HomeMy WebLinkAboutCOM2010-00010 Exterior Veneer - COM Permit / Conditions - 1/15/2010 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
Shelton,WA 98584
L�
COMMERCIAL BUILDING PERMIT COM2010-00010
OWNER: NORTH MASON SCHOOL DISTRICT RECEIVED: 1/28/2010
CONTRACTOR: LICENSE: EXP: ISSUED: 4/20/2010
SITE ADDRESS: 300 E CAMPUS DR (HAWKINS MS) BELFAIR EXPIRES: 10/20/201C
PARCEL NUMBER: 122082360000
LEGAL DESCRIPTION: SW NW E OF R/W"SEE SURVEY 9/14
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
MIDDLE SCHOOL-ADD EXTERIOR CMU VERNEER
General Information Construction &Occupancy Information
No. of Units: Type of Constr.:
Type of Use: Insp.Area: No. of Bathrooms: Occ. Group:
Type of Work: Fire Dist.: No. of Stories: Occ. Load:
Valuation: $ 90,000.00 Building Height:
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp.Plan Desig.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2010-00010 Please refer to the following pages for conditions of this permit. 1 of 4
ram.. Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Building State Fee r;nnnn 10AMIn Ra t;n S19ninnn
Building Permit Fee MAM ii?anntn 4gtn 7r, Ct9ninnn
Total $935.25
CASE NOTES FOR
COM2010-00010
CONDITIONS FOR
COM2010-00010
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-0982s_The person-signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
2) All approved plans quired to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be
granted. In additi area reinspection fee, based on the current fee schedule, minimum one-hour will be c arged and collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X f'
3) Owner/Agent is responsible to post the assigned address and/or purchase and post private d signs in accordance with Mason County Title
14.28.
X
4) In ition to the inspections required in IBC, Section 109, the owner, the engineer or architect of record acting as the owner's agent shall employ
one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by
the design professional. The special inspectors duties& responsibilities shall be as specified in Chapter 17.
1-SOIL COMPACTION, 2-BOLTS INSTALLED IN CONCRETE, 3-ACHORED VENEER, 4-STRUCTUAL STEEL, 5-STRUCTUAL STEEL
WELDING. SEE PG 01400-4 OF PROJECT MANUAL.
Special inspection reports shall be submitted to the Mason County Building Department, PO Box 186, Shelton WA 98584 and available for
inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and
final occupancy inspections.
X
5) A anges in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to
construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are
removed, approval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and
YACONSTRUCTION
d by the Mason County Building Department prior to any further inspections being performed or approvals granted.
6) MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND
ANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD
RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x
COM2010-00010 2 of 4
`-1) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely
impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements
of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a
driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450.
For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review
future planned work hich may a amour project.
X
8) Changes to a,VW2ved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air
Quality Code (VIAQ), B ing/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
X
9) CO RUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
A OPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Mason County Buildin I star shall be made prior to requesting additional inspections.
X
10) All bu'Iding permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
fai ure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
non-compliant with Mason County ordinances and building regulations.
X
11) ermits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the
time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control
of the permit holder have prevented action from being taken. No more than one extension may be granted.
X
This perm mes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended fora period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWN ER OR AGENT: � DATE:
COM2010-00010 3 of 4
M
0 z
9 CONCRETE MECHANICAL MANUFACTURED HOME 0
to I
C) ;0
Footings/setbacks Date By Ribbons
I? Gas Piping
C)
C) Interior Date By interior-Date By Date By
C) -
Exterior Date By Exterior Date By Set-up Cl)
>
Point Load I Isolated Footings INSULATION Date By 0
BG I SLAB INSULATION z
Date By Data By FIRE DEPARTMENT Cl)
Foundation Walls 0
Floors Date By M
Date BY Data By DECKS 00
FRAMING Walls Date By r-
Date By Date PROPANE TANKS 0
Vault Date By C/)
PLUMBING I
Date By OTHER X
Groundwork Attic 0
Date By Date By Type. --I
Dale By
0.W.1V DRYWALL Type 0
Int.Brace Wall Date By 0
Date By 9
Date By FINAL INSPECTION N3
Water Line Fire S operation C?
