENT BUILDING ENVELOPE lb: 1.0 Prescriptive compliance is based on Table R402.1.1 with the following modifications: Vertical fenestration U =0.25 Wall R-21 plus R-4 Floor R-38 Basement wall R-21 int plus R-5 ci Slab on grade R-10 perimeter and under entire slab Below grade slab R-10 perimeter and under entire slab or Compliance based on Section R402.1.4: Reduce the Total UA by 15%. lc EFFICIENT BUILDING ENVELOPE lc: 2.0 Prescriptive compliance is based on Table R402.1.1 with the following modifications: Vertical fenestration U =0.22 Ceiling and single-rafter or joist-vaulted R-49 advanced Wood frame wall R-21 int plus R-12 ci Floor R-38 Basement wall R-21 int plus R-12 ci Slab on grade R-10 perimeter and under entire slab Below grade slab R-10 perimeter and under entire slab or Compliance based on Section R402.1.4: Reduce the Total UA by 30%. ld8 EFFICIENT BUILDING ENVELOPE Id: 0.5 Prescriptive compliance is based on Table R402.1.1 with the following modifications: Vertical fenestration U=0.24 2a AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2a: 0.5 Compliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes per hour maximum and All whole house ventilation requirements as determined by Section M1507.3 of the International Residential Code shall be met with a high efficiency fan(maximum 0.35 watts/cfm),not interlocked with the furnace fan.Ventilation systems using a furnace including an ECM motor are allowed,provided that they are controlled to operate at low speed in ventilation only mode. To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the maximum tested building air leakage and shall show the qualifying ventilation system 2b AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2b: 1.0 Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 2.0 air changes per hour maximum and All whole house ventilation requirements as determined by Section M1507.3 of the International Residential Code shall be met with a heat recovery ventilation system with minimum sensible heat recovery efficiency of 0.70. To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the maximum tested building air leakage and shall show the heat recovery ventilation system 5 J OPTION DESCRIPTION CREDIT(S) 2c AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2c: 1.5 Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 1.5 air changes per hour maximum and All whole house ventilation requirements as determined by Section M1507.3 of the International Residential Code shall be met with a heat recovery ventilation system with minimum sensible heat recovery efficiency of 0.85. To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the maximum tested building air leakage and shall show the heat recovery ventilation system 3a HIGH EFFICIENCY HVAC EQUIPMENT 3a: 1.0 Gas,propane or oil-fired furnace with minimum AFUE of 941/c or Gas,propane or oiled-fired boiler with minimum AFUE of 92% To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 3b HIGH EFFICIENCY HVAC EQUIPMENT 3b: 1.0 Air-source heat pump with minimum HSPF of 9.0 To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 3c b HIGH EFFICIENCY HVAC EQUIPMENT 3c: 1.5 Closed-loop ground source heat pump;with a minimum COP of 3.3 or Open loop water source heat pump with a maximum pumping hydraulic head of 150 feet and minimum COP of 3.6 To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 3d HIGH EFFICIENCY HVAC EQUIPMENT 3d: 1.0 Ductless Split System Heat Pumps,Zonal Control:In homes where the primary space heating system is zonal electric heating,a ductless heat pump system shall be installed and provide heating to the largest zone of the housing unit To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 4 HIGH EFFICIENCY HVAC DISTRIBUTION SYSTEM: 1.0 All heating and cooling system components installed inside the conditioned space. This includes all equipment and distribution system components such as forced air ducts,hydronic piping,hydronic floor heating loop,convectors and radiators.All combustion equipment shall be direct vent or sealed combustion. For forced air ducts:A maximum of 10 linear feet of return ducts and 5 linear feet of supply ducts may be located outside the conditioned space.All metallic ducts located outside the conditioned space must have both transverse and longitudinal joints sealed with mastic.If flex ducts are used,they cannot contain splices.Flex duct connections must be made with nylon straps and installed using a plastic strapping tensioning tool. Ducts located outside the conditioned space must be insulated to a minimum of R-8. Locating system components in conditioned crawl spaces is not permitted under this option. Electric resistance heat and ductless heat pumps are not permitted under this option. Direct combustion heating equipment with AFUE less than 80%is not permitted under this option. To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the heating equipment type and shall show the location of the heating and cooling equipment and all the ductwork. 