Loading...
HomeMy WebLinkAboutBLD2015-00602 Final Pole Bldg - BLD Inspections - 3/15/2016 o CONCRETE MECHANICAL MANUFACTURED HOME 0 C: Date By 0 Footings I Setbacks Gas Piping Ribbons onter�oc Dale By inlertor-Dole By Date By By !iZ-<,1Exter)nr- Date Ely r0 Exter� Dale Set-up Point Load I Isolated Feelings INSULATION Date By BG I SLAB INSULATION m Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Date By DECKS FRAMIN Walls Date By D 2 Data By L4 Date By. PROPANE TANKS P MB�/ LUMBIN Vault Date ey Date By OTHER Groundwork i Attic Type Date BY Date By Data By ----iDRYWALL D.W.V Type Int.Brace Wall Dale By -0 Dale BY Date By FINAL INSPECTION Water Line rimSeparation ha CD Date BY Date By Date Byw Pass Or Request Inspect. E 60 Type of Insp. Fail Date Date Done By Comments cr) CD 0 -5-11 112�e,111, J- L A 0 0 --- ---- 0 lD Upw CD 0 --------------