HomeMy WebLinkAboutBLD96-0604 Final Garage with Upper Storage - BLD Permit / Conditions - 5/21/1996 .. •� � � why � � Y � _., � �
27
akR n
00 O
:✓ R ° (a O
., .. a 01 C
- C
' ;< OD Q
Vll
seat
ti
i
CONCRETE MECHANICAL
Footings-Setback MOBILE HOME
date - date by Ribbons
Z—`7 by 1 Gas Piping date Foundation Walls b
date date by Set Up
by INSULATION date BG/SLAB Insulation by
date by Floors Final
FRAMING date by date by
date by Walls FIRE DEPT.
PLUMBING date by date by
Groundwork Attic OTHER
date by date
by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date C, 2 by L
o date by
U fl
;,
„L"
W O 7O 1
3 p. �
10Q
000
ccyl
OD
^ C., s.
4
I
o n C
� O O00
I
r _ cn,
0 Q O
f cnN Z
O
10 OD CYI
00
n
�,:p -t,
1
i
1
Permit No.
MASON COUNTY �4e\ �O a
BUILDING PERMIT APPLICATION D
426 W. Cedar/P.O. Bpx 186, Shelton, WA 98584 427-9670/1-800-562-5628
PLEASE PRINT
#1 NOW4r /VR -q le-S 1191 e&1i e JJ-- 5/v7Z2 Phone# -?/�O 7 c' y0��
to Address milt �t A/ APie �`Oo cy �c a- T- Fire District# %�.
City >' d- St w a Zip 99 .29
Directions to Job Site 1-c a v P a sk ai-e �e�� Tv 2c �;'��r
e2-t 120Dd �Qeeed � .3 tii,"� e2w S,;71,d ��ll yak
fl; 6=1 - a.-1- VO'gie cad 004-,P-7 '>.S Zc S as��v ��► i?�' k7-
Owner Mailing Address 8 zl X t<-,-z 3
City delZ giF h St b4-,07 Zip 'VSD a
Lien/Title Holder 4,1 o� �e—
Address
Clty St Zip
#2 Contractor Name 50?*r e 2,5' Who V 'e— Contractor Reg#
Address Expiration Date
City St Zip Phone#
#3 If septic is located on project site, include records.
Connect to Septic? Public Water Supply Well
Connect to Sewer System? Name of System
(If residential, proof of potable water is required)
#4 AParc I 4 - - ,Oo 2 3
II Des ion r 1 �h
_ �. rl-D o SurV� ►olgr, / T�� a�
#5 Building Square Footage: (existing/proposed)
1st FI / 2nd FI / 3rd FI / Loft /
Basement / Deck / #bedrooms / #bathrooms /
Garage /571, Carport / (Circle:Attached or Detached?)
Others-1e r &I r-a c,e- sq. ft. / 1�&
#6 Use of building Xa® 0 # ��Describe work
#7 Type of Job: New !Z Add Alt Repair Other
#8 MOBILE/MANUFACTURED HOME INFORMATION
Model Ye Make Model
Length Width Serial No.
#Bedrooms # Bathrooms Type of Heat
Purchase Price $
#9 Indicate by circling the applicable source if any water is on or adjacent to su ' erty:
River Pond Creek Stream EaDndLake Marsh Saltwater easonal Runoff Other
Show following on the site plan
Lot Dimensions Flood Zones
Existing Structures Fences
Structure Setbacks Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed Improvements Easements y N, S, E, Wi Di i Indcate Directional b
Name of Flanking Street )
Name of Fronting Street in relation to plot plan
APPLICANT TO DRAW SITE PLAN BELOW —
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
r
HjpNS 0;2- tLi
0 LV cj
TO
Nam
Plumbing Fixtures ($3 eachj Fe Mechanical Fixtures ($6 each)
No._Toilets C RCLE FUEL TYPE: Gas, Electric,
_Bath Basins He ump, Other
_B h Tubs No. Units Fees
Sho ers � rn BTU
_Hot W er Htr Hepumps
_Laundry asher Vent�ystems
_Sinks Spot Ve?t Fans
_Floor Drains No. Boilers/CoWpressors
Laundry Basins _ �; HP
_Dishwasher No. Air Handling
r
_Disposal _ cfm#
Urinals No. Fire Protection Svstms
_Other _ Auto. Fire Alarm Sys 50.00
Fixed Fire Supp. Sys 50.00
Permit Basic Fee 115.0'0,, Auto Fire Sprink Sys 25.00
TOTAL PLUMBING $ No. Other
Gas Outlets
Wood, Gas, Pellet Stove
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF
WORK OR CONSTRUCTION AUTHORIZED IS NOT COM-
MENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR Permit Basic Fee 15.00
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD
OF 180 DAYS AT ANY TIME AFTER WORK IS COM- TOTAL MECHANICAL $
MENCED. PROOF OF CONTINUATION OF WORK IS BY
MEANS OF A PROGRESS INSPECTION.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED
MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I
RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU-
ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED
MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE
CONFORMANCE THEREWITH.NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT
MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING
THE BUILDING DEPARTMENT. DEPARTMENT.