6 OPTION DESCRIPTION CREDIT(S) 5a EFFICIENT WATER HEATING 5a: 0.5 All showerhead and kitchen sink faucets installed in the house shall be rated at 1.75 GPM or less.All other lavatory faucets shall be rated at 1.0 GPM or less.` ' To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the maximum flow rates for all showerheads,kitchen sink faucets,and other lavatory faucets. 5b EFFICIENT WATER HEATING 5b: 1.0 Water heating system shall include one of the following: Gas,propane or oil water heater with a minimum EF of 0.74 or Water heater heated by ground source heat pump meeting the requirements of Option 3c. or For R-2 occupancy,a central heat pump water heater with an EF greater than 2.0 that would supply DHW to all the units through a central water loop insulated with R-8 minimum pipe insulation. To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency. 5c EFFICIENT WATER HEATING 5c: 1.5 Water heating system shall include one of the following: Gas,propane or oil water heater with a minimum EF of 0.91 or Solar water heating supplementing a minimum standard water heater. Solar water heating will provide a rated minimum savings of 85 therms or 2000 kWh based on the Solar Rating and Certification Corporation(SRCC)Annual Performance of OG-300 Certified Solar Water Heating Systems or Electric heat pump water heater with a minimum EF o�and meeting the standards of NEEA's Northern Climate Specifications for Heat Pump Water Heaters To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency and,for solar water heating systems,the calculation of the minimum energy savings. 5d EFFICIENT WATER HEATING 5d: 0.5 A drain water heat recovery unit(s)shall be installed,which captures waste water heat from all the showers,and has a minimum efficiency of 40%if installed for equal flow or a minimum efficiency of 52%if installed for unequal flow.Such units shall be rated in accordance CSA B55.1 and be so labeled. To qualify to claim this credit,the building permit drawings shall include a plumbing diagram that specified the drain water heat recovery units and the plumbing layout needed to install it and labels or other documentation shall be provided that demonstrates that the unit complies with the standard- 6 RENEWABLE ELECTRIC ENERGY: 0.5 For each 1200 kWh of electrical generation per each housing unit provided annually by on-site wind or solar equipment a 0.5 credit shall be allowed,up to 3 credits. Generation shall be calculated as follows: For solar electric systems,the design shall be demonstrated to meet this requirement using the National Renewable Energy Laboratory calculator PVWATTs. Documentation noting solar access shall be included on the plans. For wind generation projects designs shall document annual power generation based on the following factors:The wind turbine power curve;average annual wind speed at the site;frequency distribution of the wind speed at the site and height of the tower. To qualify to claim this credit,the building permit drawings shall specify the option being selected and shall show the photovoltaic or wind turbine equipment type, Provide documentation of solar and wind access,and include a calculation of the minimum annual energy power production. a.Projects using this option may not use Option la,lb or lc b.Projects may only include credit from one space heating option,3a,3b,3c or 3d.When a housing unit has two pieces of equipment(i.e.,two furnaces)both must meet the standard to receive the credit. c.Plumbing Fixtures Flow Ratings.Low flow plumbing fixtures(water closets and urinals)and fittings(faucets and showerbeads)shall comply with the following requirements: 1.Residential bathroom lavatory sink faucets:Maximum flow rate-3.8 L/min(1.0 gal/min)when tested in accordance with ASME A112.18.1/CSA B125.1. 2.Residential kitchen faucets:Maximum flow rate-6.6 L/min(1.75 gal/min)when tested in accordance with ASME A112.18.VCSA B125.1. 