Date By Date By Date B y 9
C)
Pass or Request Inspect. C?C)
Type of Insp. Fail Date Date Done By Comments C)
Krazan
& ASSOCIATES , INC . "
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
September 10, 2010 Project No.: 106-10101
Mason County
Attention: Mr.Mark Core
P.O.Box 186
Shelton,WA 98584
RE: Final Letter Regarding Special Testing&Inspection Permit No.: 12208/23/60000
North Mason School District Campus—Hawkins Middle School COM2010-00010
Belfair,WA
Dear Mr. Core:
In accordance with our client's request and authorization, we have performed special testing and inspection
services for the above referenced project.The special inspections for this project were:
Special Inspection Required Performed
Expansion/Epoxy Anchor Bolts
To the best of our knowledge, all work and noted deficiencies have been tested and/or inspected and have been
found to be in accordance with the approved plans and specifications.
If you have any questions or if we can be of further assistance, please do not hesitate to contact our office at
(360)598-2126.
Respectfully submitted,
KrBowers
IATES,INC.
J
Construction Services Manager
Poulsbo Division
JMB/md
cc North Mason School District—David Peterson
With Offices Serving The Western United States
1230 Finn Hill Road NW Ste. A 9 Poulsbo,Washington 98370 9(360)598-2126 9 Fax: (360)598-2127
• K m z-o -i
& ASSOCIATES , INC .
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
September 10, 2010 Project No.: 106-10102
Mason County
Attention: Mr.Mark Core
P.O.Box 186
Shelton,WA 98584
RE: Final Letter Regarding Special Testing& Inspection Permit No.: 12208/23/60000
North Mason School District Campus—Alt A,Admin Bldg. COM2010-00010
Belfair,WA
Dear Mr. Core:
In accordance with our client's request and authorization, we have performed special testing and inspection
services for the above referenced project.The special inspections for this project were:
Special Inspection Required Performed
Expansion/Epoxy Anchor Bolts
To the best of our knowledge, all work and noted deficiencies have been tested and/or inspected and have been
found to be in accordance with the approved plans and specifications.
If you have any questions or if we can be of further assistance, please do not hesitate to contact our office at
(360)598-2126.
Respectfully submit ,
KRAZYBowers
CIATES, INC.
Jeffrey
Construction Services Manager
Poulsbo Division
JMB/md
cc North Mason School District—David Peterson
With Offices Serving The Western United States
1230 Finn Hill Road NW Ste.A•Poulsbo,Washington 98370•(360)598-2126•Fax: (360)598-2127
MASON COUNTY PERMIT NO.CO") , `O
�tAiddle School Application BUILDING PERMIT APPLICATION �� ��
426 W. Cedar• P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670. Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner North Mason School Dist # 403 Company Name Not vet selected. Open bid process.
Mailing Address 71 E Campus Drive Mailing Address
City Belfair State WA Zip Code 98528-8305 City State Zip Code
Phone 360-750-7500 Other Ph. Phone Other Ph.
Lien/Title Holder Contractor Reg. # Exp.
E mail address - E Mail Address
Drivers Lie.# DOB Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic Existing Septic
Connect to Water System Name of Water System
Well Water System Name of Water System
PARCEL INFORMATION-12 Digit Parcel No 122082260000 Fire District 5 1
Legal Description See attached Ln
Site Address(Please include street name, street number and city) 71 E Campus Drive Belfair WA 98528 !� <a
Directions to site See attached hftd
LLl �
ry
Will timber be cut and sold in parcel preparation? Yes/No
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff-Stream Slopes or Bluffs 7 15% '' a
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes No
TYPE OF JOB - New Addv e alr Other PRIMARY RF_SIDENCE F1 SEASONAL ❑
Use of Building School Describe Work Add Exterior CMU Veneer
No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq.ft.
Garage Attached --- Detached Carport Attached - Detached
MANUFACTURED HOME INFORMATION -Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other parry in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the Information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROOF OF CObITINLIATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION.
