HomeMy WebLinkAbout69-18 - Res. Six-Year Transportation Improvement Program RESOLUTION NO. V -18
Six-Year Transportation Improvement Program
WHEREAS,in compliance with 136-15 WAC,Mason County has prepared the
attachment Six-Year Transportation Improvement Program for the period January 1,2019
through December 31,2024;and,
WHEREAS,the Board of County Commissioners hereby certifies that the priority array
of potential projects on this County's road system,including bridges,was prepared by the
County Engineer during the preparation of the said Six-Year Transportation Improvement
Program; and,
WHEREAS,the Board of County Commissioners reviewed the current bridge condition
report as prepared by the County Engineer on April 30,2018; and,
WHEREAS,the Board of County Commissioners finds that the proposed 2019-2024
Six-Year Transportation Improvement Program is consistent with the County Comprehensive
plan; and,
WHEREAS,the Board of County Commissioners has held a public hearing on this 6"
day of November,2018.
NOW,THEREFORE,BE IT RESOLVED,that the attached Six-Year Transportation
Improvement Program for 2019 through 2024 be adopted,which are hereby incorporated and
made part of this Resolution.
BE IT FUTHER RESOLVED that the County Engineer is hereby directed to distribute
copies of the Six-Year Transportation Improvement Program for 2019-2024 to all required
agencies.
ADOPTED this day of Voi/emilt✓2018.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
ATTEST:
RANDY ATHERLIN,Chair
ME IS WRY,dlerk of the Board
TERRI DREXLE ,Vice Chair
APPROVED AS TO FORM:
KEVIN S , Commissioner
TIM .DPA
cc: Commissioners
Public Works
Community Development
County Road Admin.Board
WSDOT
� J
f
Six Year Transportation Improvement Program
From 2019 to 2024
Agency: Mason County
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/6/2018 Adoption Date: 11/6/2018
City No. --- MPO/RTPO:Peninsula Amend Date: - Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
ii A. Federal Aid No. B. Bridge No. rn Fund Source Information Expenditure Schedule Project Only
.rco_ E C. Project Title v N Federal Fundin R/W
v D. Street/Road Name of Number .o Phase Federal Federal State Required
u_ o_Z E. Beginning MP or road-Ending MP or road o o.0- Start Fund Cost by Fund State Local Total 1st 2nd 3rd 4th Ihru Envir Type Date
F. Describe Work to be Done ~ mm/dd/ Code Phase Source Funds Funds Funds 6th mml
1 3 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Various PE 1/1/2018 STP 26 4 30 30 60 60 180
Programmatic Preservation-HMA Overlays RW
07 Rd.No.: Various CN 6/1/2019 STP 674 321 995 95 5 4 N/A
08 1 From: MP Var To: MP Var 3.55 E
Total 2019 Project Cost $1,025,000 TOTALS 700 325 1025 1025 885 885 2655
PE 20 20 20 20 20 60
07 Programmatic Safety RW 5 5 5 5 5 15
08 2 Rd.No.: Various CN 100 100 100 100 100 300 DCE
09 From: Various To:Various
Clear Zone Project
Total 2019 Project Cost $125,000 TOTALS 125 125 125 125 125 375
PE 40 40 40 40 40 120
07 Programmatic Culvert Repair/Replacement RW 10 10 10 10 10 30
08 3 _ CN 150 150 150 150 150 450 DCE
09
Total 2019 Project Cost $200,000 TOTALS 200 200 200 200 200 600
PE 10 10 10 10 10 30
07 County-Wide Small Capital Projects RW 5 5 5 5 5 15
08 4 ___ CN 85 85 85 85 85 255 DCE
09
Total 2019 Project Cost $100,000 TOTALS 100 100 100 100 100 300
CRP 2006 PE 1/1/2015 HSIP 18 2 20 20
Bear Creek Dewatto Road Clear Zone RW 9/1/2018 HSIP 10 10 10
07 5 Rd.No.: 79800 1.50 CN 3/1/2019 HSIP 222 318 540 540 DCE 2/19
From: MP 5.2 To: MP 6.7
Clear Zone Project
Total 2019 Project Cost $570,000 TOTALS HSIP 240 330 570 570
CRP 1994 PE 1/1/2018 RATA 9 1 10 10
Highland Road Culvert Replacement RW 1/1/2019 10 10 10
08 6 Rd.No.: 04450 CN 7/1/2019 RATA 300 390 690 690 2/19
From: MP 1.47 To: MP 1.47
Replace existing culvert with a new structure
Total 2019 Project Cost $710,000 TOTALS 309 401 710 710
CRP 2014 PE 7/1/2018 FBRB 40 40 40
Deegan Road West Culvert Replacement RW 11/1/2018 10 10 10
