Loading...
HomeMy WebLinkAboutBLD95-00861 Cancelled Addition - BLD Permit / Conditions - 6/15/1995 i '�r�, Mt MASON COUNTY BUILDING PERMIT APPLICATIJON 1995 b 426 W. Cedar/P.O. Box 186, Shelton,WA 98584 427-9670/1-800-562-5628 PLEASE PRINT #1 Owner Phone# �7 L/ acE Fire District# Site Addres4 '� _ St Zip r'1�35 2,8 City Dir tions tq Job Site Owner Mailing Address St Zip City Lien/Title Holder 15 Address St Zip Clty 45 c3� ` tl - - �! Contractor Reg /` 7 #2 Contractor e # Addres "�' C%r Expiration Date 11 l S✓ St '` Zip ` Phone# �. City —1 #3 If septic is located on project site, include records. nnect to Se tic? Public Water Supply L/ Wel o p -- Connect to Sewer System? Name of System .. (If residential, proof of potable water is required) DWI CA #4 Parcel Legal Description LA-1 �' P6"87 ) ti n JJ Log, -ram �qq 1 a all Buildin S u �oota e: existifig/propose �� #5 g q 9 1 st FI Mtll l 2nd FI / 3rd FI / Loft / Basement / Deck / #bedrooms / #bathrooms / Garage / Carport / (Circle:Attached or Detached?) Other sq.ft• / % ` ✓ � ,�-/ ��(�' �3 #6 Use of buildingG ��'� C l Describe work ,7 #7 Type of Job• ew Add Alt Repair Other #8 MOBILE/MANUFACTURED HOME INFORMATION L Model Year Make Model Length Width Serial No. # Bedrooms # Bathrooms Type of Heat Purchase Price $ #9 Indicate by circling the applicable source if any water is on or adjacent to subject property: River Pond Creek Stream Wetland Lake Marsh Saltwater Seasonal Runoff Other Show following on the site plan 7i Lot Dimensions Flood Zones Lot sting Structures Fences Structure Setbacks Driveways Water Lines Shorelines Drainage Plan Topography Septic Systems Wells Proposed Improvements Easements Name of Flanking Street Indicate Directional by (N, S, E, W) Name of Fronting Street in relation to plot plan APPLICANT TO DRAW SITE PLAN BELOW - U) APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW Plumbing Fixtures ($3 each) Fee Mechanical Fixtures ($6 each) No. Toilets CIRCLE FUEL TYPE: Gas, Electric, Bath Basins Heatpump, Other " K Bath Tubs �. nit Fees ShXoers Furn BTU Hot Wat Htr eatpumps Laundry Wa er Vent Systems Sinks Spot Vent Fans Floor Drains No. Boilers/Compressors Laundry Basins HP Dishwasher No. Air Handling Units Disposal cfm# Urinals No. Fire Protection Systems Other Auto. Fire Alarm Sys 50.00 Fixed Fire Supp. Sys 50.00 Permit asic Fee 15.00 Auto Fire Sprink Sys 25.00 TAL PLUMBING $ Other Gas Outlets d, Gas, Pellet Stove NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COM- 15.00 MENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR Permit Basic Fee WORK IS SUSPENDED OR ABANDONED FOR A PERIOD TOTAL MECHANICAL $ OF 180 DAYS AT ANY TIME AFTER WORK IS COM- MENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU- ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE CONFORMANCE THEREWITH.NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING THE BUILDING DEPARTMENT. DEPAR T. X OWNER X BY DATE DAL - FOR OFFICIAIL USE ONLY Accepted by Date: DEPARTMENTAL REVIEW FOR OFFICE USE ONLY Approved Cond. Hold Approval Planning: Environmental Health: Building Plan Review Occupancy Groupa Z Type of Cons+0 Fire Marshal: `,7P Other: Special Conditions: jpo5-c-> ICo-ni- _ FEES Building Permit 3 Plan Check Plumbing Fee Mecoanical Fee Wood/Gas/Pellet Stove Radon Monitor Violation Fee Site Inspection Building State Fee Other Other Building Valuation: 4;55 0. TOTAL FEE THIS PARCEL INCLUQES PLANS, BLUEPRINTS OR. OVERSIZE I MAGES LARG.E .FORMAT IMAGES HAVE. BEEN. STORED IN FILE CABINETS) UNDER PARCEL-NUMBE-R- PARCEL # i 233z - 5D - aoD�G CASE # � LD 45 6 8�o / ..