- Date:
ner/ wners Re reseritati /Contractor indicate which one
O OFFICIAL USE BEYOND THIS POINT Accepted by: Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department pgit
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
FEES
Building Permit Fee Site inspection
Plan Review Fee EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal
Valuation$ TOTAL FEES
R
I
MASON COUNTY PERMIT NO. �
�tVliddle School Application BUILDING PERMIT APPLICATION
t
426 W. Cedar- P.O. Box 186, Shelton, WA 98584 \j
Shelton (360) 427-9670- Belfair (360) 275-4467 o Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner North Mason School Dist # 403 Company Name Not vet selected. Open bid process.
Mailing Address 71 E Campus Drive Mailing Address
City Belfair State WA Zip Code 98528-8305 City State Zip Code
Phone 360-750-7500 Other Ph.. _ Phone Other Ph.
Lien/Title Holder _ Contractor Reg. # Exp.
E mail address - IE Mail Address
Drivers Lie.# DOB Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic. . Existing Septic
Connect to Water System Name of Water System
Well Water System Name of Water System
PARCEL INFORMATION-12 Digit Parcel No 122082260000 Fire District No-5
Legal Description See attached
Site Address(Please include street name, street number and city) 71 E Campus Drive Belfair WA 28528
Directions to site See attached
Will timber be cut and sold in parcel preparation? Yes/No
Is property within 200'of Saltwater Lake - River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this Permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes No
TYPE OF JOB - New Addv a air Other PRIMARY RESIDENCE SEASONAL ❑
Use of Building School Describe Work Add Exterior CMU Veneer No. of Bedrooms No. of Bathrooms Square Footage-1 st Floor 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq.ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION -Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that 1 have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROOF OF CO TIN TION OF WORK IS BY MEANS OF A PROGRESS INSPECTION.
x Date, 1—f5- /O
er/ wners Re rese_n_Tb /Contractor indicate which one
O OFFICIAL USE BEYOND THIS POINT Accepted by. Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
FEES
Buildino Permit Fee Site Inspection
Plan Review Fee EH Review Fee
Plumbing& Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal
Valuation$ TOTAL FEES
MASON COUNTY DEPARTMENT OF
COMMUNITY DEVELOPMENT
426 West Cedar Street ♦ PO Box 186 ♦ Shelton,WA 98584
(360)427-9670 EXT. 352 FAX(360)427-7798 HOME PAGE—www.co.masonma.us
Special inspection policy
Scope:
To ensure compliance with all provisions of Local, State and International Building Codes in addition to
all jurisdictional policies.
Responsible Party:
The owner or registered design professional acting as the owners agent is responsible to obtain, and have
pre-approved by the jurisdiction, any and all Special Inspection Agencies and/or persons employed by
such.
Policy:
Mason County allows two methods in which compliance may be obtained. Please read the following
options carefully when choosing your method of compliance and special inspection agency:
[]Option I: Registration with WABO (Washington Association of Building Officials)
The WABO registration gives the jurisdiction the assurance that the individual and or
agency has met certain criteria and that the criteria is maintained.
See WWW.WABO.ORG for listing of approved individuals or agencies.
gUption II: Mason County will approve an individual or company, to perform inspections upon
demonstration of competence for the particular type of construction or operation requiring
special inspection. As proof of competence the individual or company will need to
conform to all of the following criteria and provide supporting documentation.
A.)Provide the name of the individual that will perform the particular type of
inspection along with documents demonstrating competency including copies of
all certifications and registration numbers pertinent to the inspection type.
Examples: (ICC, ICBO,NICET, AWS)
WA. State licensed Structural/Civil Engineers or Architects may also be accepted.
B.)When laboratory testing and field inspection equipment will be required provide
details of specific tests,the quality of the system,procedures to ensure test are
performed properly and all policies for recording, reviewing and performing
such test. An equipment log must be maintained and available for review. All calibration
maintenance records must be traceable to the National bureau of Standards, calibrations must be
performed frequently as set up per the standards.
C.)When all required information has been submitted staff will review documentation and approve
the acceptability of the special inspection competency or request additional information as
deemed necessary.
Authorization Form:
After selecting option I or II please complete the "Special Inspection Authorization" form and submit it
to Mason County for initial review.
Approved By: Mark Core Date: 10-02-07
15. Smoke-control system. Smoke control systems snall be tested by a special inspector per IBC Section
1704.14.
