Loading...
HomeMy WebLinkAbout23-18 - Res. for County Road Project No. 2014 Deegan Road West MASON COUNTY COMMISSIONERS RESOLUTION NO:, 1� COUNTY ROAD PROJECT NO. 2014 WHEREAS,on Mason County Road No.06110,known locally as the Deegan Road West and more specifically located in Sec. 35,T.20 N,R 4 W,WM,at approximately mile post 2.37; work defined as"construction'in the BARS Manual, Page II-63,et seq,is determined to be necessary and proper; and, THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Replace existing undersized culvert with a single structure that will carry flows under this critical roadway. SAID WORK is to be performed by Contract and/or County Forces in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County. (RCW 36.77.060 and/or RCW 26.77.065) BE IT FURTHER RESOLVED that the described County Road Project is necessary and proper,and the estimated costs of said project are herewith set out as follows: Engineering: 5$ 2,150 Right of Way $20,000 Construction $511,325 The County Road project herein described in HEREBY DECLARED to be a public necessity,and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law,provided and in accordance with RCW 36.77.070 et.seq. rd ADOPTED this day of PPI,, 2018. BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON Ran,dy Neatherlin, hair ATTEST: LML-)J�� Terri rexler,Commis oner M iss r wry,Cle c of the Board g-2— Kevin Shutty,910mmissioner APPROVED AS TO FORM: Tim Whitehead, Deputy Prosecuting Attorney cc: Co.Commissioners Engineer JOURNAL: Pub[. It: