ENVIRONMENTAL CHECKLIST
Purpose of Checklist:
The State Environmental Policy Act(SEPA),Chapter 43.21 RCW,requires all governmental agencies to
consider the environmental impacts of a proposal before making decisions. An environmental Impact statement
(EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the
environment. The purpose of this checklist is to provide information to help you and the agency identify impacts
from your proposal(and to reduce or avoid impacts from the proposal,if it can be done)and to help the agency
decide whether an EIS is required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal.
7 Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are
l
significant,requiring the preparation of an EIS. Answer the questions briefly,with the most precise information
known,or give the best description you can.
You must answer each question accurately and carefully,to the best of your knowledge. In most cases,you
should be able to answer the question from your own observations or project plans without the need to hire
-b experts. If you really do not know the answer,or if a question does not apply to your proposal,write "do not
know"or"does not apply". Complete answers to the questions now may avoid unnecessary delays later.
Q Some questions ask about governmental regulations,such as zoning,shoreline,and landmark designations.
Answer these questions if you can. If you have problems,the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal,even if you plan to do them over a period of time
or on different parcels of land. Attach any additional information that will help describe the your proposal or its
environmental effects. The agency to which you submit this checklist may ask you to explain your answers or to
provide additional information reasonably related to'determining if there may be significant adverse impact.
J
Use ojchecklist for nonproJect proposals:
V
Complete this checklist for nonproject proposals,even though questions may be answered"does not apply."
4 4 -(, IN ADDITION,complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS(Part D).
.� For nonproject actions,the references in the checklist to the words"project,""applicant,"and"property or
site"should be read as"proposal," "proposer,"and"affected geographic area," respectively.
6. v
b �
A. BACKGROUND
�f 1. Name of proposed project, if applicable: 8AMA HAMA Pit X-6 3
s It 2. Name of applicant: HAtrA ftfrm A Co
vf 3. Address and phone number of applicant and contact person: 3 a A✓ yilr L� �`t
4. Date checklist prepared: - Z Z-U 3 9 S-rS-
F
5. Agency requesting checklist:
�d 6. Proposed timing or schedule(including phasing,if applicable): f3p�j f+ni� no�✓ , Ver� k^j -fer,►, Pr !rcL
�7:, Do you have any plans for future additions,expansion,or further activity related to or connected with this proposal?
' If yes,explain. S p �k�o a.K. r S art p ro�_P�r o��J".�e�t vp 0.
60J—PItti-s. aA j rectsal too+. o{ �vrreat rro�![i,
8. List any environmental information you know about that has been prepared,or will be prepared,directly related to
LooktI it ffsrw, w 1 ,- ram.. o f� "fives wi'4t cI„--f�) A% J -b o E
ejf,<;--V5 2. rV o_qn — d�lEr�++iKe1 -f. 44Z R KOK- ;JIVC <
this proposal.
9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the
property covered by your proposal?If yes,explain. No
10. List any government approvals or permits that will be needed for your proposal,if known.
P !V F,_ Re(.lQw•ti0- p 1a.-
1 t. Give brief,complete description of your proposal,including the proposed uses and the size of the project and site.
There are several questions later in this checklist that ask you to Describe certain aspects of your proposal. You do
not need to repeat those answers on this page. (Lead agency may modify this form to include additional specific
information on project description.) m ih c t- e x i i t iu. bt+L, ) FZ e-s toc k w;K s a='15
Grew -f-".Aer
12. Location of proposal. Give sufficient information for person to understand the precise location of your proposed
project, including a street address, if any,and section,township,and range,if known. If a proposal would occur
over a range of area,provide the range or boundaries:of the site(s). Provide a legal description,site plan,vicinity
map,and topographical map,if reasonably available. While you should submit any plans required by the agency,
you are not required to duplicate maps or detailed plans submitted with any applications related to this checklist.
rn P 3 2-0 N;.",a 10► �a t 4 Sec. 2-1 T 7-
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site(circle one): Flat,rolling,hilly,steep slopes,mountains,other
Flit tap 6.1 da-fto)— , stRfp i.. t.t~e,
b. What is the steepest slope on the site(approximate percent slope)?
c. What general types of soils (for example, clay, siarmianl
eat, muck)? If you know the classification of
agricultural soils,specify them and note any prime
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,describe.
MO
e. Describe the purpose,type,and approximate quantities of any filling or grading proposed. Indicate source of fill.
A16N/C
f. Could erosion occur as a result of clearing,construction,or use? If so,generally describe.
No
g. About what percent of the site will be covered with impervious surfaces after project construction(for example,
asphalt or buildings)? Move
e
h. Proposed measures to reduce or control erosion,or other impacts to the earth,if any:Cold rio-ct a 5 +br►•.µntiFo- c le,+t -- f--i i f YIAceS---
y
2. Air
a. What types of emissions to the air would result from this proposal(i.e.dust,automobile,odors,industrial wood
smoke)during construction and when the project is completed? If any,generally describe and give approximate
quantities if known. -Dvst 7Die3le, eXLo,-s-t 4'r-A, rtrvc.ks
b. Are there any off-site sources of emissions or odor that may affect your proposal? if so,generally describe.
IV o
c. Proposed measures to reduce or control emissions or other impacts to air,if any:
Na NE
3. Water
a. Surface:
2
4
1) Is there any surface water body on or in the immediate vicinity of the site(including year-round and seasonal
streams, saltwater, lakes,ponds,wetlands)? If yes,describe type and provide names. If appropriate,state what
stream or river it flows into. No fiL+. Na►X-- Na— Rive.- a--1 f l c wt f.; d,ev, svev-
z.oc �tet AWa_j -frar" 'Eit s to
2) Will the project require any work over,in,or adjacent to(within 200 feet)the described waters? If yes,please
describe and attach available plans. 140
3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or
wetlands and indicate the area of the site that would be affected. Indicate the source of the fill material.
N/A
4) Will the proposal require surface water withdrawals or diversions? Give general description,purpose, and
approximate quantities if known. No
5) Does the proposal lie within a 100 year floodplain? If so,note location on the site plan.
No
6) Does the proposal involve any discharges of waste materials to surface waters? If so,describe the type of waste
and anticipated volume of discharge. /V 0
b. Ground:
1) Will groundwater be withdrawn, or will water be discharged to groundwater? Give general description,
purpose,and approximate quantities if known. /vd
2) Describe waste material that will be discharged into the ground from septic tanks or other sources,if any(for
example: Domestic sewage; industrial,containing the following chemicals . . .;agricultural;etc.). Describe the
general size of the system,the number such systems,the number of houses to be served(if applicable),or the
number animals or humans the system(s)are expected to serve.
c. Water Runoff(including storm water):
1) Describe the source of runoff(including storm water)and method of collection and disposal,if any(include
quantities if known). Where will this water flow? Will this water flow into other waters? If so,describe.
�1/o R",of4 eic.,-f1t .e�tre�,c S tp�Y-s eVR14. -tie- i t Jets het Pct f• d ,ate
2) Could waste material enter ground or surface waters? If so,generally describe. i���t y� S•�k� .
/Y4
d. Proposed measures to reduce or control surface,ground,and runoff water impacts, if any:
4. Plants
a. Check or circle types of vegetation found on the site:
�(deciduous tree:alder,maple,aspen,other
y, evergreen tree: fir,ceder,pine,other
�t shrubs
grass
_pasture
_crop or grain
_wet soil plants:cattail,buttercup,bulrush,skunk cabbage,other
_water plants:water lily,eelgrass,milfoil,other
_other types of vegetation
b. What kind and amount of vegetation will be rem/o� ved'or altered?
RtMOVC � _D—J t1Y 0-ke-1 .1 W, K.iti1�f
c. List threatened or endangered species known to be on or near the site.
ti��as�a.,a e 13a►1 Eal�
3
d. Proposed landscaping,use of native plants,or other measures to preserve or enhance vegetation on the site,if any:
• �r'a" t bvti�r- �_gR.o ��u�-S� '1._S /?S / •t•,•,� C� r apt e� -�i-crl.
5. Animals f}-k kt-4,,-es-t AJ j,a-r" al 4f-4L Re�la„.at;a_ l
a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site:
birds: aw"beaver,
songbirds,other:
mammals: other:
fish:bass, erring,shellfish,other:
b. List any threatened or endangered species known to be on or near the site.
c7«0.5;# ,� 134A, E451e
c. Is the site part of a migration route?If so,explain.
NO
d. Proposed measures to preserve or enhance wildlife,if any:
Ke— +wes t
6. Energy and Natural Resources
a. What kinds of energy(electrical,natural gas,oil,wood stove,solar)will be used to meet the completed project's
energy needs? Describe whether it will be used for heating,manufacturing,etc.
N/a
b. Would your project affect the potential use of solar energy by adjacent properties?If so,generally describe.
wO
c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures
to reduce or control energy impacts, if any:
7. Environmental Health
r�
a. Are there any environmental health hazards,including exposure to toxic chemicals,risk of fire and explosion,spill,
or hazardous waste that could occur as a result of this proposal? If so,describe.
l) Describe any emergency services that might be required.
fker+o-t - poss-b.1"44 'T ft-frpe_t 'iFrrt , f•l spt►Ir
2) Propose measures to reduce or control environmental health hazards, if any:
rhal,ttdt,, egrc�M.e..t fro pe-ri
b. Noise 21
1) What types of noise exist in the area which may affect your project(for example:traffic,a ui)ment,operation,
other)?
2) What types and levels of noise would be created by or associated with the project on a short-term basis(for
example:traffic,construction,o emotion,other)? Indicate what hours noise would come from the site.
3) Proposed measures to reduce or control noise impacts, if any:
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties? Tr*. , , „� Sin C,,,�,�.� rP 5 Qy H 6-
b. Has the site been used for agriculture? If so,describe. !V d
c. Describe any structures on the site.
d. Will any structures be demolished? if so,what? /yam
4
( r°
e. What is the current zoning classification of the site UM;he n„I Ries trtc_-
f. What is the current comprehensive plan designation of the site? se wee as RLe'c
g. If applicable,what is the current shoreline master program designation of the site? IWA
h. Has any part of the site been classified as an"environmentally sensitive"area? If so,specify. NO
i. Approximately how many people would reside or work in the completed project? /VC»e
j. Approximately how many people would the completed project displace? /Vr, Y7G'
k. Proposed measures to avoid or reduce displacement impacts,if any: /Vo n 2
1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any:
41 e d-
9.Housing
a. Approximately how many units would be provided,if any? Indicate whether high,middle or low-income housing. IVO
b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income jA
housing.
c. Proposed measures to reduce or control housing impacts,if any: N/
10. Aesthetics
*' a. What is the tallest height of any proposed structure(s),not including antennas;what is the principal exterior building
material(s)proposed? /41 Y70-
b. What views in the immediate vicinity would be altered or obstructed? e,
c. Proposed measures to reduce or control aesthetic impacts,if any:
see y - ve
11. Light and Glare
a. What kind of light or glare will the proposal produce? What time of day would it mainly occur? Ala»Q
b. Could light or glare from the finished project be a safety hazard or interfere with views?
c. What existing off-site sources of tight or glare may affect your proposal?
d. Proposed measures to reduce or control light and glare impacts,if any: /VO»e
12. Recreation
a. What designated and informal recreation opportunities are in the immediate vicinity? /Ala He
b. Would the proposed project displace any existing recreational uses? If so,describe. Nza
c. Proposed measures to reduce or control impacts on recreation,including recreational opportunities to be provided No het
by the project or applicant,if any:
13. Historic and Cultural Preservation
a. Are there any places or objects listed on,or proposed for,national,state,or local preservation registers known to be
on or next to the site? If so,generally describe.
b. Generally describe any landmarks or evidence of historic,archeological,scientific,or cultural importance known to N'a vie
be on or next to the site? If so,generally describe.
c. Proposed measures to reduce or control impacts, if any:
14. Transportation
a. Identify public streets and highways serving the site,and describe proposed access to the existing street system.
Show on site plans if any. U
b. Is the site currently served by public transit? If not,what is the approximate distance to the nearest transit stop?
c. How many parking spaces would the completed project have? How many would the project eliminate? Al"*�c
d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including /va
driveways? If so,generally describe(indicate whether public or private).
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally Wa
describe.
f. How many vehicular trips per day would be generated by the completed project? If known,indicate when peak
volumes would occur. c�cc •n,o»a
g. Proposed measures to reduce or control transportation impacts, if any: Ne%j?e, .
15. Public Services
a. Would the project result in an increased need for public services(for example: fire protection,police protection,
health care,schools,other)? If so,generally describe. No
b. Proposed measures to reduce or control direct impacts on public services,if any. A1O P"e
16. Utilities
a. Circle utilities currently available at the site•electri3ity natural gas water efuse Qervice)jjleph;sanitary sewer,
septic system,other. CtV ft N/ohe
f� �� — ft.eSe a...e aV.4.11
" hQAY�`, ,
b.Describe the utilities that are proposed for the project,the utility providing the service,and the general construction Ake-
activities on the site or in the immediate vicinity which might be needed.
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying
on them to make its decision.
Signature:
Review by:
6
Title:
Date: Z c - a 3
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(Do not use this sheet for project action)
Because these questions are vey general, it may be helpful to read them in conjunction with the list of the elements
of the environment.
When answering these questions,be aware of the extent the proposal,or the types of activities likely to result from
the proposal,would affect the item at a greater intensity or at a faster rate than if the proposal were not
implemented. Respond briefly and in general terms. some a;'5 - rKkR'ist
IV0
1. How would the proposal be likely to increase discharge to water;emissions to air;production,storage,or
release of toxic or hazardous substances;or production of noise?
\- tvaf ;-s — l,.af-..I—s '--> 5o mG lief-� e�, ;r•n.r,t ko i��
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants,animals,fish or marine life?
YY1��;K.e�t _ bCCQ�k —ttG vA47(t .,s- '% C.h-`d{;c�y
Proposed measures to protect or conserve Oants,animals,fish,or marine life are: �v r r�•.t .,S
3. How would the proposal be likely to deplete energy or natural resources?
We- Ihtc�l "I- J-ep left 'f^;1 �rfV� r GSo it c r
Proposed measures to protect or conserve energy and natural resources are:
N A
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designed(or eligible
or under study)for governmental protection:such as parks,wilderness,wild and scenic rivers,threatened or
endangered species habitat,historic or cultural sites,'wetlands,fl000dplains,or prime farmlands?
IV0 I-t�tec
Proposed measures to protect such resources or to avoid or reduce impacts are:
/Y/q
5. How would the proposal be likely to affect land and shoreline use,including whether it would allow or
encourage land or shoreline uses incompatible with existing plans? NIA
Proposed measures to avoid or reduce shoreline and land use impacts
/V A
6. How would the proposal be likely to increase demands on transportation or public services and utilities?
rjo-me ae`it-ia—k -T"--K +r. ff;. o,— 0.--}
Proposed measures to reduce or respond to such demand(s)are: U
Nuke. svm 4-�. Tr.,.ki fi7[tS
7. Identify, if possible,whether the proposal my conflict with local,state,or federal laws or requirements for the
protection of the environment.
�o G a h-c I f CT
a:\cheklist&supp
1/26/99
7
MASON COUNTY Shelton (360)427-9670
DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467
so Planning 360 Elma
Mason County Bldg. 1411 N.5th ( ) 482-5269
P.O.Box 279 Shelton,WA 98584
F
January 21, 2004 -
.rM
Hama Hama Co.
Attn: David Robbins
301 N. Webb Road
Lilliwaup WA 98555
Re: SEPA checklist and SM-6 form for proposed surface mine expansion. Parcel
number 32427-14-00000.
Dear Mr. Robbins,
The County received your DNR SM-6 form and SEPA checklist in December 2003,
however to date we have not received the other information and fees needed to process
these documents. Please also refer to my letter dated September 15, 2003. As we cannot
process these forms as submitted I am returning them to you until you are ready to submit
all of the necessary information, applications and fees. I forwarded the Mason
Environmental Permit Application in September. If you need another copy they are
available from the County Permit Assistance Center(427-9670 ext. 281 or 284).
Enclosed are the new fees for 2004. As previously discussed some of the items needed
would be a Mason Environmental Permit Application, Geotechnical Report, accurate site
plans and copy of the project restoration plan. The new planner for your area is Tammi
Clark, and she may be involved in future review of this proposal,however I will also be
available for questions and information.
Thank you for your time.
Sincerely,
Scott ong ecker, Senior Planner
Mason C ty DCD
CC: Carol Serdar, DNR Earth Resources
Tammi Clark, Shoreline Planner
Parcel file
COUNTY OR MUNICIPALITY
a" WASHINGTON STATE DEPARTMENT OF APPROVAL FOR
R� Natural Resources SURFACE MINING
(Form SM-6)
NAME OF COMPANY OR INDIVIDUAL APPLICANT(S) TOTAL ACREAGE AND DEPTH OF PERMIT AREA
Same as name of the exploration permit holder. (Type or print in ink.) (Include all acreage to be disturbed by mining,setbacks.and buffers.
and associated activities during the life of the mine.) (See SM-8A.)
HA mA HHmA �� Total area disturbed will be -Five acres
Maximum vertical depth below pre-mining topographic grade is
.300 feet
Maximum depth of excavated mine floor is -feet
relative to mean sea level
COUNTY m tq 5 4 N
MAILING ADDRESS No attachments will be accepted. Legal description of permit area:
301
C1 N $b� 1/4 1/4 Section Township Range
V��s� t or 'Y Z� z y IVj 3 H/
z � N � 3v✓
X. ' s
Telephone 3 E 0 9 7 7 S_g/ c
Proposed subsequent use of site upon completion of reclamation
Tie
Signature of company representative or individual applicant(s) Name and title of company representative (please print) Date signed
41 �b�bikl �' �Z— � �
TO BE COMPLETED • • OR /
Please answer the following questions 'yes' or'no'. Yes I No
1. Has the proposed surface mine been approved under local zoning and land-use regulations?
2. Is the proposed subsequent use of the land after reclamation consistent with the local land-use plam'designation?
When complete,return this form to the appropriate Department of Naturai Resources regional office.
Name of planning director or administrative official (please print) Address d
9 r
Pik
Signature
a - �
Title (please print) - 7 a�` - '! a i i ,.���•r
Telephone Date DNR Reclamation Permit No.
County or Municipality Approval(SM-6) Revised V01
MASON COUNTY Shelton (360) 427-9670
DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467
Planning Elma 360
Mason County Bldg.1 411 N.5th ( ) 4 82-5269
P.O.Box 279 Shelton,WA 98584
September 15, 2003
Hama Hama Co.
Attn: David Robbins
301 N. Webb Road
Lilliwaup WA 98555
Re: Application for Reclamation Permit and SEPA review for proposed surface mine
expansion.
Dear Mr. Robbins,
We recently met on site to look at your proposed gravel mine expansion in Eldon WA.
Due to steep slopes on and near the site a Geotechnical Report will be needed to evaluate
slope stability, seismic and erosion issues. The Mason County Resource Ordinance
Landslide Hazard Areas section, 17.01.100 (enclosed)requires a Geotechnical Report in
accordance with subsection E. 5. for land modification, grading, clearing etc. in landslide
hazard areas with slopes greater than 40%. It appears from my brief site visit that the
proposal would meet these criteria and trigger the need for a Mason Environmental
Permit. Mason County would also be the lead agency for SEPA review.
I am enclosing the applications materials that I believe are necessary for the project. I
will contact you if there is any other information that will be needed. A SEPA
determination will be issued when all of the applications materials are completed and
reviewed.
Thank you for your time.
Sincerely,
Scott L g ecker, Senior Planner
Mason ty DCD
CC: Carol Serdar
Parcel file
MASON COUNTY Shelton (360) 427-9670
DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467
Planning Elma (360) 482-5269
Mason County Bldg. 1411 N.5th
P.O.Box 279 Shelton,WA 98584
September 15, 2003
Hama Hama Co.
Attn: David Robbins
301 N. Webb Road
Lilliwaup WA 98555
Re: Application for Reclamation Permit and SEPA review for proposed surface mine
expansion.
Dear Mr. Robbins,
We recently met on site to look at your proposed gravel mine expansion in Eldon WA.
Due to steep slopes on and near the site a Geotechnical Report will be needed to evaluate
slope stability, seismic and erosion issues. The Mason County Resource Ordinance
Landslide Hazard Areas section, 17.01.100 (enclosed)requires a Geotechnical Report in
accordance with subsection E. 5. for land modification, grading, clearing etc. in landslide
hazard areas with slopes greater than 40%. It appears from my brief site visit that the
proposal would meet these criteria and trigger the need for a Mason Environmental
Permit. Mason County would also be the lead agency for SEPA review.
I am enclosing the applications materials that I believe are necessary for the project. I
will contact you if there is any other information that will be needed. A SEPA
determination will be issued when all of the applications materials are completed and
reviewed.
Thank you for your time.
Sincerely,
Scott g ecker, Senior Planner
Mason ty DCD
CC: Carol Serdar
Parcel file
WASHINGTON STATE DEPARTMENTOF
D fU1HEBlAND
Natural Resources com, tS;nnpr
of P,f1,1;c 1.,,,,rs
10 July 2003
Dave Robbins
Hamma Hamma Company
301 N Lon Webb Rd
Lilliwaup, WA 98555
RE: EXPANSION APPLICATION FORMS FOR SURFACE MINE
RECLAMATION PERMIT#70-012163 (1 MAMMA MAMMA PIT")
Dear Mr. Robbins:
Attached are forms for your expansion of the Department of Natural Resources (DNR)
Surface Mine Reclamation Permit mentioned above located in a portion of Section 27,
Township 24 North, Range 3 West, W.M., Mason County, Washington.
Please begin as soon as possible with the County or Municipality Approval for Surface
Mining (SM-6). Once you have completed this form, take it to Mason County planner
Scott Longanecker. He will advise you on your next steps for SEPA review.
Then begin working on your maps and cross-sections (see SM-8A form for all items that
must be on the maps). When you have a handle on the size and depth of your site, you
will be able to better answer the questions on the SM-8A. A narrative will be needed to
discuss additional information that cannot fit on the SM-8A. The narrative should also
include a soil budget (calculations of the amount and how you will use the sub-soil and
topsoil to grow trees on the site post mining). If you have any questions, I will be happy
to assist. Or you may contact the permitting specialist, Matt Brookshier at (360) 902-
1470.
If you have any questions regarding the enclosed forms or about the letter, please contact
me in the Olympia Office at (360) 902-2133.
Sincerely,
Carol Serdar
Surface Mine Reclamation Specialist
a �' 1
1111 WASHINGTON ST SE 1 PO BOX 47000 1 OLYMPIA,WA 98504-7000
FAX:(360)902-1775 1 TTY:(360)902-1125 1 TEL:(360)902-1000
r`'"` Equal Opportunity/Affirmative Action Employer RECYCLED PnnFq
IL a2Ed £OOZ AInf SAIOI.LVjaf)aH,LNI9Wd0'IaAaG AJ Nf,
ZZ
ZZ
gi
LI s'
91
91 J J J J J J J J - J J J J J J J - - J J J J J J J J - J � JIci:
J
On AA ,A, � AAAA W WwwwclDw41 -10W0 � � MAP NO.
91 cn (T cn Uf to N �a OtO co 0)rncn WN � 0 CO CO Vrn � WN
O (O OD V W U� w
AAAAA A A A A A A AW w w9i .Ni �i �i �i�i {� �i �i �i �i {� �i � � � N , � � , � NNO000OONN WO O O O O O O O O O O O O N N [J A �j �j �p S p {a v t ,� � P A RCEL
9i cP cpcpcpcpppppP 2P `P `P " Q' wtncncncncncncncncn0000 � �'' o � � w � AWN -+ �► y+ QQ � NUMBER
N ' C� p OOOO � OOOOOOOOOOb �f) 966666L� boobobbo� � � C) 0CDC) o0 0 0 0 0 0 (R 0 0 0 0 0 0 0 0 O_ O O O N OO O O O O O O O O O O O p O6 ONOO W NN ODO VIN W V ON — ON0) W � A W � O0 coo 0000000 00000CD 01 C)6 � � � � � � � � � � � � Xx ;uX � � � � � � � � � � � X1 ;oDEVELOPMEtC C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C Cc AREA
� LnitC. CTAALng V V V V V V -4 0. V V ti � V Tw _ V oD torn Acn V jO A O OA A A A A A A A_ A A A_ A A t n t 7 W (� C n (71 V O O N N N 0 0 0 USE CODE
(O N N N N N N N N N N N - - -- -4 � f0 W 0 0 0 0 0 0 0 0 0 00 (n 0 0
8 to nn4� cnnv � -igQ;uEEXw �C8mm
� G)000)G� G� ,nG)G� ,n ,n0 ,n0 DpwpDw wrn mm
L mrrrrrrrrrrrrrmmmDDD �
Cn -n -nm -n -n -nmm -nmmm nZM 20 O � OOMOC C ;Ooocm
(, 00000nnnnnnnnn � � � � m v Or mfn Cm
� � � XXX � � 0 ; ;aWMmmx0v -iv � X � Cznc�D0000 = --40Ory � LAND USE
-icncnww0t�tocncncncntotoWcn n O —
L cn 00 = �0 �' D nmmODDCivv � ONv0;0
z � !� 0!*g� � � � � gowowcn < z g < Dm = c � � ovvDz -0C -� D
L mc�c� c�c�c�c�c�c� c�c� c� c� c� —t -+ mmm v � r � zChch ; SAD v� 9
c� rrrrrrrrrrrrrcncn r` 0 cn 0 � N pp r 0
9 z z
9 -I -I -I -1 -1 -i -I -I -i -1 - -1 -1 -i -I -I — Z Z — -1 Z Z � Z C� � �� � � � n � � � � 0 RURALZONI1'
9
S 1 W O N O N O W
� OO000000V � cnCo -4 °' — P 00 - A Total Acreage
O AN000 Cn � W N W Avg W � � OCL40000
S pO �l f'D C' C'
V N Ia K) IJ tJ tJ K) W t NO oO -4 CD tO Q) O C>
- - — — — — -+ OfOONNA � A ON Cn -40 O
S
m rr = R = mmOmmZO00D > 0
S � m CrrDrwg > v
T. T. mrx � m mmmvrcncn pcn � Dmma
mm Zr7C �� ,nQcncn � fnC -� -� z00siZ '-I K —
S On 000000000nn00DD = rmOd Wwr-0T00Mr- EM -< DZ = � O
-nCmmmm -nmmmmCCT -n � gpvcn � � DDc Z OOmrrm v D
� fn -1 -1 -1 -1 -1 - -1 -I -Icncn -l -lXc) mC) P. < � zz -� � DD �CC � Cn � D -1 �
D = DDDDDDDDD = 2DDnN � � Zp, 00C� — Rofnfn KKD
S (7 00000 � � n C� O K 0 -1 4 0 CD co � T m QD to C cn
KDXm — zr DDrao Kmm � mcnscnn
ODOOOOOOOOODDOOZ � � 2Dz ZZmmD � �1m � � c� � = m -40
S DnDDDDDDDDDnnDDr- C- - vD �� Dn�GAGD000� r D � r' m -� D
p 00 MZC/) � � ZKDZZQD9p --OMZTZ = 00 m
O9z zZ mm vmmmZD > 00K c
n � � 00 zr- 00Z { -ZCp 0D n
-+ rnnm � O
m 00 C r
00 99 X I � � 0Co
m m W
z < -zt � � � z
w
rn
Ip 9_ o
0 D 0
o
ma
f
AGUA TIERRA LAND AND WATER SERVICES,INC. (Agua Tierra)..... A DESIGN—BUILD FIRM Since 1993
Drainage Streams Slopes Rivers Wetlands Marine Shorelines Lakes Revegetation Erosion Control
19 June 2009
TO BE KEPT I N THE Adam James -•
Hama Hama Corporation
POBox250 PARCEL FILE
Lilliwaup, WA 98555 „'�
SUBJECT: Addendum to Geotechnical Report—Hama Hama Company Pole Barn(August 05—Rev)
Additions to Pole Building within Designated Landslide Hazard Area
Project Site Address: 301 North Webb Road, Lilliwaup, WA 98555
County/Parcel: Mason / 271 40&W
Prevailing Local Jurisdiction: Mason County
File Name/Path: \\Serverdownstair\storage(d)\AAA_AT_GLOBAL\AT PROJECTS\GEOTECH-MARINE\MASON\GEOTECHNICAL
REPORTS\HAMA\HAMMA-GR-POLE BARN SHED 090619.doc
Mr.James:
At your request Agua Tierra Land and Water Services, Inc(Agua Tierra)completed an assessment of potential landslide
hazards associated with the addition of two shed roof structures at each end of an approved/permitted pole barn.
The entire structure and the additions lie within 300 feet of a steep slope and is therefore subject to Mason County
landslide hazard area review requirements. A prior geotechnical report was prepared, submitted, and approved by the
County for the pole barn. The shed roof additions were completed subsequent to the original geotechnical report.
This current letter provides an evaluation of the shed roof additions for inclusion as an addendum to the original
geotechnical report. A summary of our findings is presented below. Our Engineer's site visit notes are attached below.
Also,we discussed this Addendum approach for the presentation of our findings with Mason County permitting staff. We
were advised that this Addendum would provide an efficient means for review of this relatively minor modification.
Our scope of work included a site inspection, a review of prior geotechnical report data, discussions with the client and
County staff, and preparation of this letter/report.
In summary, following our evaluation, we found that the subject additions to the pole barn do not adversely impact the
slope. Further,we provide the following statement per County ordinance(17.01.100, Section E.7):
...the hazards of the landslide area can be mitigated in such a manner as to prevent harm to property and public
health and safety. Further,the subject shed roof additions to the pole barn as constructed/observed on the day of
inspection are not expected to have any significant environmental impact.
We trust that County concerns will be addressed by this letter. Please feel free to contact me with any questions.
Sincerely,
f
C Fromuth, .Sc; C.E.
Project a ager
Attachments
Cc: Tammy Wright, Mason County Planning
\\Serverdownstair\storage(d)\AAA_AT_GLOBAL\AT PROJECTS\GEOTECH-MARINE\MASON\GEOTECHNICAL REPORTS\HAMA\HAMMA-GR-POLE BARN_SHED_090619.doc
506 EDISON STREET SE, SUITE 100, OLYMPIA, WA 98501
TEL:360.754.3755 FAX: 360.754.3431 EMAIL: CONTACT(a)AGUATIERRA.NET PAGE: 1
Engineering Notes
for Hama Hama Aquaculture
Lilliwaup,WA
Sept 15,2008
A shop/pole building was construction along side of an existing farm storage structure,the originally
design was a 42 by 32 enclosed structure with two bays. During construction it was decided to add a 14
foot lean-to on each end for equipment storage.
Visitation on the afternoon of September 15,2008:
1. The building site has been used for equipment storage for over 100 years. The natural terrain had a
low bench along the toe of the hill. Some time in the past some of the bench was removed to make a
level site. Behind the southwest corner the cut is a couple of feet while behind the southeast corner it
is not noticeable. However,the toe of the hill is not near the cut but 50 feet from the southwest corner
of the building and the lean-to. The toe is 25 feet from both the building's southeast corner and the
east lean-to's corner. Therefore the conditions,for the main structure are the same as the lean-to
additions.
2. It was suggested that the drain for the rain gutter on the back of the building be route to the front of
the building for discharge,where the ground slopes away from the structure at a greater rate. Also the
roof gutters for the lean-tos should be constructed to discharge away from the structure on the north
side.
4 t ifr.
1+,
hA
F-7 RFS: 7-7-Oq
09/05/2008 M 31 13608776942 HAMAHAMA PAGE 16/18
���+�ie0s'rllp�lll
9MB VIA 'd �►Avu r�1�1 A 1 I /� ww �° one • i
M8 8831A 'N LOC
...........��5-
as ��
n §
IN
L
LA weer W
3
{
c% `� 9
-r, ga
2L
143 7►
iA ecg :.JOROOLur
09/05/2008 10:31 13608776942 HAMAHAMA PAGE 17/18
i f+ rrrrar ��► � "r1O7�i �
SSS86 bM rdnvMmn ,.• 4
aVOa 13MM .N 102 �
SN1880a 3AVC
ibis T
r
fig
o � r
o � O
e J�
W W
O y�
(n G
' CD it
VLS:10 AO Ol unr
I
1
APPLICATION FOR
WASHINGTON STATE DEPARTMENTOF RECLAMATION PERMIT
'
Natural Resources
o- o► z i 6 3 (Form SM-8A)
YOU NEED A RECLAMATION PERMIT IF YOU: to have to modify their original plan before it is acceptable
to the Department.
ow' Have disturbed or plan to disturb more
- than three acres Suggestion: Contact the appropriate region office to arrange a
You must file a reclamation plan for mines in which meeting to discuss the mining proposal before you proceed with
three or more acres (including highwalls, pit floors,
the application. This will facilitate the application process for
both you and the State.
stockpiled areas, side-cast areas, and processing-plant
sites) will be or have been disturbed by mining. Note: This form is also available as a downloodable PDF file on
the Division website http://www.wa.gou/dnrlhtdocslgerlger.htmi.
w' Have a mine with working faces higher
than 30 feet and steeper than 450 Note: When signed by the applicant and approved by the De-
partment of Natural Resources, this document and the associ-
"` You must file a reclamation plan for mines with ated maps, cross sections, and other attachments will be the
working faces that are both higher than 30 feet and approved reclamation plan for this permit that the permit holder
steeper than 1 foot horizontal to 1 foot vertical (45% must follow for the mine site. Variation from the approved recla-
unless there is a pre-existing natural hazard in the mation plan may require that a new plan be submitted to the De-
area. partment for approval.
This form will help you by providing a checklist of the Infor- The answers to all questions should be typewritten or legibly
mation required.Even so,it is not uncommon for applicants handwritten in ink. Do not use pencil.
