Loading...
HomeMy WebLinkAbout2020-43 - Res. Replacing Res. 105-19 Amending Six-Year Transportation Improvement Program RESOLUTION NO. 2�22o-y3 REPLACING RESOLUTION 105-19 AMENDED SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, in compliance with 136-15 WAC, Mason County has prepared the attachment Six-Year Transportation Improvement Program for the period January 1,2020 through December 31, 2025; and, WHEREAS,the Board of County Commissioners hereby certifies that the priority array of potential projects on this County's road system, including bridges, was prepared by the County Engineer during the preparation of the said Six-Year Transportation Improvement Program; and, WHEREAS,the Board of County Commissioners reviewed the current bridge condition report as prepared by the County Engineer on April 22, 2019; and, WHEREAS, Resolution 105-19, approved November 5, 2019 adopted the 2020 through 2025 Six-Year Transportation Improvement Program; and WHEREAS, unanticipated funding has resulted in a need to amend the Six-Year Transportation Improvement Program in order to comply with 136-15 WAC and maintain our Standard of Good Practice with the County Road Administration Board; and, WHEREAS,the Board of County Commissioners find that the proposed Amended Six-Year Transportation Improvement Program is consistent with the County Comprehensive plan; and, WHEREAS, in compliance therewith, the Board of County Commissioners has held a public hearing on amending the 2020 through 2025 Six-Year Transportation Improvement Program this 191h day of May,2020. NOW,THEREFORE,BE IT RESOLVED,by the Board of Mason County Commissioners, in regular session hereby,replaces 105-19 with the attached Amended Six-Year Transportation Improvement Program for 2020 through 2025 be adopted,which is hereby incorporated and made part of this Resolution. ADOPTED this day of 2020. BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON ATTEST: v HARON TRASK, Chair ME IS EWRY, rk of the Board RAN Y EATHE , Vice Chair APPROVED AS TO FORM: KEVIN 11,17 Y,Commissioner TIM WHITE ,Ch.DPA cc: Commissioners Public Works Community Development County Road Admin.Board WSDOT Six Year Transportation Improvement Program Agency: Mason County From 2020 to 2025 Co.No.: 13 Co.Name: Mason County Hearing Date: 11/5/2019 Adoption Date: 11/5/2019 City No. --- MPO/RTPO: Peninsula Amend Date: - Resolution No.: 105-19 Project Identification L Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. o Fund Source Information Expenditure Schedule Project Only y , C. Project Title a�i m Federal FundingR/W c �j a D. StreeURoad Name of Number J o t Phase Federal Federal State 4th Required Z `.§ EnvirT e LL E. Beginning MP or road-Ending MP or road o a rL Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru yp Date F. Describe Work to be Done ~ mmldd/ Code Phase Source Funds Funds Funds 6th mm/ 1 3 6 8 9 10 1 11 12 13 14 15 16 17 18 19 20 21 07 Various PE 1/1/2020 STP 50 10 60 60 60 60 180 08 Programmatic Preservation-HMA Overlays RW 09 Rd.No.: Various CN 6/1/2020 STP 1913 597 2510 2510 825 825 2475 N/A 17 1 From: MP Var To: MP Var 4.00 E 18 19 Total 2020 Project Cost $2,570,000 TOTALS 1963 607 2570 2570 885 885 2655 PE 7/20/2020 STPR 17 2.7 20 20 