�Sr. r i J , Lgf1`iR�"I sty"r t�y�p t" � 1t`t��4r�r'`l�l��,l t.T •ir ' 'fr '+jam f ,•Y' y �Y AZ�t,r J,•r �� '{{►'f"� u� �A �����,����.�I (y��'}1��{v�}r1��i r j � ,`t r � •, i�� �•tf^J'�'"1 i� r j�Y�'�rat}.✓�Y t� v r f � I I �''y1 fy v���t.^ft��«r�p`S��,♦ �,,{{�Tr��}}t�r it�;• r 1 r� '!r'�{ RI r�����r� ,f r'T�lr r f 1y.l �,f,t l�.t �� Y .�',•I r , � �.I - ',.1}•`I�Y�l.V,7 i r f� r,f� Icy L/ J � ^ � f•� - . 1 1 I v 7. fA!J k R.�r:. Go�-1G LJhl I � R .L �X iST.��JG: f'RoPcaSEca �" „ 'r� 14' P� r R t P-Kra P R o('k----� C` A/ r r IJ Cl `,t NV O j� I I r - .1).,'J�.. 1. "���� .����i�-��I���t F�r�'?i'MI,��`�►'ti����lra-,lw , i ( _ '.!, ' ",J��.+'• t,��ii ""'it7' 1p ,�����•6r�'i'�tVAC!,��f , �P � 1 r , � � �'11 V' S�\!"Rr 1�,,�'��, � t•A )r�.�t, �1 �, 1 1. - .. ',, �,,,jff �'��„fLt'l;''�`.�jlt�1++�;a 41{1. �. 4�{,, r • � t d {: ' f`' 1v'.f,`+7#�+� ��'f11yi�'r rt, r�I: � r;i}•f'•f ._i• ,; • 1 Air• \� r:h rv;�+t+' r f t 1.f, , ti 4fAl 62 ,5-0 ' t r '/• r 'is' I 1 1 1 Tad cR�r. k II ' Goa--�C- (Z�'(h(t•�11-��•.�h l:lr- -� 11 M -- (7 C) �' 1. I •� ' Ll - N bgjl ifj jar KA P �j[`�06"k f r r IV �r r MASON COUNTY STANDARD FORM FOR THE CALCULATION OF REQUIRED FIRE FLOW PROJECT: DATE: LOCATION:[ DEVELOPER: `a f.,�;c �R. . , _ AGENT: PHONE: ARCHITECT: AGENT: PHONE: BUILDING INFORMATION: NUMBER OF STORIES: FOOTPRINT: C116 SQ. FT. AREA OF MEZZANINES OR PARTIAL FLOORS: SQ. FT. TOTAL GROSS AREA OF BUILDING: SQ. FT. TYPE OF CONSTRUCTION: (CIRCLE ONE) I IIFR w.,. . --,TI-lhr* II-N III-lhr* III-N IV V-lhr* , V-N 1. BASIC FLOW FROM MASON COUNTY STANDARD FLOW CHART; USE TOTAL GROSS AREA. FOR NUMBERS BETWEEN AN AREA RANGE USE THE HIGHER GPM FIGURE, DO NOT INTERPOLATE: 6 o e-) gpm 2. IF 1-hr. AS IDENTIFIED WITH * ABOVE -250 gpm crnm SUBTOTAL: r C gpm 3. ADD % SURCHARGE FOR HIGH FIRE LOAD or SUBTRACT% CREDIT FOR LOW FIRE LOAD PER M.C.F.M. SURCHARGE/CREDIT CHART; NEITHER TO EXCEED 25%: +/- i gpm SUBTOTAL: 1 ` '�-1 ..� gpm 4. SUBTRACT 50% FOR APPROVED SPRINKLER SYSTEM:- gpm SUBTOTAL:- gpm 5. FOR EXPOSURES MULTIPLY BY 1.00 TO 1.75** X 1. **[to determine exposure factor add a percentage for each of four directions (express as a decimal) and add 1] Conversion table: ft. 0-10ft. = 25% N= 7 2-d 11-30ft. = 20% E_ !l'. = _� 31-60FT. = 15% 5=�= 61-10OFT = 10% 101-150FT = 5% subtotal { .75 maximum) SUBTOTAL: ,�- "� gpm TOTAL REQUIRED FIRE FLOW: , { -gpm- AVAILABLE FIRE FLOW: gpm # PER: OF: MASON COUNTY STANDARD BASIC FLOW CHART Page 1; Type V-N, III-N, & II-N Type V-N: TYPE III-N & II-N GROSS AREA [SQ. FT] GPM GROSS AREA [SQ.FT. ] GPM TO 500 . . . . . . 500 TO 11200 . . . . . .500 TO 1, 100 . 750 TO 2,400 . . . . . .750 TO 11700 . . . . . 1000 TO 31900 . . . . . 1000 TO 2 , 600 . o 1250 TO 51800 . . . . . 1250 TO 31600 . . . . . 1500 TO 8,200 . . 1500 TO 41800 . . . . . 1750 TO 10,900 . -. 1750 TO 6,200 . . . 2000 TO 13 ,900 . . . . . 2000 TO 71700 . . . . . 2250 TO 17,400 . . . . . 2250 TO 9,400 . . . . . 2500 TO 21,300 . . . . 2500 TO 11,300 . 2750 TO 25, 500 . . . . . 