PLANNING FOR RECLAMATION
Reclamation of a site must meet or exceed the standards re- avoid unnecessary earth moving; and identifies equipment
quired by the Washington State Surface Mining Act (RCW needed.
78.44).The primary purpose of the Act is to insure that seg- The plan should provide a schedule for initiating recla-
mental reclamation occurs promptly and properly for all mation as soon as possible on parts of the site where surface
;permitted mines. Best Management Practices for Re- mining has been completed. Reclamation activities, to the
claiming Surface Mines in Washington and Oregon, Wash- extent feasible, should be conducted simultaneously with
ington Division of Geology and Earth Resources Open File surface mining,and,in any case,reclamation must be com-
Report 96-2,provides Information on what is needed to re- pleted on any segment within two years-of abandonment of
claim a site. Each requirement of the reclamation law may mining on that segment(except as provided for in a segmen-
not fit every mine.The law provides some latitude for vari- tal reclamation agreement).
ance.If you have a good reclamation idea or a unique oper- A reclamation plan should be simple,practical,and easy
ating problem, see the reclamation officer at your Depart- to implement. It should be flexible, taking Into account the
ment of Natural Resources Region office. potential for unanticipated changes in the geology and the
WHAT IS A RECLAMATION PLAN? market that will affect reclamation. The plan should have
provisions for quality reclamation, even if mining to deple-
A reclamation plan can be thought of as both a financial lion never occurs.
planning document and a contract that defines the topogra- The required maps,cross sections,and written narrative
phy,drainage,and vegetation of the site after reclamation is (RCW 78.44.091) are adequate documentation for most
complete.This plan describes the permit holder's strategy to mines. In some instances, separate reports, such as an ex-
and establishes an economic limit of production for each achieve acceptable reclamation at the lowest possible cost panded checklist, hydrogeologic evaluation, slope stability
site,based on the area available for mining and the grade of analysis,or environmental impact statement,may be neces-
the deposit.It also identifies and addresses mitigation of po- sary.
tential environmental impacts,such as gullying of imperme- The checklist below will help you be sure that nothing is
able clays,for which the permit holder is liable;establishes a forgotten. Neatness counts! If a plan is not neat and legible
segmental sequence of mining and reclamation that will and in ink, it will be rejected.
GENERAL INSTRUCTIONS
Check the appropriate boxes and fill in the blanks below. sheet,or write"See'attached report" in the blank and attach
Where required,explain In the space provided. If the ques- a report.Any unanswered questions may result in this form
tion does not apply to your mine,write in "NA" for"not ap- being returned to you unapproved. In addition to the appli-
plicable" to let us know you have read the question.if addi- cation, a written narrative that describes the details of the
tional space is needed,write"(Continued)"in the blank and mining and reclamation of the permit area may be attached.
restate the question and continue your answer on a separate
K
Application for Reclamation Permit(Form SM-8A) Revised 8/01 Page 1 of 14 Reclamation Permit/Application No.
APPLICATION FOR RECLAMATION PERMIT
Check appropriate box(es): O new permit O revision of existing permit O transfer of permit O expansion
NAME OF APPLICANT/PERMIT HOLDER(S) (Type or print In Ink) Are all of these mines now in compliance with RCW 78.44,
WAC 332-18,and conditions of the permits? O yes no
H R m A 1 i ll� I A Co , Have you ever had a surface mining operating
or reclamation permit revoked? O yes no
Have you ever had a reclamation security forfeited? O yes no
I MAILING ADDRESS ?C I (Jc�/� d If you answered yes to the above,give permit number(s)
.7
U I I
Type of mine: P pit O quarry
Material(s) to be mined: 0 sand and gravel ❑rock or stone O clay
Telephone 36 o b'77 J i1 it UBI no. 9t* 0 i-'��/% `� O metal 0 limestone ❑silica
NAME OF MINE O other
Deposit type: 0 glacial O river flood plain(alluvial)
0 river channel deposits O talus O bedrock O lode O unknown
Street address and milepost of surface mine O other
Total Acreage and Depth of Permit Area:
(Include all acreage to be disturbed by mining,setbacks,buffers,and
rill associated activities during the life of the mine.)(See SM-6.)
/ Total area disturbed will be %! acres.
Area to be disturbed in the next 36 months will be Yo- acres.
Maximum vertical depth below pre-mining topographic grade
Is 300 feet
Maximum depth of excavated mine floor is { lei feet
relative to mean sea level(msI)
Expected start
date of mining Estimated no.of years
Distance Direction from Nearest community Total quantity to be mined over life of mine Estimated annual production
i (miles) (estimated): S, /pr°-1'
M011— O tons,or A.e'JA O tons,or
!fi 0 cu yds �cu yds
Subsequent land use: O industrial '(agricultural,
COUNTY r 1 l a`o forestry b residential O wetlands and lakes
No attachments will be accepted.Legal description of permit area: O other
Reclaimed elevation of floor of mine f /e feet relative to mean sea level
1/4 1/4 Section Township Range
Reclaimed elevation is shown on cross sections yes Ono
Le"t Y 2"1 2 y K 3 ,f
Subsequent land use Is compatible with
county or municipal comprehensive plan? f yes ❑no
County or Municipality Approval for
Surface Mining(Form SM-6) attached? yes O no
SEPA checklist required? O yes O no
TOTAL ACREAGE OF PERMIT AREA APPLIED FOR If any answers are no,explain:
(Include all acreage to be disturbed by mining,setbacks,and buffers and
associated activities during the life of the mine.)
acres
Do you or any person,partnership,or corporation associated
with you now hold,or have you held,a surface mining
operating or reclamation permit? A yes 0 no
If you answered yes to the above,please list:
Permit Active Reclamation
number operation Curren t/compleit
Note:Approval of the reclamation plan and(or)Form SM-6 does not vest
16ryes) No Yesq' the subsequent land use.Subsequent use may be changed by the permit
J holder with the written approval of local government up until the time
reclamation is complete and the reclamation permit is terminated.Change of
subsequent use by the permit holder may require submission of revised Form
SM-6,plans,and a State Environmental Policy Act(SEPA)checklist.
Application fee for a new +
reclamation permit is herewith attached? ❑yes O no
Application for Reclamation Permit(Form SM-6A) Revised 6/01 Page 2 of 14 Reclamation Permit/Application No.
CHECKLIST OF RECLAMATION STANDARDS
SEGMENTAL RECLAMATION Volume of stored topsoil/subsoil is Atli cu yds
The permit holder must reclaim each segment of the mine within and will require N A acres for storage.
two years of completing mining on that segment and(or)in the Storage areas are shown on maps and have been marked on
manner described In this reclamation plan or a separate seg-
mental reclamation agreement. Segmental reclamation helps
establish self-sustaining vegetation, especially native pioneer Topsoil will be salvaged where possible? IV�
vegetation,and promotes stable slope conditions and improves If no, explain:
the water quality and appearance of the site:
_Lf -tnJ,fut'/ if
Permit area has been divided Into segments for mining e-fkv 1.1.4l P '1v of-4 `t st Ft
f�
and a mining schedule has been developed? �l yes Ono -- { �u �' oar
If no, explain and go to next section: 'I( )-k rh'µEJ Su-kFticJ "kec ,
Topsoil and overburden will be moved
to reclaim an adjacent depleted segment? 0 yes t] no
If no, explain: ro .6 t n e t
Permit area has been divided into segments
for reclamation and a reclamation schedule
has been developed? )id yes 0 no n o J'a..o ,04. / r
If no,explain:
Before materials are moved, vegetation will be cleared
and drainage planned for soil storage areas? j(yes ❑ no
If poT a 4airt: 1 F ►_ec e5 Sp-r
SITE PREPARATION
PERMIT AND DISTURBED AREA BOUNDARIES
The permit holder should delineate the permit boundaries and
maximum extent of disturbance and setbacks with clearly visible
4�ermanent boundary markers.The permit holder must maintain
the boundary markers until termination of the reclamation per- Soil storage areas will be stabilized with vegetation
mit. to prevent erosion If materials will be stored
Boundary of the permit area has been marked on for more than one season? ` es Vno
the ground with permanent boundary markers? )4 yes ❑no If no, explain:
Explain boundary marking plan:
JNef Lvct 5 7.c�421 w If, ore"�p S
SETBACKS AND SCREENS
SAVING TOPSOIL, SUBSOIL, AND Setbacks and screens help control erosion,provide seed sources
OVERBURDEN FOR RECLAMATION for reclamation,and protect adjacent land and resources.They
Prior to any surface mining operation in any segment, the per- should consist of native vegetation and (or) topography. The
mit holder shall carefully stockpile all available topsoil,subsoil, minimum setback for mines in consolidated materials permitted
and overburden in stable storage areas for use in later reclama- after June 30, 1993, Is 30 feet or as determined by the Depart-
tion or immediately move them to reclaim adjacent depleted ment. Setbacks are measured from-the permit boundary. Set-
segments.Topsoil and subsoil needed for reclamation may not backs are necessary to insure sufficient material for reclamation
be sold or given away or removed or mixed with sterile soils. and to protect adjacent land and resources.Setback for mines in
Topsoil and subsoil should not be used for screening berms re- unconsolidated materials permitted after June 30, 1993, must
quired by county or municipal government because this would be at least equal to the maximum anticipated height of the adja-
preciude Its timely use for reclamation. cent working face or as determined by the Department. (A set-
Thickness of topsoil isrx��"^u "!� feet back equal to the height of the working face will provide only
enough material for a 2 horizontal:I vertical slope.To meet the
Thickness of subsoil is feet standards of the law,slopes between 2:1 and 3:1 are necessary.)
Depth to bedrock is v`^k' • feet An exemption from this section may be granted by
I the Department following a written request that submits an
Total volume of topsoil is -c I"'W " cubic yards acceptable backfilling plan, geotechnical slope-stability study,
Total volume of subsoil is cubic yards proof of a dedicated source of fill materials,written approval of
Application for Reclamation Permit(Form SM-AA) Revised illot Page 3 of l4 Reclamation Permit/Appocation No.
contiguous landowners, and (or) other Information. Setbacks If the mine is In a river or stream channel or on the 100-year
and(or)buffers required by other agencies with jurisdiction may flood plain,you will need to complete "Additional Information
be used to satisfy these requirements with Departmental Requirements for Flood Plain Mines" provided by DNR. This
approval. information Is part of the application for a reclamation permit.
Retain your calculations of the setback to show that you have re- Copy of Shoreline Permit from Department of NA
tained adequate materials for reclamation and the protection of Ecology and/or local government attached? O yes O no
adjacent lands and resources. Hydraulic Project Approval from the Department NA '
Maximum depth of the mine will be feet of Fisheries and Wildlife is attached? ❑yes O no
from 3M0 feet to feet elevation. CONSERVATION BUFFERS
(highest) (lowest) (relative to mst)
In special cases, buffers may be necessary to protect unstable
The setback for this site will be Zd O feet wide. slopes,wildlife habitat,or other sensitive areas or to limit turbid
A permanent,undisturbed buffer Is water discharge from areas that will be disturbed.
planned for this site? ❑yes Id
no Conservation buffers are necessary for:
If no, explain: ❑unstable slopes O wildlife habitat
o O water quality O other
6'�- 6wc Sect( :,'1 7vr Cy...�.yat„ ,e.}s'-f-r Y•a,1 Explain: Itc C' lW'JJ
ott �rfi T r3n4&-r r'v-ao/ a h 2 Af
Tw
Setbacks are shown on map and have been marked on the
ground with permanent boundary markers? )0 yes O no
If no, explain: Conservation setbacks are shown on maps
and have been marked on the ground with. A
permanent boundary markers? O yes O no
HYDROLOGY
If mining is proposed on a flood plain or in a area where ground
Does this site have a backfill plan attached water resources may be Impacted, the mining plan should in-
that addresses the protection of adjacent clude a complete environmental analysis (RCW 78.44. 091) of
',property and how the final stable slopes the affected reaches of the river system or aquifers.
are to be achieved? Ayes ❑ no Ground Ground.Water
If no, explain: High water table depth is 6 feet 8 relative to
mean sea level,O below original surface, or O unknown.
Low water table depth is 0 feet Je relative to
mean sea level,O below original surface, or O unknown.
Annual fluctuation of water table is from feet
rtVC PgrGR r\EbVf.fttpD
on to feet on
BUFFERS TO PROTECT STREAMS (date) (date)
AND FLOOD PLAINS Direction of ground water flow: d- 'Fait for 1
C.'J .
Generally no mine may be located in or near a stream or on a Are well logs attached? O yes 6a no
100-year flood plain unless a Shoreline Permit has been issued. Is the aquifer perched? O yes Wno
(See Chapter 173-18, Washington Administrative Code[WAC],
for a partial list of streams under Shoreline Management Act ju- Is the shallowest aquifer: O confined 0 unconfined
risdiction.) Buffers from streams and flood plains should be at The site will be mined: O wet ®dry O both
least 200 feet wide. Wider buffers may be necessary to satisfy
designated critical area requirements under the Growth Man-
agement Act or for stream,slope,and flood plain stability and to 5;t 1) "-t(4 a-(!, .Q" l -P rj
prevent breaching of the pit at a later date.
A stream buffer of at least 200 feet has been marked on the
ground with permanent boundary markers? )4yes O no
A buffer of at least 200 feet from the 100-year
flood plain has been marked on the ground
with permanent boundary markers? M-yes O no
Explain: <ff- s(-f• k'�' The site is in a: NO
p —� — O critical aquifer recharge area O sole source aquifer
O wellhead protection area ❑special protection area
O public water supply watershed
O designated aquifer protection area Non?,
Application for Reclamation Permit(Form SM-8A) Revised 6/01 Page 4 of 14 Reclamation Permit/Application No.
If any of the above conditions apply, a ground water study Is If yes, give details; if no, explain:
necessary,and you will need to complete "Additional Informs
tion Requirements for Hydrologically Sensitive Areas"provided -
by DNR. This information is part of the application for a recta- k1f: 5,1"1 1-
mation permit. � 9 MA i s 5 4 �N
Ground water study attached? O yes O no i,,, (l t.,E tit f��
P �1 fl
If no, explain: �, #
-�r•,.�- o tT a �t.,..i ,
Subsoil will be replaced to an approximate depth of
feet on the pit floor and a depth of l
feet on slopes. Il(�
�t x s ern- 1 J
ARCHEOLOGY Topsoil will be replaced to an approximate depth of
Are archeological/cultural resource A feet on the pit floor and a depth of
sites resent? N Oyes no
p feet on slopes. A S If ss t E le
If no, go to next section, If yes, describe how you will protect
the resource: Topsoil will be distributed evenly over the site? X yes O no
If no, explain:
If-topsoil is in short supply,it will be strategically placed
In depressions and low areas In adequate thickness to
MINING PRACTICES TO conserve moisture and promote revegetation? 'yes O no
FACILITATE RECLAMATION If no, explain:
SOIL REPLACEMENT '
;-Soil replacement is critical to reclamation.Without soil,vegeta-
tion cannot be established. In Washington, topsoil is defined in
the reclamation law (RCW 78.44) as the "naturally occurring
upper part of a soil profile,including the soil horizon that is rich Topsoil will be moved when conditions are not
In humus and capable of supporting vegetation, together with overly wet or dry? yes ❑no
other sediments within four vertical feet of the ground surface."
The upper part of the soil profile should be stored and replaced If no, explain:
separately from the lower subsoils or sediments.
Topsoil will be saved? N A ❑yes O no
If no, explain and go to next section:
grvLd no�{ps01'l ,prefeNC
Topsoil will be imported? ❑yes . Ono
Explain• Sl.o�(I-A <c hcccSS-%]
Up to 4 feet of topsoil and (or) subsoil
will be restored? ❑yes O no
If no, explain: Synthetic topsoil made from compost,biosolids, or
other amendments will be used and (or) made
on site to supplement existing topsoil? O yes 11 no
If yes, explain:
Topsoil will be restored and seedbeds prepared
as necessary to promote effective revegetation
and to stabilize slopes and mine floor? ❑yes ❑no Materials,such as till, loess, and (or) silt, are
AAA available on site that could be used to supplement
topsoil for reclamation? yes ❑no
Application for Reclamation Permit(Form SM•8A) Revised 6/01 Page 5 of 14 Reclamation Permit/Apprication No.
If yes,explain: Topsoil salvage and replacement
SC✓f(E Yl1Ke 5 -F�-- ,. 1 Q. 1 --�r p S.e t'i plan Included? Dyes 0 no
If no, explain: -
Silt from settling ponds or a filter press will
be used for reclamation? P(yes 0 no REMOVAL OF VEGETATION
Explain: i f d'')5,61- In a well-planned operation,vegetation is removed from areas
to be mined only as needed and is preserved when possible to
screen the site and limit erosion that may result in turbid water
discharge.
Vegetation will be removed sequentially from areas
to be mined to prevent unnecessary erosion? Byes 0 no
Settling pond clay slurries will be pumped or If no, explain and go to next section: / \
hauled to other segments for reclamation? 0 yes 0 no
Explain j l.+a e_� •�. ,-tf_ ,. .!S ,
a
Small trees and other transplantable vegetation
Topsoil will be replaced with equipment that will will be salvaged for use in revegetating —/
minimize compaction, or it will be plowed,disked, other segments? ❑yesno
or ripped following placement? ) yes 0 no If yes, give details; if no, explain:
If no, explain: Aogle f-if ,n o.A. f�_
_0oo
la.a,
Topsoil will be immediately stabilized with Wood and other compatible debris should not be,buried; It
grasses and legumes to prevent loss by should be recycled or chipped for mulch. It wood and other
erosion,slumping, or crusting? yes ❑no compatible debris will be buried, solid-waste disposal and
If no,explain: land-use permits must be obtained.
Wood and other organic debris will be:
❑ recycled removed 0 chipped O burned
❑ buried used to synthesize topsoil or mulch
❑ other (explain)
Topsoil stockpile areas are shown on maps and
will be marked on the ground with permanent
boundary markers to protect from loss? ,Q yes 0 no
If no, explain: i f ,-�Tr`r r,•�-9 r
Solid-waste disposal, burning, and
land-use permits are attached? ❑yes 0 no
Some coarse wood (logs, stumps) and other large
debris will be salvaged and used for
fish and wildlife habitats? yes ❑no
Segmental topsoil removal and replacement If yes, give details; if no, explain:
Is shown on maps? 0 yes 0 no
If no,explain: f�
S v��+� s f�Ma'1 r�t,� ��rf1 ►nab ��- ,P�f1,�1
UK t«,.t )11. f, rc ftl
Application for Reclamation Permit(Form SM•6A) Revised 6101 Page 6 of 14 Reclamation Permit/Application No.
EROSION CONTROL FOR RECLAMATION Water-control measures will be
Erosion control measures are generally necessary during mining established to prevent erosion of
end reclamation to avoid severe erosion or loss of topsoil.Each setbacks and neighboring properties? yes 0 no
site must be evaluated on an individual basis. Multiple If yes,give details; if no, explain:
techniques may be necessary.Note:The Department of Ecology a 5 he t a(1'
requires discharge permits for most surface mines. In addition,
some mines at higher elevations should plan for the effects of a-CS ram''' tl f f if
rain-on-snow events on slope stability and erosion. Implemen- ;5 -� �i ;l� vk.� rh-�L. •mot ,A
tation of BMPs as described in Best Management Practices for
Reclaiming Surface Mines in Washington and Oregon (OFR
96-2)can minimize or eliminate erosion and soil loss during rec-
lamation. Storm-water conveyance ditches and channels
will be lined with vegetation or riprap? ayes 0 no
Pit floor will slope at gentle angles toward highwall,
sediment retention pond, or proper drainage? 00 yes 0 no if yes, give details; if no, explain:
If yes,give details; if no,explain:
Z
Natural and other drainage channels will be
kept free of equipment,wastes,stockpiles,
and overburden? Q'yes 0 no
Revegetation,sheeting,and (or) matting will be use If no, explain:
to protect areas susceptible to erosion? yes )RAfto
If yes, give details; If no, explain:
�h.tSe Orri�i,f 6LY1- not" S�scr�,t;bl¢ 'ie er�Ti.;ti.
RECLAMATION TOPOGRAPHY
The goal of reclamation is to create stable, usable land. New
drainages should be established, and contours should blend
' with adjacent offsite topography.To promote slope stability and
* Water-control systems used for erosion control revegetation,slopes should generally vary between 2 and 3 feet
during segmental reclamation will: horizontal to 1 foot vertical or flatter.Slopes steeper than 2 feet
Divert clean water around the pit? V yes 0 no horizontal to 1 foot vertical are not acceptable for pits except in
Trap sediment-laden runoff before limited areas to tie into offsite topography.The reclaimed mine
It enters a stream? J4 yes ❑no site should appear natural—that is, slopes should be sinuous
and right-angle corners should be eliminated by rounding.Sinu-
Result in essentially natural conditions ous slopes can be formed either by mining to the prescribed an-
of volume,velocity, and turbidity? yes 0 no gles, which is generally more cost effective, or by using the
Handle a 25-year, 24-hour peak event? fiQ yes ❑no cut-and-fill method. Backfilling is not allowed unless prior ap-
(Have you attached calculation?) ❑yes ',0 no proval is obtained from DN_R and copies of any other necessary
permits are submitted.
Be removed or reclaimed? yes )91--no
If any answers are no, explain: FINAL SLOPES
g'r,^'J LU( r, swts w+ter Final slopes will be created using the
cut-and-fill method? / �j yes 0 no
Explain: pit
i -F/oo, It It kel A_J
l �p /( ,Ffr 101 Iokf as A�.%kc't &Ire., w fl /o�C -f�. Ntyt r- fIQ1
Slopes will be created by mining to the
Will any water control systems will be removed final slope using the cut method? 0 yes 0 no
upon final reclamation? yes no Explain. Nk�
If yes,explain:
Application for Reclamation Permit(Form SM-BA) Re•ised 6101 Page 7 of 14 Reclamation Permil/Application No.
Slopes will vary in steepness? -J4 yes 0 no Slope stability analysis required? 0 yes Rf no
If no,explain: if the answer is yes,you will need to complete"Additional Infor-
mation Requirements for Mines with Potentially Unstable or
Steep Slopes" provided by DNR.This information is part of the
application for a reclamation permit.
Analysis provided by
(name of Jirm)
Slope Requirements for Quarries
Slopes will have a sinuous appearance in � and Hardrock Metal Mines
�P
both profile and plan view? yes 0 no
If no, explain: If the mine is a pit,go to the next section.
For consolidated rock, such as basalt, andesite, granite, lime-
stone, or quartzite, a vertical highwall face may be acceptable.
In all cases, slopes must be stable.Where a severely hazardous
condition is created by mining and that condition is not Indige-
nous to the area,the slopes shall not exceed 2 feet horizontal to
1 foot vertical. Check appropriate boxes below.
Large rectilinear(that is, right angle, or straight, ❑ Slopes should not exceed 2 feet horizontal to
planar) areas will be eliminated? yes O no 1 foot vertical.
If no,explain: a 5 no}S it�C ❑ Slopes steeper than 1 foot horizontal to 1 foot
vertical are an acceptable subsequent
land use as confirmed on Form SM-6.
❑ Hazardous slopes-or cliffs are Indigenous to the
immediate area and already present a potential
threat to human life. Photo and maps attached to
Where reasonable, tracks of the final equipment pass document presence of cliffs.
will be preserved and oriented to trap moisture, ❑ Geologic or topographic characteristics of the
soil, and seeds and to Inhibit erosion? l yes ❑ no site preclude slopes being reclaimed at a flatter
If no, explain: angle and are an acceptable subsequent
land use as confirmed on Form SM-6.
Slope stability analysis required? 0 yes 0 no
�r If the answer is yes,you will need to complete"Additional Infor
mation Requirements for Mines with Potentially Unstable or
rburden/ Steep Slopes" provided by DNR.This information is part of the
Slope Requirements for Pits and Ove
Waste Rock Dumps (non-saleable products) application for a reclamation permit.
If the mine is a quarry or in hard rock, skip to quarry section. Analysis provided by
(name of firm)
For unconsolidated material(such as sand and gravel pits,waste Measures will be taken to limit access to the top
rock dumps, etc.),final slopes must meet the following require- and bottom of hazardous slopes? 0 yes ❑no
ments:
Explain:
Slopes will vary between 2 and 3 feet horizontal
to 1 foot vertical or flatter, except in limited areas
where steeper slopes are necessary to create
sinuous topography and control drainage? yes O no
If no, explain:
I Selective blasting will be used to remove benches and
walls and to create chutes, buttresses, spurs, scree slopes,
and rough cliff faces that appear natural? Dyes Ono.
Explain:
For pits, slopes will not exceed 2 feet horizontal to
1 foot vertical except as necessary to blend with
adjacent natural slopes? yes ❑ no
Give details:
I101:ftf�'3 f
f`QPS f Reclamation blasting will be used to reduce the entire
highwall to a scree or rubble slope less than
2 feet horizontal to 1 foot vertical? O yes 0 no
If yes, is blasting plan attached? ❑yes ❑no
Application for Reclamation Permit(Form SM•BA) Rwised 6101 Page 8 of 14
Reclamation PermittApptication No.