X OWNER p // X BY
DATE DATE
FOR C7FI=[C(AL IJSE ONLY AcceptU ksV Date '�
DEPARTMENTAL REVIEW
FOR OFFICE USE ONLY
Approved Cond. Hold
Approval
Planning: W 01414D 0,45/rg C&0V46W &JfLDIL46 Ar
Environmental Health: r:�Y �Q
S),:
Building Plan Review
Occupancy Group: Type of Const: y"R
Fire Marshal:
Other:
' Special Conditions: FEES
Building Permit
Plan Check S ��
Plumbing Fee
Mechanical Fee
Wood/Gas/Pellet Stove
Radon Monitor
Viola' e
Site Inspection
Building State Fee ""p
Other
Other
[Building Valuation: , � TOTAL FEE
fg -�rc..���.f�
r
BUILDING PERMIT �$
q�; moo - _ .
DATE � Z q
Planner Area
CHECKLIST FOR PROPOSED CONSTRUCTION
Yes No ��._..-
( .g ( I Within 200 FT of designated shoreline, wetland, or
associated wetland
Where? T L.A ' U 0 C
/&1/? l2
[ 7 [ 7 Proposed construction on/over/in wetland
t ] ( Proposed construction within floodplain
[ ] I Eagle nest
State road access needed
[ 7 [ 7 Commercial Development (parking standards,ordinance, public works review, other sign
'
agencies) applicable( I [ 7 Mobile Home or RV Park
[ I [ 7 Exempt from building permit application
[ I ( 7 Exempt from SEPA process (WAC 197-11-305, WAC 197-11-800)
[ 7 [ 7 Meets all requirements (which section(s) of SMP does
proposed construction pertain to?)
[ 7 [ 7 Variance or Conditional Use Permit required
[ 7 [ ] Exempt from Shoreline Substantial Development Permit
process (Wac 173-14-040)
[ [ ] Exempt from Substantial Development, but within Army
Corp_ jurisdiction (WAC 173 -14-115)
[ J [ ) Address needed
3o' Z,*semewr hi-
jt
Ll vs V-
ila
-too
1,07- ;7,
rA D
/3,_YL
30
Page No. 1 CASE HISTORY FOR CASE NO.: BLD96-0604
ARNIE SLOTTO
07/10/96 NE90 MAPLE WOOD CT 'BELFAIR
Action Description q /
Re / Schd End/ Action Notes Code Sent Done Done Disp By Update Upd
------- ------------------------------
------------------ ---- --- Date By-------- ---
BLDA010 Application received / / / / 05/22/96
BLDA100 Approved For Issuance / / / / 06/24/96 05/22/96 KW
DONE CPH 06/24/96 CPH
BLDA500 (F) Issue buildin g permit / / 06/24/96 Sent to belfair for CPH
BLDB110 Structural Plan Review pick-up, DONE CPH 06/24/96 CPH
OS/30/96 / / 06/19/96
BLDB130 PlanningReview DONE CO 06/21/96 TLG
O5/22/96 / / 05/30/96 DONE HRF O5/30/96 HRF
BLDB134 RLC Checklist Review / / / / 05/30/96 There are emergent and forested wetlands DONE HRF O5/30/96 HRF
adjacent to property. prposed building
BLDH135 Addressing / / O5/23/96 will meet required setbacks.
BLDB200 Environmental Health Review O5/22/96 / / 05/22/96 DONE GMM 05/23/96 GMM
garage with out plumbing. JT DONE JWT 05/22/96 JWT
BLDC110 Footing inspection 07/01/96 07/02/96 07/02/96
BLDC115 Foundation wall inspection 07/O8/96 07/09/96 07/09/96 Conditional a DONE LW 07/03/96 LAW
pproval: COND LW 07/10/96 LAW
1. The last horizontal rebar is required
within 7 inches of the top of the forms,
add where needed.
2. In the side where the main garage
door is a minimum foundation hieght of
18 inches over all is required, add a 12
inch high wall wal minimum with vert.
rebar and horizontal. ok to fix take
photos and pour.