2750 TO 13,4b0 . 3000 TO 30, 100 . . . 3000 TO 15, 600 . . . . . 3250 TO 35,200 . . . . . 3250 TO 18, 000 . . . . . 3500 TO 40,600 . . . . 3500 TO 20,600 . . . . . 3750 TO 46,400 . . . . 3750 TO 23,300 . . . 4000 TO 52,500 . . . . . 4000 TO 26,300 . . . . . 4250 TO 59, 100 . . . . . 4250 TO 29,300 . . . 4500 TO 66,000 . . . . 4500 TO 32,600 . . . 4750 TO 73,300 . . . . . 4750 TO 36,000 . . . . . 5000 TO 81,100 . . . . . 5000 TO 391600 . . . . 5250 TO 89,200 . 5250 TO 43,400 . . . . 5500 TO 97,700 . 5500 TO 47,400 . . . . . 5750 TO 106,500 . 5750 TO 51,500 . 6000 TO 115,800 . 6000 TO 55,700 . 6250 TO 125,500 . 6250 TO 60,200 . . . . . 6500 TO 135,500 . 6500 TO 64,800 . . . . 6750 TO 145,800 . . . 6750 TO 69, 600 . . . . 7000 TO 156,700 . 7000 TO 74,600 . : . . . 7250 TO 167,900 . 7250 TO 79,800 . . . . . 7500 TO 179,400 . . . . . 7500 TO 85, 100 . . . . . 7750 TO 191,400 . . . 7750 or > 85,101 . . . . . . 8000 = or > 191,401 . . . 8000 Note: For type V-lhr. , III-1hr. , or II-lhr. use the base flow figure for non-rated (-N) construction. A credit for lhr. construction is allowed as the second step on the "form for the calculation of required fire flow". MASON COUNTY STANDARD BASIC FLOW CART Page 2; Type II-FR, IV, & I TYPE II-FR & IV HEAVY TIMBER: TYPE I: GROSS AREA [SQ.FT] GPM GROSS AREA [SQ.FT. ] GPM TO 1,900. . .500 TO 31300. . . . . .500 TO 3 ,700. . . .750 TO 6, 600. . . . . . 750 TO 6, 100. . . . . 1000 TO 10,900. o . . 1000 TO 9, 100 . . o 1250 TO 16,200. . . . . . 1250 TO 12,700. . . . . . 1500 TO 221700. . 1500 TO 17,000. . . . . . 1750 TO 301200. . . . . . 1750 TO 21,800. . . . . . 2000 TO 38,700. 2000 TO 27,200. . . . . . 2250 TO 48,300. . . . . 2250 TO 33,200. . . . . . 2500 TO 5910000 . . . 2500 TO 39,700. . . . . . 2750 TO 70,900. . . . . 2750 TO 47,100. . . . . . 3000 TO 831700. . . . . . 3000 TO 54,900. . . . . . 3250 TO 97,700. . 3250 TO 63,400. . . . . . 3500 TO 112,700. . 3500 TO 721400. . . . . . 3750 TO 128,700. . . . . . 3750 TO 82, 100. . . . . . 4000 TO 145,900. . . . . . 4000 TO 92,400. . . . . . 4250 TO 164,200. . . . . . 4250 TO 103,100. . . . . . 4500 TO 183,400. . . . . . 4500 TO 114,600. . . . . . 4750 TO 2031700. . . . . . 4750 TO 1261700. . . . . . 5000 TO 225,200. . . . . 5000 TO 139,400. . . . . . 5250 TO 247,700. . . . . . 5250 TO 152, 600. . . . . . 5500 TO 271,200. . . . . . 5500 TO 166,500. . . . . . 5750 TO 295,900. . . . . . 5750 = or > 166,501. . . . 6000 = or > 295,901. . . . . . 6000 Note: For type V-1hr. , III-1hr. , or II-1hr. use the base flow figure for non-rated (-N) construction. A credit for lhr. construction is allowed as the second step on the "FORM FOR THE CALCULATION OF REQUIRED FIRE FLOW". MASON COUNTY STANDARD CREDITS AND SURCHARGES FOR THE DETERMINATION OF REQUIRED FIRE FLOW THE FOLLOWING ARE CREDITS AND SURCHARGES BASED UPON" THE MAJOR BUILDING USE AS DEFINED BY THE UNIFORM BUILDING CODE CATEGORIES LISTED BELOW. ANY CATEGORY NOT IDENTIFIED SHALL BE ASSUMED TO HAVE NO CREDIT. CREDITS: -25% . . . .R-1 -20% . . . .B-4 E-3 I-112,3 -15% . . . .B-3 E-1,2 -10% . . . .A-4 B-2 (ENTIRELY OFFICE USE ONLY) 0 B-2 NOT SPECIFIED ELSEWHERE B-2 MIXED USES B-4 WITH HIGH STORAGE OF CLASS I COMMODITIES. OTHER USES NOT SPECIFIED SURCHARGES: +10% . . . B-1 B-2 WITH HIGH STORAGE