If no,explain: Areas to be backfilled are shown on maps? O yes O no
If no,explain:
Access to benches will be maintained
for reclamation blasting? O yes O no All grading/backfilling will be done with clean,
If no,explain: inert, nonorganic solids? Dyes O no
If yes, give details;if no, explain:
Small portions of benches will be left to provide habitat
for raptors and other cliff-dwelling birds? ❑yes O no
BACKFILLING Backfilled slopes will be compacted? ❑yes O no
If backfilling is proposed,it is necessary to give the source of the If yes,give details; if no, explain:
backfill material, quantity needed, grading and compaction
scheme,erosion control plan,and immediate vegetation plan.if
backfill is to be brought from off site,copies of all.permits from
local government will be necessary.
Slopes will require backfilling? O yes no
If no, go to next section. If yes, continue. Will you be backfilling into water? ❑yes O no
Depth of backfilling is feet. If yes, is slope stability analysis attached? O yes O no
Slope stability compaction analysis required? O yes ❑no If yes, discuss method:
Analysis provided by
(name of firm)
Backfilling plan and (or) permits are attached? ❑yes O no
jf no backfilling plan attached, explain:
MINE FLOORS
Flat areas will be formed into rolling mounds? ❑yes !a no
If yes, give details; if no, explain:
Backfilling will be done with overburden piare h k'h a �o� c z`>c s/X E
material not topsoil? ❑yes O no U �
If no,what is the source of the material?
Mine floor will be gently graded into sinuous
drainage channels to preclude sheetwash
erosion during intense precipitation? ` yes ❑ no
Locations of stockpiles are shown on maps If yes, give details; if no, explain:
and will be marked on the ground with KQ y j y -. 0-UO w A C[VM V I-:t f_
permanent boundary markers? O yes O no
Explain method of placement of fill: ;t r�crtcs
Mine floor and other compacted areas
will be bulldozed, plowed, ripped, or
blasted to foster revegetation? yes Clno
Will backfill be imported? O yes ❑ no If yes, give details; if no, explain:
If yes,give volumes needed to meet reclamation grades:
t--t ;5 ,L f l:t-t
Application for Reclamation Permit(Form SM-8A) Revised 8/01 Page 9 of 14 Reclamation Permit/Application No.
s,
LAKES, PONDS, AND WETLANDS Spillways and outfalls will be protected
If surface mining results in the formation of a swamp, pond,*or (for example, rock armor) to
lake useful for recreation,wildlife habitat,water quality control, prevent failure and erosion? ❑yes O no
or other beneficial wetland purposes,the site must be reclaimed If any answers are no, explain:
In the following manner:
Water is present in the permit area? O yes no
1f no,go to next section.
Reclaimed areas below the permanent low water table
In soil, sand,gravel,and other unconsolidated material
' will have a slope no steeper than 1.5 feet
° horizontal to 1 foot vertical? ❑yes O no Proper measures will be taken to prevent seepage from water
impoundments that could cause flooding outside the
If yes, give details; if no, explain: permitted area or adversely affect the stability of
Impoundment dams or adjacent slopes? O yes O no
If yes, give details; If no, explain:
If not already present,soils, silts, and clay-bearing
material will be placed below water level to
enhancerevegetation? O yes ❑no
If yes,give details; if no,explain:
Written approval from other agencies with the jurisdiction to
regulate impoundment of water is attached? ❑yes O no
If no, explain:
Some parts of pond and lake banks will be shaped
so that a person can escape from the water? ❑yes ❑ no
If yes, give details; if no, explain:
FINAL DRAINAGE CONFIGURATION
*' Reconstructed drainages must be graded and contain enough
energy-�dissipation devices so that essentially natural conditions
Armored spillways or other measures to prevent undesirable of water velocity, volume, and turbidity.are re-established
overflow or seepage will be provided to stabilize within'six months of reclamation of each mine segment. Drain-
bodies of water and adjacent slopes? O yes ❑no age design may require that runoff volumes be calculated for
If yes, give details; if no, explain: unvegetated conditions.
Drainages will be capable of carrying the peak flow
of the 25-year, 24-hour precipitation event?
(Data are available at DNR region offices.) 'Al yes O no
If yes, calculations attached? O yes O no
If yes, give details; if no, explain:
Wildlife habitat will be developed, incorporating such Z >,y I "` I"'" i�{
measures as: ' )�� �rK (,,,,,t.. nLS�=vtl sto-rw. WJef
Sinuous and irregular shorelines? ❑yes ❑ no t v k z(( 11 ,- �� .f t� o-rtt*_S
Varied water depths? ❑yes 0 no
Shallow areas less than 18 inches deep? ❑yes 0 no
Islands and peninsulas? 0 yes 0 no Drainages will be constructed on each reclaimed
Give details: segment to control surface water, erosion,
and siltation? M yes O no
Clean runoff is directed to a safe outlet? yes O no
If either yes, give details; if no, explain:
Ile
Ponds or basins will:
Be located in stable areas? ❑yes O no
Have sufficient volume for expected runoff? ❑yes 0 no These are shown on maps? yes O no
Have an emergency overflow spillway? O yes 0 no
Application for Reclamation Permit(Form SM-SA) Revised 6/01 Page 10 of 14 Reclamation Permit/Application No.
The grade of ditches and channels will be REVEGETATION
constructed to limit erosion and siltation? yes ❑no.
The revegetation plan should show how, when, where, and
If yes,give details; if no, explain: what vegetation will be planted. A thorough and detailed plan
(OPL-S increases the chances that plants are well established when rec-
V lamation is finished. It is best to do test and demonstration
plantings early and to monitor the results so that appropriate
changes can be made before mining ceases.
The mine site is in: O eastern Washington
$western Washington
Natural-appearing drainage channels will be The mine site is: O wet J4 dry
established upon reclamation? yes O no 11
If yes, glue details; if no,explain: The average precipitation is 10 per year.
� Revegetation will start during the first proper
�5 nYe�I e
growing season (fall for grasses and legumes,
fall or late winter for trees and shrubs)
following restoration of slopes? ,ti]yes ❑no
If yes, give details; if no, explain:
SITE CLEANUP AND
PREPARATION FOR REVEGETATION t% yen - MJ ro^f (a re —
-�trt't 1 f ci.w �l.•rk.o� U.I•�o�t I,►� F�j
DEALING WITH HAZARDOUS MATERIALS �--
If surface mining will expose hazardous natural materials, such f`rx t ° rr" 4¢
as acid-forming coals and metalliferous rock or soil, the permit
holder must attach a plan to handle such materials.All grading
and backfilling to cover the hazardous materials must be made
with non-noxious, noncombustible, and relatively Test plots will be used to determine
incompactible solids unless the permit holder provides written optimum vegetation plans? 0 yes O no
approval from all appropriate solid waste regulatory agencies.
Other methods may also be acceptable. The site will not be revegetated because:
Hazardous materials are present ❑ It is a rural area with a rainfall exceeding 30 inches
at the mine site? ❑yes Ano annually and erosion will not be a problem
(requires approval of DNR Region office.)
if no, go to next section. ❑ Demonstration plots and areas will be used to show
The final ground surface drains away that active revegetation is not necessary.
from any hazardous natural materials? ❑yes ❑ no '
❑ Revegetation is inappropriate for the approved
If yes, give details; if no, explain: s subsequent use of this surface mine
Explain:
Plan for handling hazardous mineral wastes
Indigenous to the site is attached? ❑yes ❑ no
If no,written approval from all appropriate - Documentation is attached? O yes O no
solid waste regulatory agencies attached? ❑yes ❑no
RECOMMENDED PIONEER SPECIES
REMOVAL OF DEBRIS Segmental reclamation allows plant communities to develop ac-
All debris (garbage, 'bone piles', treated wood, cording to ecological succession stages.A combination of natu-
old mining equipment, etc.)will be ral reseeding and intentional planting is the most effective
removed from the site? yes O no means of establishing diverse and prosperous pioneer vegeta-
tion. Revegetation with grass and legumes should occur during
All sheds,scale houses, and other the first appropriate season after slope shaping and replacement
structures will be removed from the site? yes ❑ no of topsoil.Establishing widespread healthy vegetation generally
If either answer is yes, give details; if no explain: takes several seasons.Follow-up evaluations may be necessary
to monitor progress and to determine why plants did not thrive.
In eastern Washington, continuous ground cover may not
T�at w� Jd ale I c��a.,Fd "�f' be achievable because of arid conditions or sparse topsoil.
t re �'�re){ ; However, revegetation shall be as continuous as reasonably
possible.
The sections below give suggestions for species most likely
to survive in different types of climate. Check the species that
will be planted at your mine site.
Application for Reclamation Permit(Form SM-SA) Revised 6101 Page 11 of 14 ReclamaUon Permit/Application No.