HomeMy WebLinkAboutBLD2015-00602 Final Pole Bldg - BLD Inspections - 3/15/2016 o CONCRETE MECHANICAL MANUFACTURED HOME
0
C:
Date By 0
Footings I Setbacks Gas Piping Ribbons
onter�oc Dale By inlertor-Dole By Date By
By !iZ-<,1Exter)nr- Date Ely
r0 Exter� Dale Set-up
Point Load I Isolated Feelings INSULATION
Date By
BG I SLAB INSULATION m
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Date By DECKS
FRAMIN Walls Date By
D 2 Data By
L4
Date By. PROPANE TANKS
P MB�/
LUMBIN Vault Date ey
Date By
OTHER
Groundwork
i Attic
Type
Date BY Date By Data By
----iDRYWALL
D.W.V Type
Int.Brace Wall Dale By
-0 Dale BY
Date By
FINAL INSPECTION
Water Line rimSeparation ha
CD
Date BY Date By Date Byw
Pass Or Request Inspect. E 60
Type of Insp. Fail Date Date Done By Comments cr)
CD
0
-5-11 112�e,111,
J- L
A
0
0
--- ----
0
lD
Upw
CD
0
--------------