HomeMy WebLinkAboutMEP2012-00017 Cancelled - MEP Permit / Conditions - 10/23/2012 PSpN'57q rfp� MASON COUNTY
o N DEPARTMENT OF COMMUNITY DEVELOPMENT
oN Planning Division
Z'J N Y ti P O Box 279, Shelton, WA 98584
o� 20 (360)427-9670
1864
MASON ENVIRONMENTAL PERMIT
October 23, 2012
CITY OF TACOMA-PUBLIC UTILITIES
ATTN PAT LEACH
3628 SOUTH 35TH ST
Parcel No.: 122163280310
Issued: 10/23/2012
Case No.: MEP2012-00017
Project Description:
Along existing over-water powerline alignment over North Bay, replace four in-water
structures with one new in-water structure. One existing upland structure on each
side will be moved further upland when replaced. The eastside tower will be moved
outside shoreline jurisdiction; the westside tower is already outside of shoreline
jurisdiction.
The following critical areas are present on this property:
Long-Term Commercial Forest XX FWHCA
Ch. 17.10.060, Ch. 17.01.110;
Mineral Resource Lands XX Frequently Flooded Areas
Ch. 17.01.066, Ch. 17.01.090;
Inholding Lands XX Landslide Hazard Areas
Ch. 17.01.062, Ch. 17.01.100;
XX Wetlands Seismic Hazard Areas
Ch. 17.01.070, Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance
(Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with
any other federal, state, or local statutes, ordinances, or regulations applicable to this project.
This permit may be rescinded if the permitee fails to complete the project as proposed or fails
to comply with the standards of this ordinance.
f� � IC12-3
Authorized Local Government Official Date
Mason Environmental Permit
10/23/2012 Case No.: MEP2012-00017
Conditions:
1.) Approved per dimensions and setbacks on submitted site plan.
2.) The applicant acknowledges that the project will be completed as proposed, so that the
project will be consistent with all applicable standards of the Mason County Resource
Ordinance.
3.) Permit conditions from Shoreline Conditional Use Permit approval (SHR2012-00009),
effective November 8, 2012:
1. Hydraulic Project Approval (HPA) shall be obtained from the Washington Department of
Fish and Wildlife prior to beginning any site preparation and construction work.
2. A Section 10 Permit(Rivers and Harbor Act of 1899) or exemption must be granted by
the U.S. Army Corps of Engineers prior to work within navigable waters of the United
States.
3. All debris, overburden and other waste materials from construction will be disposed of
in such a manner as to prevent their entry by erosion or from drainage into any water
body.
4. All excess debris/fill not required for the project design must be removed from the site
after project completion. Such debris may not enter or cause water quality degradation of
State waters.
5. Fill materials for tower foundation abutments shall be of such quality(source or
concrete origin)that they will not cause degradation of water quality.
6. Silt fencing, straw, or jute matting to be installed and maintained for erosion control in
all disturbed upland areas. Erodible cuts shall be protected by planting or matting
immediately following construction.
7. Construction staging areas shall have proper erosion control in place during their
usage, and the site shall be restored to a natural condition shortly after abandonment by
construction activity.
8. Construction to occur during daylight hours to minimize noise impacts.
9. The applicant/owners shall apply for a Mason Environmental Permit to implement the
restoration of native vegetation plantings addressed in the Biological Evaluation prepared
by David Evans&Associates dated April 2012.
10. The applicant/owner shall implement the recommendations of the Archaeological
Survey of Tacoma Power's Potlatch Transmission Line Phase 2 North Bay Crossing
Project prepared by Gary Wessen (Wessen &Associates), April 1012.
1 012 312 01 2 MEP2012-00017
MASON ENVIRONMENTAL PERMIT($630 $380 /other permit) Mason County Permit Center Use:
❑ CONDITIONAL USE ($1520) MEP ZO 1 Z. - CCO I
❑ HABITAT MANAGEMENT PLAN REVIEW($445)
Date Rcvd 5`Z 1 'Z0,1 Z
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Resource Ordinance(Chapter 17.01 MCC)
ENVIRONMENTAL PERMIT APPLICATION
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is
under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW.
PLEASE PRINT
1. PROPERTY OWNER
r /
Name: �, , E 6 I(iC �CC tGl I� b�(C U � �' teS AHo PcJ
Mailin Address (o Z I
I { q G i(ti1 cti
Work Phone: Z53. OZ . Q lZZ Email Address:
Home/Cell Phone: 253. ;e7 ZY 54 Fax#. 7 —c?6 o3CH5
If an agent is acting for the property owner during the permit process, complete#2.