2020 Mason County Overlay RW CN 8/1/2021 STPR 677 105.7 783 783 07 2 Rd.No.:23910 From:MP 1.7 to 3.1 East Agate Road resurfacing project Total 2020 Project Cost $803,000 ITOTALS 694.77 108.4 803 20 783 07 PE 40 40 40 40 40 120 08 Programmatic Culvert Repair/Replacement RW 10 10 10 10 10 30 09 3 CN 150 150 150 150 150 450 17 18 19 Total 2020 Project Cost $200,000 TOTALS 200 200 200 200 200 600 07 PE 10 10 10 10 10 30 08 Programmatic Bridge Program RW 5 5 5 5 51 15 09 4 CN 50 50 50 50 50 150 17 18 19 Total 2020 Project Cost $65,000 ITOTALS 65 65 65 65 65 195 07 PE 10 10 10 10 10 30 08 County-Wide Small Capital Projects RW 5 5 5 5 5 15 09 5 CN 85 85 85 85 85 255 17 18 19 Total 2020 Project Cost $100,000 TOTALS 100 100 100 100 100 300 07 PE 15 15 15 10 10 30 08 County-Wide Gravel Road Upgrades RW 51 51 15 09 6 _ CN 501 501 150 17 18 19 Total 2020 Project Cost $15,000 TOTALS 15 15 151 65 65 195 Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board Six Year Transportation Improvement Program Agency: Mason County From 2020 to 2025 Co.No.: 13 Co.Name: Mason County Hearing Date: 11/5/2019 Adoption Date: 11/5/2019 City No. --- MPO/RTPO: Peninsula Amend Date: - Resolution No.: 105-19 Project Identification L Project Costs in Thousands of Dollars Federally Funded m A. Federal Aid No. B. Bridge No. m Fund Source Information Expenditure Schedule Project Only oE C. Project Title J Federal Fundin R/W c U D. Street/Road Name of Number .o t Phase Federal Federal State 4th Required ii o_ Z E. Beginning MP or road-Ending MP or road o a o_ Start Fund Cost by Fund State local Total 1st 2nd 3rd thru Envir Type Date F. Describe Work to be Done ~ mmlddl Code Phase Source Funds Funds Funds 6th mm/ 1 3 6 8 9 10 11 1 12 13 14 15 16 17 18 19 20 21 07 PE 10 10 10 10 10 30 08 Neighborhood Roadway Safety Grants RW 5 5 15 09 7 CN 50 50 150 17 18 19 Total 2020 Project Cost $10,000 TOTALS 10 10 10 65 65 195 CRP 2006 PE 1/1/2015 HSIP 4.5 0.5 5 5 Bear Creek Dewatto Road Clear Zone RW 8/1/2019 HSIP 15 15 15 07 8 Rd.No.: 79800 1 50 CN 4/1/2020 HSIP 222 318 540 540 DCE 2/19 From: MP 5.2 To: MP 6.7 Clear Zone Project Total 2020 Project Cost $560,000 TOTALS HSIP 226.5 333.5 560 560 CRP 2014 PE 7/1/2018 RCO 10 10 10 Deegan Road West Culvert Replacement RW 11/1/2018 10 10 10 09 9 Rd No.:06110 CN 7/1/2019 RCO 215 115 330 330 2/19 From MP 2.37 To:MP 2.37 Replace existing culvert with a new structure Total 2019 Project Cost $350,000 TOTALS 225 125 350 350 CRP 2015 PE 7/1/2018 RCO 5 5 5 Shelton Valley Road Culvert Replacement RW 11/1/2018 10 10 10 08 10 Rd No.:05930 CN 7/1/2019 RCO 200 250 450 450 2/19 From MP 2.13 To:MP 2.13 Replace existing culvert with a new structure Total 2020 Project Cost $465,000 TOTALS 205 260 465 P55 CRP 2022 PE 1/1/2020 RCO 47 8 55 5 Uncle Johns Upper Culvert RW 2/1/2021 10 09 11 Rd.No.: 23500 CN 7/1/2021 RCO 430 From: MP 0.64 To: MP 0.64 Replace existing culvert with a new structure Total 2020 Project Cost $55,000 TOTALS 47 8 55 445 CRP 2023 PE 9/1/2019 RCO 298 52 350 350 50 Uncle Johns Lower Culvert RW 1/1/2021 20 09 12 Rd No.:23500 CN 7/1/2023 2580 From MP 1.02 To:MP 1.02 Remove Existing Culvert and replace as needed Total 2020 Project Cost $350,000 ITOTALS 298 52 350 350 70 2580 Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board Page 2 of 6 Six Year Transportation Improvement Program Agency: Mason County From 2020 to 2025 Co.No.: 13 Co.Name: Mason County Hearing Date: 11/5/2019 Adoption Date: 11/5/2019 City No. --- MPO/RTPO: Peninsula Amend Date: - Resolution No.: 105-19 Project Identification L Project Costs in Thousands of Dollars Federally Funded m A. Federal Aid No. B. Bridge No. rn Fund Source Information Expenditure Schedule Projects Only 4 C. Project Title J N Federal Fundin R/W c U.9 E D. Street/Road Name of Number � _o r Phase Federal Federal State 4th Required ii Z E. Beginning MP or road-Ending MP or road 0 a a Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir Type Date F F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds 6th mml 1 3 6 8 9 10 11 1 12 13 14 15 16 17 18 19 20 21 CRP 2024 PE 7/1/2020 RCO 47 8 55 55 5 Dayton Creek Culvert RW 2/1/2021 10 07 13 Rd No.:04450 _ CN 8/1/2021 RCO 430 From MP 0.33 To:MP 0.33 Replace existing culvert with a new structure Total 2020 Project Cost $55,000 TOTALS 47 8 55 55 445 PE 11/1/2019 STPR 38.925 6.075 45 4.5 Harstine Island Polyester Overlay RW 4/1/2020 STPR 07 14 Rd.No.: 30000 0.28 CN 2/23/2021 STPR 2961.1 2961.1 2961 From:0.12 To: 0.40 Deck Repair Total 2020 Project Cost $3,006,100 ITOTALS 3000 6.075 3006.1 4.5 2961 Clear Zone Improvements PE 5/1/2020 HSIP 89.1 9.9 99 99 07 Rd.No.:91100-Arcadia Road RW 3/1/2021 HSIP 19.8 2.2 22 22 07 15 Rd.No:04450-Highland Road 14.76 CN 1/31/2022 HSIP 984.6 109.4 1094 1094 07 Rd.No.: 90100-Shelton Matlock Road 08 Rd.No.:14880-Kamilche Point Road Total 2020 Project Cost $1,215,000 TOTALS 1093.5 121.5 1215 99 22 1094 CRP 1993 PE 1/1/2019 RATA 4 1 5 5 Shelton Matlock Road Culvert Replacement RW 9/1/2020 5 5 5 5 07 16 Rd.No.: 90100-Shelton Matlock Road _ CN 7/15/2021 RATA 550 From: MP 8.03 To: MP 8.03 Replace existing culvert with a new structure Total 2020 Project Cost $10,000 ITOTALS 4 6 10 10 555 CRP PE 1/1/2020 200 200 200 200 Belfair Connector-Log Yard Road E RW 10/1/2020 50 50 50 100 17 Rd.No.: CN 3/1/2021 From: SR3 To: Belfair Freight Corridor Design for New Construction Total 2020 Project Cost $250,000 TOTALS 250 250 250 300 CRP 2019 PE 6/1/2019 200 200 200 200 Belfair Connector-Romance Hill RW 7/1/2020 50 50 50 100 09 18 Rd.No.: 86500 _ CN 3/1/2021 From: SR 3 To: Belfair Freight Corridor Design for New Construction Total 2020 Project Cost $250,000 ITOTALS 250 250 250 300 PE 1/1/2018 FbD 10 10 10 Skokomish Valley Road Reconstruction RW 1/2/2022 08 19 Rd.No.:41640 0.40 CN 3/1/2023 FLAP 1600 TBD From: MP 3.8 To: MP 4.6 Road Reconstruction partner w/Mason Cons Dist$8M total project cost Total 2020 Project Cost $10,000 TOTALS 10 101 101 1 1 1600 Phase Fundina BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board Page 3 of 6 Six Year Transportation Improvement Program Agency: Mason County From 2020 to 2025 Co.No.: 13 Co.Name: Mason County Hearing Date: 11/5/2019 Adoption Date: 11/5/2019 City No. --- MPO/RTPO: Peninsula Amend Date: - Resolution No.: 105-19 Project Identification L Project Costs in Thousands of Dollars Federally Funded m A. Federal Aid No. B. Bridge No. 5 Fund Source Information Expenditure Schedule Projects Only 4 N a C. Project Title d Federal Fundin R/W