Rd No.:06110 ___ CN 7/1/2019 FBRB 300 300 300
09 7 From MP 2.37 To:MP 2.37 2/19
Replace existing culvert with a new structure
Total 2019 Project Cost $350,000 TOTALS 340 10 350 350
Phase Fundina
PE-Preliminary Engineering STP-Surface Transportation Program
RW-Right of Way HSIP-Highway Safety Improvement Program
CN-Construction RATA-Rural Arterial Trust Account
BRAC-Bridge Replacement Advisory Committee
TP-Transportation Partnerships
TAP-Transportation Alternatives Program
Page 1 of 4
Six Year Transportation Improvement Program
From 2019 to 2024
Agency: Mason County
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/6/2018 Adoption Date: 11/6/2018
City No. --- MPO/RTPO:Peninsula Amend Date: - Resolution No.:
Project Identification Protect Costs in Thousands of Dollars Federally Funded
mA. Federal Aid No. B. Bridge No. a, Fund Source Information Expenditure Schedule Pro acts Onl
4 c 2 C. Project Title d u wF(m.dd
Federal FundingRNV
r j c E D. Street/Road Name of Number J o tFederal Federal State Required
ti a Z E. Beginning MP or road-Ending MP or road o a a Fund Cost by Fund State Local Total 1st 2nd 3rd 4th thru Envir Type Date
F. Describe Work to be Done ~ Code Phase Source Funds Funds Funds 61h mm/
1 3 6 8 9 10 11 12 13 1 14 1 15 16 17 18 19 20 21
CRP 2015 PE 7/1/2018 FBRB 40 40 40
Shelton Valley Road Culvert Replacement RW 11/1/2018 10 10 10
08 8 Rd No.:05930 _ CN 7/1/2019 FBRB 200 200 200 2/19
From MP 2.13 To:MP 2.13
Replace existing culvert with a new structure
Total 2019 Project Cost $250,000 TOTALS 240 10 250
PE 10/1/2018 300 300 300 100
Trails Road-Repairs RW 10/1/2019 50
Rd.No.:62310 CN 3/1/2020
07 9 From: MP 0.0 To: MP 1.6 0.40
Slope Stabilization and Curve Realignment
Total 2019 Project Cost $300,000 TOTALS 300 300 300 150
PE 200 200 200 200
Belfair Connector-Romance Hill RW 50 50 50 50
09 10 Rd.No.: 86500 CN 1500
From: SR 3 To: Belfair Freight Corridor
New Construction
Total 2019 Prof act Cost $250,000 TOTALS 250 250 250 250 1500
PE 1/1/2018 FbD 100 100 100
Skokomish Valley Road Reconstruction RW 4/1/2019
08 11 Rd.No.:41640 0.40
CN 3/1/2021 FLAP 1600
From: MP 3.8 To: MP 4.6
Slope Stabilization and Curve Realignment
Total 2019 Pro'ect Cost $100,000 !TOTALS 100 100 100 1600
PE 250 200
Trails Road Alternate Route-Rasor Road RW 125
12 Rd.No.:62310 CN 14000
From: MP To: MP
New Construction
Total 2019 Project Cost TOTALS 250 325 14000
PE 11/1/2016 7.5 EM 1.25 1.25 10 10
Satsop Cloquallum Mitigation RW 9/5/2017
Rd.No.:02000 0.10 CN 2/23/2018 165 EM 27.5 27.5 220 220
09 13 From: 7.7 To: 73
Bank Repair
Total 2019 Project Cost $230,000 TOTALS 172.5 26.75 28.75 230 230
CRP 1993 PE 1/1/2019 RATA 54 6 60 60 20
Shelton Matlock Road Culvert Replacement RW 1/1/1019 10
14 Rd.No.: 90100-Shelton Matlock Road CN 7/15/2020 RATA 550 2/20
From: MP 8.03 To: MP 8.03
Replace existing culvert with a new structure
07 e
Total 2019 Project Cost $50,000 TOTALS 54 6 --6—Or 60 580
Phase Fundfria
PE-Preliminary Engineering STP-Surface Transportation Program
RW-Right of Way HSIP-Highway Safety Improvement Program
CN-Construction RATA-Rural Arterial Trust Account
BRAC-Bridge Replacement Advisory Committee
TP-Transportation Partnerships
TAP-Transportation Alternatives Program
Page 2 of 4
Six Year Transportation Improvement Program
From 2019 to 2024
Agency: Mason County
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/6/2018 Adoption Date: 11/6/2018
City No. --- MPO/RTPO:Peninsula Amend Date: - Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A A. Federal Aid No. B. Bridge No. o, Fund Source Information Expenditure Schedule Protects Only
o .o E C. Project Title J m N Federal Fundin RNV
— D. Street/Road Name of Number .o Phase Federal Federal Stale Required
u_ a Z E. Beginning MP or road-Ending MP or road o o.a Start Fund Cost by Fund State Local Total 1st 2nd 3rd 4th thru Envir Type Date
F. Describe Work to be Done ~ mm/dd/ Code Phase Source Funds Funds Funds 6th mm/