2. AUTHORIZED AGENT
\Name: C\ cvG
Mailing Address: q; ,
Work Phone: y�� S�Cf CScy EmailAddress: �CLS�tit cN nG. CGFti�
Home/Cell Phone: 1\14 Fax# 412 S.
3. PROJECT SITE
Site Address: � nSlti�S�re+,� L: ,^E — ��r��t �Ci C��� n�
Parcel#: see z A Legal Description: 171 TZZ 11)
Directions to Site: °��-•��"�� "�`� C-'x�' ^`j , 1j@.tir /e, - A e/A BG tT C. b
S�3c � J
Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences,
Water Lines,Driveways,Drainage Plans, Shorelines,Septic System,Topography,Proposed
Improvements,Easements,North Arrow, and Scale. Also draw a separate topography diagram.
I`Community Decelopmenf.PAC�F(F_P Page 1 of RC,Ised&me 2010
4. State which section requires permit:
❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas, Chapter 17.01.090
❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100
❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas, Chapter 17.01.102
❑ Erosion Hazard Area,Chapter 17.01.104 Fish&Wildlife Habitat Conservation Areas,Chapter
❑ In-Holding Lands,Chapter 17.01.062 17.01.110
X Wetlands,Chapter 17.01.070
5. Identify current use of the property with existing improvements:
n,.a T I hid t c �ifi�,'�, �5n.� L"Vk _.J , C.1 L-•nt'
6. Identify and describe the proposed project, including the type of materials to be used, construction methods,
principle dimensions, and other pertinent information (attach additional sheets, if needed):
Gtt_ '�S wcjz , ec� n-wi' 2
5'��.-GSAC
' I \ !
hc'tl7 rti%. �ICi�SC ��� rLic�citC� � �7� r�1.-V�C -��' 1pr C�� �A'\C , t�. 'GO(r�Cr_
C00 -t e- ec�SF &'cue_ p'C I"o 4,4% i S w? ii'n Sb..o-p-LNe- �jvr;Sdtc{,m
i�ut wr U be C�--p.lacecl - w 4-0) �, new 40vVP_F 0,4s11�e YAe)reAlneJ,rir�v{;ev
7. Describe why the action requiring this permit cannot be avoided.
St 'ES Cc -A
8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes J No
9. Identify any surface water on or adjacent to property (circle one):
Saltwater Lake Stream Pond Wetland /Dr�Ditch,
10. Identify existing septic/sewer connection(circle one): If septic is located on project site, include records.
Connected to Septic Connected to Community Septic
11. Identify existing water supply (circle one): /fir Public Water Supply Well
11. Type of Job (circle one):
New Add Alteration Repair Demolition Other:
Print Name Signature Date
1 ,.wmmin DQ,�'Vq (gent PA n11 P Pagc2 of R nn c l-,ne 7110
r � i.
PORTION OF SE 1/4 OF SEC 17, SW 1/4 OF SEC 16, SE 1/4 OF SEC 16
TWP. 22 N, RGE. 1 WEST W.M.
NEW 3-POLE ACCESS ROAD
STRUCTURES _
/Vp� SR3
R q y SEE SITE
ACCESS
PLAN-WEST.
R�=
OLD TOWERS ORDINARY HIGH
TO BE WATER LINE
DEMOLISHED
SEE MARINE SEE PLAN AND
FOUNDATION PROFILE SHEETS.
PLANS.
NORTH
BAY
OLD TOWERS
TO BE SEE PLAN AND
DEMOLISHED PROFILE SHEETS.
SEE SITE
MITIGATION SITE ACCESS
PLAN-EAST.
ORDINARY HIGH
rR�E S WATER LINE
�Eo
DECUNATION:-1637' ACCESS ROAD
CHANGING BY 010' A YEAR
NOTE: OVERHEAD
rm=�=mmmmmml9 I NEW SINGLE-POLE POWER LINES OMITTED
0 300 600 1200 STRUCTURES FOR CLARITY.
REFEUNOR f; PROJECT LOCATION: PROPOSRD PEOIRCf;
NORTH BAY POTLATCH TRANSMISSION LINES
NORTH BAY CROSSING REBUILD
1p APPLICANT: UT/LONG: IN; NORTH BAY
TACOMA PUBLIC UTILITIES LATITUDE 47' 23' 24' N_ NFAR/AT: ALLYN, WA
DAVID EVANS LONGITUDE 122' 49' 08 W COUNTY; MASON
w..ASSOCIATES..c DAT IL- HORIZ: SOUTH NAD 83/91 STATE: WA
VERT: NAVD 88
S= 2 OF 14 DAM 04/18/2012
ta.�maaoo
SHEET Tn7Z: PROJECT PLAN VIEW