aD. Street/Road Name of Number Y o L Phase Federal Federal State 4th Required Z E. Beginning MP or road-Ending MP or road F a a Start Fund Cost by Fund State Local Total 1 st 2nd 3rd thru Envir Type Date F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds 6th mm/ 1 3 6 8 9 10 1 11 1 12 1 13 1 14 1 15 16 17 18 19 20 21 PE 1/2/2021 100 350 Trails Road Alternate Route-Rasor Road RW 6/1/2022 125 20 Rd.No.:62310 CN 6/1/2023 3000 From: MP To: MP Partial New Construction' Total 2020 Project Cost TOTALS 100 475 3000 CRP 1995 PE 6/1/2019 RATA 50 5 55 55 20 North Shore Road-Cady Creek Culvert Replacement RW 1/1/2021 20 08 21 Rd.No.: 70390-North Shore Rd 0.10 CN 7/1/2022 RATA 500 From: MP 6.9 To: MP 7.0 Replace existing culvert with a new structure Total 2020 Project Cost $55,000 TOTALS 50 5 55 55 40 500 CRP 2011 PE 6/1/2019 RATA 34 6 40 40 North Island Drive Culvert Replacement RW 1/2/2021 20 07 22 Rd.No.: 39630-North Island Drive 0.01 CN 7/15/2022 RATA 720 From: MP 3.46 To: MP 3.47 Replace existing culvert with a new structure Total 2020 Project Cost $40,000 TOTALS 34 6 40 40 20 720 CRP 2001 PE 10/1/2019 5 5 5 25 Homer Adams Road Culvert Replacement RW 3/1/2020 10 09 23 Rd.No.: 00610 0.10 CN 8/1/2020 300 20 From: MP 0.1 To: MP 0.2 Reconstruction Total 2020 Project Cost $5,000 ITOTALS 5 5 5 35 300 20 CRP 2021 PE 3/1/2020 RATA 5 5 10 10 60 North Shore Road-Great Bend Culvert Replacement RW 1/2/2022 20 08 24 Rd.No.: 70390-North Shore Rd 0.10 CN 7/1/2024 RATA 500 From: MP 16.6 To: MP 16.7 Replace existing culvert with a new structure Total 2020 Project Cost $10,000 TOTALS 5 5 10 10 60 20 500 CRP 2020 PE 3/1/2020 RATA 8.5 1.5 10 10 50 50 10 Old Belfair Hwy RW 5/1/2023 100 08 25 Rd.No.: 98250-Old Belfair Hwy 0.40 CN 4/1/2024 RATA 1200 From: MP 1.2 To: MP 1.6 3R Improvement-Resurfacing,Restoration and Rehabilitation Total 2020 Project Cost $10,000 ITOTALS 8.5 1.5 10 10 50 50 1310 Phase Funding BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board Page 4 of 6 Six Year Transportation Improvement Program Agency: Mason County From 2020 to 2025 Co.No.: 13 Co.Name: Mason County Hearing Date: 11/5/2019 Adoption Date: 11/5/2019 City No. --- MPO/RTPO: Peninsula Amend Date: - Resolution No.: 105-19 Project Identification t Project Costs in Thousands of Dollars Federally Funded c T A. Federal Aid No. B. Bridge No. rn Fund Source Information Expenditure Schedule Project Only E C. Project Title J N Federal Fundin R/W v r z D. Street/Road Name of Number 70 o t Phase Federal Federal State 4th Required LL E. Beginning MP or road-Ending MP or road 0 a a Start Fund Cost by Fund State Local Total 1 st 2nd 3rd thru Envir Type Date F. Describe Work to be Done mm/ddl Code Phase Source Funds Funds Funds 6th mm/ 1 3 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE Allyn Access,Circulation easement acquis Wheelwright,Wade,and RW 9/3/2019 150 150 150 40 26 Rd.No.: TBD Masterson ROW CN From: To: ROW acquisition Total 2020 Project Cost $150,000 TOTALS 150 150 150 40 PE 40 Mason Benson Intersection Safety RW 10 07 27 Rd.No.: 63010 0 10 CN 300 From: MP 2.5 To: MP 2.6 Improve Sight Distance Total 2020 Project Cost TOTALS 350 PE 60 Shelton Valley Culvert RW 30 28 Rd.No.: 05930 CN 550 From: MP 2.0 To: 2.0 Replace existing