3.Residential showerbeads:Maximum flow rate-6.6 L/min(1.75 gal/min)when tested in accordance with ASME A112.18.VCSA B125.1 7 MASON COUNTY COMMUNITY SERVICES "60,z q - 00(9C(ok PERMIT ASSISTANCE CENTER: I erinit No: .BUILDING•PLANNING•PUBLIC HEALTH•FIRE MARSJ�C(� 615 W.Alder Street,Shelton,WA 98584 (�L�lJ Phone Shelton:(360)427-9670 ext. 352•Fax:(360)427-7798 Pho V /2 7 Belfair.-(360)275-4467•Phone Elma:(360)482-5269 JON 21 2019 Za 1854 JUN 11 2019 BUILDING PERMIT 0§ 1 treet t PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: R p 4 4: t e�l4^ �iV1 t NAM,,f-KvA,, 14twes MAILING ADDRESS: 51( IJ MAILI G A DRESS: D CITY: )y k STATE:W_ZIP: q CITY STATE: W n ZIP: PHONE#1: -7 Sq zSg -l 01 PHONE: CELL: PHONE#2: -7 A14 EMAIL EMAIL: K04vim Inn B4 , • ' L&I REG EXP. ( /J / PRIMARY CONTACT: OWNER CONTRACTOR❑ OTHER[] f r NAME ( EMAIL M& h O 1 I MAILING ADDRESS CITY STAT ZIP PHONE CELL PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number) y 5-003 21 ZONING LEGAL DESCRIPTION(Abbreviated) FIRE DISTRICT SITE ADDRESS I DU DIRECTIONS TO SITEADDRESSBeI S D -f VVV\ Q ayy4V^ 06 • 19 1-0 (006 IN 6 ice! j IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES[] NO C IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply): Wilt hirr SALTWATER❑ LAKE ❑ RIVER/CREEK ❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM ❑ TYPE OF WORK: NEW ADDITION ❑ ALTERATION ❑ REPAIR❑ OTHER ❑ USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc) 51 (petsCG IS USE: PRIMARY N SEASONAL ❑ NUMBER OF BEDROOMS r NUMBER OF BATHROOMS HEATED STRUCTURE? YES(Whole Bldg) YES (Part[s]of Bldg)in NO ❑ DESCRIBE WORK 15 -1 5 SQUARE FOOTAGE: (propose+existing) 1 ST FLOOR152tL sq.ft. 2ND FLOOR 4 sq. ft. 3RD FLOOR NJ_sq.ft. BASEMENT_sq.ft. DECK sq. ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq. ft. GARAGE_sq.ft. Attached Detached❑ CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURE' E D HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN RE MAKE !n v //mi/l MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER ENVIRONMENTAL HEALTH: SEWAGE/SEWER SOURCE: SEPTIC SEWER❑ / NEW EXISTING ❑ PLUMBING IN STRUCTURE? YESY NO ❑ If yes, attach completed Water Adequacy Form PERIMETER/FOUNDATION DRAINS PROPOSED? YES ❑ NO❑ EXISTING SQ.FT. EXISTING BEDROOMS I W PROPOSED BEDROOMS TOTAL BEDROOMS OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permittapplication becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED. (MASON I COUNTY CODE 14.08.42) X lVie"(& (i d, LO 9 S' ature of OWNER(Must si ned bv the OWNER) Date DEPAR441ENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL PUBLIC HEALTH MASON COUNTY �ERYVED COMMUNITY SERVICESRE D Building,Planning,Environmental Health,CommuB�ffii ' 211�N 27 2019 � JUN 2019 Physical and Mailing Address:615WAIderSt,Bldg 8, Shelton, WA 98584 615 W. Alder Street Shelton Phone: (360)427-9670 ext352 ❖ Fax (360)427-7798 615 W_ Alder Rtrpet_ PLUMBING & MECHANICAL PERMIT APPLICATION Permit ZO Iq- UU(Pcl A OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: R vy Ma in A', NAME:C' MAILING ADDRESS: 511 E MAILING ADDRESS: CITY: JJA0qA STATE:,-.4 A_ZIP:1igS CITY: A, STATE: W& ZIP: 1st PHONE: Z53 Z S SIg I PHONE: CELL: Zv 2nd PHONE: -2-5 EMAIL: EMAIL: � L&I REG Co UCL h f UUT4 1) EXP. /1 PARCEL INF RMATIO : PARCEL NUMBER (12 Digit Number): �2;2.33y-So-oo 3arl Zoning: LEGAL DESCRIPTION (Abbreviated): SITE ADDRESS: LP00 O E I 5VbJ ILWel 9— : } \4 Ilk- DIRECTIONS TO SIT DDRESS: _ Tah 0-- ?_o&A L4.13 tAk 1 -r NC—V\) valy-) L TYPE OF JOB/WORK:- NEW ADD ALT REPAIR OTHER USE OF BUILDING Res't aA PLUMBING FIXTURES MECHANICAL UNITS [J Electric in-wall heaters(no fee) ype of Fixture No. of Fixtures Fuel Type Fees Type of Unit No. of Units Fuel Type Fees Toilet(s) Furnace F [E/G/LPG] Bathroom Sink(s) Heat Pump fie_ [E/G/LPG] Bath Tub(s) ' o Ductless H.P. [E/G/LPG] Showers) Spot Vent Fan Water Heater(s) G/LPG] Propane Tank e_gaL) Clothes Washer(s) E G/LPG] Gas Outlet(s) Kitchen Sink(s) Heat Stove [E/G/LPG/W] Dishwasher(s) l Kitchen Exhaust Hood Hose bib(s) Dryer Vent Other Solar Panel Other Other Plumbing Subtotal Mechanical Subtotal Plumbing Base Fee Mechanical Base Fee Final Inspection Fee Final Inspection Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor.I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days.PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X Q - 2_1 -261 'a Signature of Applicant Date X Owner/Owners Representative/Contractor Print Name (Circle one) DEPARTMENTAL REVIEW PROVED DATE DENIED DATE TAGSINOTESICONDITIONS O Building 1 _9 r O Fire Marshal O Permit Tech (OTC permit only) Visil L;�On-lint; I)ttp,,./Mjvti Nt.co.masoi,,.wa..:I5/coni!i1 LinityJ-dev/ Rev:3/09/2017