16. Special cases. Special inspection shall be required for proposed work that is, in the option of the building
official, unusual in its nature such as alternative methods and material of construction, unusual design applications,
and materials and systems required to be installed in accordance with additional manufacturer's instructions that
prescribe requirements not contained in the IBC or referenced standards.
Installation of structural epoxies Installation of"high-load shear panels"
Structural Observation (IBC1709) Other:
Special Inspector Selection:
The special inspection agency and special inspector shall be registered by the Washington Association of Building
Officials (WABO)for the particular type of construction or operation requiring special inspection. Such inspector(s)
shall be selected by the owner or the owner's agent and approved by the Building Official prior to issuance of the
building permit. The owner's agent shall not be acting as, or employed by the special inspection agency or the
contractor for this project.
Name of Special Inspector or Agency: Type of Inspection: Registration Number:
�d c� -t,.F of ka'-XIC's �..I0_ �mod. ?-6 —
65A: L
.01
Authorization: I hereby state that I am the legal owner of the project property, or that I am the legal owner's agent
who is not employed by a special inspection agency or contractor associated with this project. In addition, I agree
to comply with the special inspection requirements established by Chapter 17 of the International Building Code as
adopted by Mason County.
ture l5rinted Name Owner (LqeW Date
PURPOSE OF SPECIAL INSPECTION
Special inspection is the monitoring of materials and workmanship which are critical to the integrity of the building
structure to assure that the approved plans and specifications are being followed and that relevant codes are being
observed. Special inspections are in addition to those conducted by the county building inspector and by the
engineer or architect of record. Special inspectors furnish inspection at all times that their presence is required by
the code, the plans and specifications, and the enforcing jurisdiction. Good communication between the special
inspector and the designer, contractor, and building department is essential.
DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR:
Special inspectors are individuals with highly developed, specialized skills who observe those critical building or
structural features which they are qualified to inspect. Duties of special inspectors and/or inspection agencies
include the following:
1. General Requirements
Special inspectors shall review approved plans and specifications for special inspection requirements.
Special inspectors shall comply with the special inspection requirements of the enforcing jurisdiction.
2. Signify Presence at Job Site
Special inspectors should notify contractor personnel and the enforcing jurisdiction of their presence and
responsibilities at the job site.
3. Observe All Work for Which They Are Responsible
Special inspectors shall inspect all work and perform or observe all tests requiring inspection and testing for
conformance with the building-department-approved (stamped) drawings, specifications and applicable
provisions of the code.
4. Notification of Discrepancies
Special inspectors shall bring all nonconforming items to the immediate attention of the contractor. If any
such item is not resolved in a timely manner or is about to be incorporated in the work, the engineer or
architect of record and the building official should be notified immediately by telephone or in person, and
the item noted in the special inspector's written report. The special inspector shall write a separate report
to be posted at the job site regarding noted discrepancies which should contain, as a minimum, the
following information about each nonconforming item:
• Description and exact location,
• Reference to applicable detail of approved plans/specifications,
• Name and title of each individual notified and method of notification, and
• Resolution or corrective action.
5. Reports
A. Inspection reports
The special inspector should complete written inspection reports for each inspection visit and provide the
reports on a timely basis determined by the building official. The special inspector or inspection agency
shall furnish these reports directly to the building official, engineer or architect of record, and others as
designated. These reports should be organized on a daily format and may be submitted weekly at the
option of the building official. In these reports, special inspectors should:
• Describe inspections and tests made with applicable locations;
• List all nonconforming items;
• Indicate how nonconforming items were resolved;
• List unresolved items, parties notified, and time and method of notification; and
• Itemize changes authorized by the architect/engineer of record and approved by the building department,
if not included in the nonconformance items.
B. Final reports
Special inspectors or inspection agencies shall submit a final, signed report to the building department
stating that all items requiring special inspection and testing were fulfilled and reported and, to the best of
their knowledge, in conformance with the approved design drawings, specifications, approved change
orders and the applicable provisions of the code. Items not in conformance, unresolved items or any
discrepancies in inspection coverage(i.e., missed inspections, periodic inspections when continuous was
required, etc.)should be specifically itemized in this report.