culvert with new structure Total 2020 Project Cost TOTALS 60 580 PE 1/1/2025 400 Trails Road Realignment RW 10/1/2025 50 07 29 Rd.No.:62310 0.40 CN 4/1/2026 From: MP 0.5 To: MP 1.6 Curve Realignment Total 2020 Project Cost TOTALS 450 PE 6/1/2023 210 Log Yard Road W Freight Upgrade RW 7/1/2024 50 30 CN 4/1/2025 1325 3R Improvement-Resurfacing,Restoration and Rehabilitation Total 2020 Project Cost TOTALS 1585 PE 6/1/2021 40 Clifton,Old B,SR 300 feasibility Study RW 31 CN 3R Improvement-Resurfacing,Restoration and Rehabilitation Total 2020 Project Cost ITOTALS 40 Phase Fundina BRAC-Bridge Replacement Advisory Committee FLAP- Federal Lands Access Program PE-Preliminary Engineering STP-Surface Transportation Program TP-Transportation Partnerships EM-Federal Emergency Management Act and RW-Right of Way HSIP-Highway Safety Improvement Program TAP-Transportation Alternatives Program State Emergency Management funds CN-Construction RATA-Rural Arterial Trust Account FBRB-Brian Abbot Fish Barrier Removal Board Page 5 of 6 Six Year Transportation Improvement Program Agency: Mason County From 2020 to 2025 Co.No.: 13 Co.Name: Mason County Hearing Date: 11/5/2019 Adoption Date: 11/5/2019 City No. --- MPO/RTPO: Peninsula Amend Date: - Resolution No.: 105-19 Project Identification L Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. o Fund Source Information Expenditure Schedule Projects Only .o C. Project Title J w Federal Fundin R/W v o E D. Street/Road Name of Number o L Phase Federal Federal State 4th Required i Z E. Beginning MP or road-Ending MP or road a o Start Fund Cost by Fund State Local Total 1 st 2nd 3rd thru Envir Type Date F. Describe Work to be Done mm/dd/ Code Phase Source Funds Funds Funds 6th (mm/yYL 1 3 6 8 1 9 10 1 11 12 13 14 15 16 17 18 19 20 21 PE 6/1/2021 120 Frieght Corridor Trail RW 32 CN 3R Improvement-Resurfacing,Restoration and Rehabilitation rEF- Total 2020 Project Cost TOTALS 1 1 120 TOTALS 7.18 6977.8 933.5 2698 10609.1 5010 7444 3505 16115 Future Considerations/Wishlist Completion of Trails road Alternate Route-Rasor Road in phases Cloquallum Road MP 4.6 to 5.2 curve realignments Cloquallum Road MP 6.6 to 7.2 widening Shelton Matlock Road MP 15.36 to 16.5 realign pave shoulders Johns Prairie Road add paved shoulders RR tracks to old capital hill rd Guardrail upgrades-Brockdale,McReavy,and Johns Prairie Terrace Blvd Road and Hwy 101 intersection-partner project with WSDOT Brockdale and Island Lake Road intersection-partner project with City of Shelton Illumination intersections county wide Union Boat Launch Resurfacing Trail near Roessel Road New Roads Consideration McEwan Prairie to Brockdale 101 connection Johns Prairie and Hwy 3 connection Connection between Cloquallum and City Center exit Phase Funding BRAC-Bridge Replacement Advisory Committee FBRB-Brian Abbot Fish Barrier Removal PE-Preliminary Engineering STP-Surface Transportation Program (Now Local Bridge Program) BoardFLAP- Federal Lands Access Program RW-Right of Way HSIP-Highway Safety Improvement Program TP-Transportation Partnerships EM-Federal Emergency Management Act and CN-Construction RATA-Rural Arterial Trust Account TAP-Transportation Alternatives Program State Emergency Management funds Page 6 of 6