OF CLASS I COMMODITIES +15% B-2 WITH HIGH STORAGE OF CLASS II COMMODITIES B-3 H-4,5,6,7 +20% . . . B-2 WITH HIGH STORAGE OF CLASS III COMMODITIES +25% . B-2 WITH HIGH STORAGE CLASS IV COMMODITIES H-1,2 GARY YANDO,DIRECTOR �oN.S Tq P M o DEPARTMENT OF COMMUNITY DEVELOPMENT 0 o N Z PLANNING - SOLID WASTE-UTILITIES 27o N y oy BLDG. III • 426 W. CEDAR • P.O. BOX 578 SHELTON,WA 98584 • (206) 427-9670 1864 July 7, 1995 Spot Realty Attn: Bob Dick Lfir P.O. Box 1029 - vue Belfair, Washington .98528 �/� � . V � Dear .Mr. Dick. This letteris to express in writing the concerns of the Mason County Building Department and Mason County Department of Community Development in the review of. a building permit for expanding your commercial office on State Route 3 (BLD95-0861) . These specific concerns are building setbacks, -property lines, excavation and removal of soil materials, stormwater, and parking requirements. As discussed by phone on July 6, 1995, the Department of , Community Development has noted that the footprint of the proposed building expansion crosses the line between the two properties at this location. Both Community Development and Building Departments will not allow structures ntoo befo built tthat do not meet setbacks from poupmatywantlines to(�esolve this situation ck from the property line) . Y through a combination of parcels, boundary line adjustment or short subdivision; contact the Department of Community Development to file the correct forms for any of these solutions . The site plan shows that the building and parking lot will be in an area that requires extensive grading, especially excavation and removal of materials (an estimated 400 cu yds. ) to another location. An 8 ft. high, 78 ft. long wall will hold the uphill bank to provide the area, for the building foundation and parking lot. These two concerns will have to be addressed by the Building Department through a grading permit for the excavation and removal of materials, and a miscellaneous permit for the wall extending along the cut at the construction site. The proposed parking lot expanding from 10 (plus 1 handicapped) spaces to 22 (plus 1 handicapped) would meet the county' s parking standards . Paving the parking area and providing adequate stormwater drainage are elements of this proposed commercial expansion that will be reviewed by Mason County Department of Public Works . Further processing of your building permit depends on resolving these points of concern. I suggest these telephone extensions at Mason County offices (main number is 275-4467) toaexter281these questions: Michael MacSems (Community Development) Griffey (Building) ext . 356; and Alan Tahja (Public Works)to exit 461 . If you have other questions, you may also me at ext . 365 . Sincerely, 44 Allan Borden Shoreline Planner rjutlt4a' h4�1 � Vv alto �- t � i 4- Vow Ir i -'.,.ass �i �•�, yr� � - 1 z '�E z z 00 x 00 0, C: cn d 01 4r 00 01 00 t7 13 BETE / a.P- fhOfilWECHANICAL t MOBILE HOME ings-Setback date by Ribbons , (— by ! Gas Piping date b .dation Walls date by Set Up .e (n=A— 5 by [ ✓ INSULATION date by a/SLAB-Insu ion Floors Final ate by date by date by 'RAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwo€k date by date b D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by RcQ/mac-e- -5.G h anNi -• s O oU//�` l� �r� ��s �' fer t✓ke-r-C e,-r L (GC)1 CG� 4�! 7 r f� 2 w GQ�/- 4 GA /, 71 '7 7 ob 7 OD ol Cf) cn N) -711 -0 QL 000 Ol 00 OQ w ol c O � z :37Z C� N N cQ � � (D �o Q c(n Q OD I I i i I Building Permit # is MASON COUNTY r BUILDING III 426 W. CEDAR ` SHELTON, WASHINGTON 98584 � (360) 427-9670 CORRECTION NOTICE Job Location 14. E-. )—S& S , This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: ,,Y' �_ `, Items listed below must be corrected to gain code compliance L� lV Plai� Q-5L� I 1 I I You r hereby otified that the above corrections shall , made BEFORE PROCEEDING VVITH ANY FURTHER WORK v Call for re-inspection when corrections are made before continui g — ------ ❑ Make corrections, items will be checked on next inspection /�1 ;E XO K to ,S� Q aA r „-, l/ Department Date Inspector DO' 140T REMOVi THIS 'IrAG Page No. 1 CASE HISTORY FOR CASE NO.: BLD95-0861 , SPOT REALTY . NE22580 STATE ROUTE 3 BELFAIR 10/02/95 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By ------- ------------------------------ -------- -------- -------- --------------------------------------- ---- --- -------- --- BLDA010 Application received / / / / 06/21/95 06/21/95 KW BLDA100 Approved For Issuance / / / / 08/28/95 DONE KS 09/05/95 KS BLDA500 (F) Issue building permit / / / / 09/05/95 DONE NJP 09/05/95 NJP BLDB009 Fire Marshal Review 08/24/95 / / 08/24/95 return to toni when done tks...tdh DONE DLS 08/24/95 DLS BLDB110 Structural Plan Review 08/22/95 / / 08/28/95 I HAVE THE EH STUFF IN THE TIN BIN. WHEN DONE DH 08/28/95 DWH YOU ARE DONE REVIEWING THE FILE, PLEASE RETURN TO ME DIRECTLY IF POSSIBLE. THANKS PAM. BLDB120 WSEC Compliance Review 08/24/95 / / 08/24/95 heat pump addition. DONE TDH 08/24/95 TDH BLDB130 Planning Review 06/27/95 / / 08/22/95 sent letter (07-07) to confirm DCD/BLDG DONE AHB 08/22/95 AHB concerns about building over the property line and excavation/removal of 400-500 cu yds of material. AHB 07-20-95: sent copy of application to A. Tahja for stormwater review of this commercial bldg. 08-22-95: ADDED CONDITIONS TO PERMIT. AHB BLDB134 RLC Checklist Review / / / / / / 06/21/95 KW BLDB135 Addressing / / / / 06/28/95 DONE GMM 06/28/95 GMM BLDB200 Environmental Health Review 06/21/95 / / 06/27/95 need to have tank pumped, show reserve HOLD PSD 08/22/95 PSD and create records, per discussion with Brad Banner. I called the applicant and spoke to Bob dick, he confirmed that the expansion will not result in an increase in sewage volume as there will be no change in employees. psd 8/21/95 The required stuff is in the tin bin. psd BLDB200 Environmental Health Review 08/28/95 / / 08/28/95 as-built and pumpers report in the file. DONE PSD 08/28/95 PSD psd BLDC110 Footing inspection 09/29/95 10/02/95 10/02/95 CONDITIONAL APPROVAL: COND LW 10/02/95 LAW 1. PROPERTY LINES NOT MARKED, MAINTAIN REQUIRED SET BACKS AS PER PLANS. 2. THE 2 FT. WIDE FOOTING IS REQUIRED TO BE 8 INCHES DEEP, WHEN LEVELING MAINTAIN 8 INCHES OF DEPTH THROUGH OUT. 3. MAINTAIN 3 INCHES OF CLEARANCE BETWEEN THE GROUND AND BAR.(HANG BAR). 4. THE 2 FT. WIDE FOOTING FOR THE RETAINING WALL WHERE THE PARKING STALLS ARE, BEND VERT. REBAR STUBS 90 DEGREES. OK TO FIX TAKE PHOTO'S AND PROCEED, PROVIDE PHOTOS AT NEXT INSPECTION.