HomeMy WebLinkAboutRequest for Variance, Stormwater Facility Inspect and Prop Spot Reality Expansion for BLD95-00861 - VAR Letters / Memos - 12/19/1983 MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Courthouse Annex 2 N. Fourth & W. Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 426-SS93 Director - Ken Stevens
building environmental health maintenance parks&recreation planning sewer&water
December 19, 1983
Board of County Commissioners
Mason County Courthouse
P. 0. Box 400
Shelton, Washington 98584
Commissioners:
Mr. Robert A. Soltis has requested a variance from Mason
County's Parking Ordinance No. 815 in regard to a new office
building complex he wishes to build in Belfair, Washington, Mason
County. This office building will house a real estate business
and including Mr . Soltis , five persons will work in and out of
this building dealing in the -field of real estate.,
The structure is designed including fifteen parking spaces ,
but our ordinance requires twenty two (22) . If this building were
a retail store our parking ordinance would only require nine (9)
parking spaces. Our parking ordinance should be re-written.
I recommend the commission grant this variance.
Respectfully,
Ken Stevens
Director
KS/bc
MASON COUNTY
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton, Washington 98584
August 16, 1995
INTER-DEPARTMENTAL COMMUNICATIONS DATE
TO: ALLAN BORDEN, DCD - Planner
FROM: ALAN A. TAHJA, P/W - Hydraulic Engineer
SUBJ: BLD 95-0861 Proposed Spot Realty Expansion
James Zimney has submitted a small parcel detention system design for the
proposed expansion of Bob Dick's Belfair Spot Realty office. Without disputing
the ability of the site to infiltrate the runoff from the parking area of the
expansion as required in Mason County's Parking Ordinance, Public Works
considers the runoff rate proposed from the detention facility sized in the
submitted plan to be acceptable, and the proposed plan acceptable under Mason
County Parking Ordinance requirements.
I briefly discussed the submitted plan with Mr. Dick this morning, and
suggested the plan could be improved if the upper catch basin in the detention
mechanism were fitted with a grate and a portion of the parking area graded to
drain towards it.
Enclosed please find two copies of the site plan indicating the location of
the detention facility and two copies of the worksheet indicating the design
components. The materials for construction are not specified, and either
plastic or metal pipes and catch basins would normally be acceptable for
construction of the detention pipe and catch basin structures, but because the
catch basins appear to be sited in areas subject to traffic, corrugated metal
pipes should be required, or the basins should be sited in locations not
susceptible to traffic.
During construction, flow delivery paths should be intercepted with either
silt fences, hay bales, sand bags, or other temporary erosion control features
to ensure that neighboring properties are not adversely impacted. The PSWQA
guidance requires these be implemented prior to commencement of construction.
I am also enclosing the small parcel drainage system standards if you are
curious how the pipe diameter, length and orifice size were determined.
Si rely
r
Ya
ALAN A. TAHJA
File: H:\WP\STRMWTR\REVIEWS.IDC\SPOT-2.IDC
MASON COUNTY '
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton. Washington 98584
August 16, 1995
INTER-DEPARTMENTAL COMMUNICATIONS DATE
TO: ALLAN BORDEN, DCD - Planner
FROM: ALAN A. TAHJA, P/W - Hydraulic Engineer
SUBJ: BLD 95-0861 Stormwater Facility Inspection for Spot Realty Expansion
Allan,
On Monday March 25th, 1996 I received a call from Butch of Butch's Excavating
requesting an inspection of the stormwater detention facilities constructed to
accommodate the expansion of the Spot Realty building in Belfair, Washington.
I met with Butch onsite, and found the constructed facilities to be in
conformance with the approved design.
The Puget Sound Water Quality Authority requires Mason County to develop an
operation and maintenance program to cover all stormwater facilities (private
and public) constructed within their jurisdiction. To meet this requirement,
Public Works is requiring the execution of an Operation and Maintenance
Covenant covering stormwater facilities approved by it.
Attached please find a copy of an operation and maintenance covenant that has
been reviewed and approved by the County's Prosecuting Attorney's office to
meet this requirement. The proponent should complete the form, notarize the
instrument, record the completed form with the County Auditor's office, and
deliver a copy of the recorded covenant to Public Works prior to final
approval by the County building permit.
Si cerely,
D
A AN A. TAHJA
cc: Mike Byrne - General Services/Building Department
File: H:\WP\STRMWTR\REVIEWS\SPOT-INS.IDC
MASON COUNTY
PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER
Shelton, Washington 98584
July 26, 1995
INTER-DEPARTMENTAL COMMUNICATIONS DATE
TO: ALLAN BORDEN, DCD - Planner
FROM: ALAN A. TAHJA, P/W - Hydraulic Engineer
SU BJ: _ BLD 95-0861 Proposed Spot Realty Expansion
Allan,
I visited the Spot Realty office this morning to inspect for existing
stormwater facilities and to get a better idea of what the proposed grading
entails.
Presently approximately 1/3 of the parking area runoff is directed to an
existing catch basin located near the westerly point of the property. The
catch basin contains no oil water separating features and is relieved by way
of a 6" plastic pipe that drains out of the catch basin to the southwest. I
couldn't find where the 6" pipe discharges to. The remainder of the parking
areas apparently sheet flow to the North and Northwest to be delivered to
State Highway 3 by sheeting down the access driveway. The roof downspouts
appear to deliver their runoff to the parking area surfaces.
The existing facilities appear to violate Mason County Parking Ordinance 815
which requires parking area runoff to be retained on site. The plan delivered
to me contains no provisions for meeting the parking ordinance retention
requirement, and delivering additional runoff to the existing catch basin is
not a satisfactory solution. A permanent stormwater plan should be required
for this proposal providing for retention of the parking area runoffs. If the
proponent's engineer finds that retention is not feasible, discharge from the
site should conform to the Puget Sound Water Quality Downstream Erosion
Control Standard. At other sites in the Belfair area, this is the same
standard the State Highway Department has allowed for runoff to be delivered
to their ditches. As the apparent recipient of the runoff from this site if
infiltration cannot be accomplished, the State DOT should be consulted for
their approval of discharges to their ditches.
A creek is shown on the submitted sketch, and was found in the field. Though
it has been fairly dry recently, the creek was flowing and appears to be a
year round creek. The creek runs under the state highway and ultimately to
Hood Canal . The presence of this creek less than 200 feet from the property
may warrant further review.
I've crudely estimated the amount of material required to accommodate the
� � proposed building and parking area expansion as. . ((70'xl25')/2)x4'deep = 648
cubic yards.
File: H AWP\LETTERS\SPOT-R.IDC
r
I would recommend against approving this proposal without a stormwater plan
that addresses temporary construction erosion and sediment control and
permanent stormwater impact mitigation.
Additional features that may need attention are that the driveway (extension
of the existing access) connected to the northeast corner of the property
delivers runoff onto the realty parking area/driveway and creates a hazard
during freezing conditions. Also, this paved portion of the driveway may cover
a portion of the facility's drainfield.
I hope my comments are helpful in deciding what actions to take concerning
this proposal .