1 3 6 8 9 10 11 121-13--F14 I 15 16 17 18 19 20 21
CRP 1995 PE 1/1/2020 RATA 54 6 60 60 20
North Shore Road-Cady Creek Culvert Replacement RW 6/1/2020 20
08 15 Rd.No.: 70390-North Shore Rd CN 7115/2021 RATA 500
From: MP 6.92 To: MP 6.92
Replace existing culvert with a new structure
Total 2019 Project Cost $60,000 TOTALS 54 6 60 60 40 500
CRP 2011 PE 1/1/2020 RATA 72 8 80 80 20
North Island Drive Culvert Replacement RW 6/1/2020 20
07 16 Rd.No.: 39630-North Island Drive CN 7115/2021 RATA 720
From: MP 3.46 To: MP 3.47
Replace existing culvert with a new structure
Total 2019 Project Cost $80,000 TOTALS 72 8 80 80 760
CRP 2001 PE 5/1/2015 30 30 30 30
Homer Adams Road Culvert Replacement RW 9/1/2015 10
09 17 Rd.No.: 00610 0 10 CN 1/31/2018 250
From: MP 0.1 To: MP 0.2
Reconstruction
Total 2019 Project Cost $30,000 TOTALS 30 30 30 290
PE 11/1/2016 15
Frisken Y Road Instersection Improvement RW 9/5/2017 5
09 18 Rd.No.: 00690 0.10 CN 2/23/2018 100
From: 0.0 To: 0.1
Reconstruction
Total 2019 Project Cost TOTALS 120
PE 40 40 40 170
Log Yard Road W Freight Upgrade RW 50
1 g CN 1325
3R Improvement-Resurfacing,Restoration and Rehabilitation
Total 2019 Project Cost $40,000 TOTALS 40 40 40 220 1325
PE 40
Mason Benson Intersection Safety RW 10
Rd.No.: 63010 CN 300
07 20 From: MP 2.5 To: MP 2.6 0.10
Improve Sight Distance
Total 2019 Protect Cost TOTALS 350
PE 20
North Shore Road-Great Bend Culvert Replacement RW 20
08 21 Rd.No.: 70390-North Shore Rd CN 500
From: MP 16.6 To: MP 16.6
Replace existing culvert with a new structure
Total 2019 Project Cost TOTALS 1 1 540
Phase Fundina
PE-Preliminary Engineering STP-Surface Transportation Program
RW-Right of Way HSIP-Highway Safety Improvement Program
CN-Construction RATA-Rural Arterial Trust Account
BRAC-Bridge Replacement Advisory Committee
TP-Transportation Partnerships
TAP-Transportation Alternatives Program
Page 3 of 4
Six Year Transportation Improvement Program
From 2019 to 2024
Agency: Mason County
Co.No.: 13 Co.Name:Mason County Hearing Date: 11/6/2018 Adoption Date: 11/6/2018
City No. --- MPO/RTPO:Peninsula Amend Date: - Resolution No,
Project Identification Project Costs in Thousands of Dollars Federally Funded
B A. Federal Aid No. B. Bridge No. rn Fund Source Information Expenditure Schedule Project Only
o a c m C. Project Title J v Federal Fundin RNV
c 'c F D. StreeVRoad Name of Number 3' Phase Federal Federal State Required
ii a Z E. Beginning MP or road-Ending MP or road o a a Start Fund Cost by Fund State Local Total 1st 2nd 3rd 4th lhru Envir Type Date
F. Describe Work to be Done ~ mm/dd/ Code Phase Source Funds Funds Funds 6th mrn/
1 3 1 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21
CRP 1970 PE 5/1/2015
Matlock-Brady Realignment RW 9/1/2015
Rd.No.: 90100 CN 6/1/2018 RATA 800 1200 2000 2000
07 22 From: MP 26.3 To: MP 27.4 1.10
3R Improvement-Resurfacing,Restoration and Rehabilitation
Total 2019 Project Cost $2,000,000 TOTALS 800 1200 2000 2000
CRP 2009 PE 5/1/2015
Belfair Area Sidewalks-Old Belfair Highway RW 9/1/2015
Rd.No.:98250-Old Belfair Hwy CN 3/1/2019 100 100 100
07 23 From: MP 0.0 To: MP 0.1 1.10
ToW 2019 Project Cost $100,000 TOTALS 100 100 100
PE 120
Old Belfair Hwy RW 100
08 24 Rd.No.:98250-Old Belfair Hwy 0,40 CN 1200
From: MP 1.2 To: MP 1.6
3R Improvement-Resurfacing,Restoration and Rehabilitation
Total 2019 Project Cost TOTALS t74
PE
Allyn Access,Circulation and ROW Wheelwright,Wade,and RW 100 100 100 100
25 Rd.No.: TBD Masterson ROW _ CN
From: To:
ROW acquisition
Total 2019 Project Cost $100.000 ITOTALS 100 100 100 100 40
TOTALS 7.65 1112.5 1997.8 3569.8 6680 6680 3850 5495 21565
Phase Fundina
PE-Preliminary Engineering STP-Surface Transportation Program
RW-Right of Way HSIP-Highway Safety Improvement Program
CN-Construction RATA-Rural Arterial Trust Account
BRAC-Bridge Replacement Advisory Committee
TP-Transportation Partnerships
TAP-Transportation Alternatives Program
Page 4 of 4