DUTIES AND RESPONSIBILITIES OF THE CONTRACTOR:
The contractor's duties include responsibility for notifying the special inspector or agency regarding individual
inspections required by the Building Department, or required by the International Building Code, Chapter 17.
Adequate notice shall be provided so that the special inspector shall have appropriate access to the approved
plans at the job site prior to the required inspection. The contractor shall not perform any work that requires special
inspection without the special inspector present. Completion of this form, and the performance of special
inspections does not relieve the contractor's responsibility to schedule required inspections by the Mason County
Building Department prior to concealing any work.
DUTIES AND RESPONSIBILITIES OF THE ENGINEER OR ARCHITECT OF RECORD:
The engineer or architect of record is responsible for identifying which special inspections are necessary,
developing a schedule of required special inspections, and assisting the owner in the selection of the special
inspector. The engineer or architect or record shall review the special inspection reports to determine that all
required special inspections have been performed and that all discrepancies (if any) have been resolved.
DUTIES AND RESPONSIBILITIES OF THE PROJECT OWNER:
The project owner, or the engineer or architect of record acting as the owner's agent, is responsible for the funding
of all required special inspection activities in accordance with International Building Code Section 1704.
0 '
O
cn cn m °o_ v -i z 0 O
o m m m o m CD ' 0
� O cn m
o N °' 0) o m * 0 -4 m
v
o CCD CL � o o � � D >
r D
cn m o w mo 0 � C p
� o � o CD mx Z n � � � �
m �* i o z -{ =icom -Az D
u ; D mm � T rr 0 a -gym OmcnOm o un (n
N 0 o w zxcnX x n0
f o O
z a
y CN� � o O D
o m z m ago co O
.� .. w � 3 o Qcn o < mo > m � 00 ( C
Z 00omzC w Z
o
oD D � m
�
-- °' o m = X0
m = � 0 v
T c
-n cn o n O
o 0 O -n
„ m 0 3 n
CD, G O m o
o
0 0 co -i rn
m C
71 O v
D r Z
cc m 0
(0) y z n C
o C z o p r C
mW co n0 — z z 0 m
3 m o D °n y COrt cc mco ° Z C
a CD �•� 3 = CQ p G7 m
fl —
O 21 D co N 0 7 N fD• O O C N m r
CD o CD = - co m 3 m mTO
N V
(a = N
O a N n
o < _� m
N 2) W S N Z
a J Q X O �
3 o
90 O 90
v O O
00
(D C
CD
B =r O O O 7
v N 7 O n A
o `G
N (D O' 'D N O O = -Ow
N
TI p 0 D) O o_ •o 7
fD '.
CDN N. p ' 3
m �'cn ' = -
mj w ;oO oai
CD C. CDan d 0 m m � m m
C x (� 0
N
(h o
j o � Z7CC
) J CDCn o p , N
v
O .. .. .. _a .s. — C W
CD IV N O -CD
0
No o OD O
N O O NJ r1i m N
x
O O � �
ri
N N
O °) Cn � <
a
N co
O
1p o xp > Xo fD o > X � v�i o � '� � o E X � 0 co(a D * 0
o CD
Cnn CD o o m cD 0 CD Q allo � : C-0o tn ?. in: �
� rv0 m m c w ° '°' °� � rcn '+ Qa m m 3 0
� Dz �U� O-ca vayG) C)� o ° D 0 - ° fDv -I0 cn
zZ � `< v m v O-0 m m CD Q 0- °� � � � _n
C) -1 a ti � CD cn v m cD
� -� � �a � n m p �� ? r' env CD
CIO x
m C m ° D g .< CA� cnn � ni - ° 5.� O' mCD 0 na) m u, 3 : � Xo � c,
In
o
°' m(QUmpo' n a - -?N-0
°o a ° voz � 0 " Z co °
mmK mc � �C o m a ' Dm�
< pc o a � -0 N oN � m o - S .Q 000 o c ° $O c :3 , n 'tv v (mn
15
c ° o CD00 CDQcn cn v pffi a) CD o'
D ,�c U) = 0ry cn ° Q- (Do ce � � �crn mvo= m ° oo °O c vmTC/ 0 =r -°
Zm Q N ° Qc '� Z - cn Q S p ° cn n -
m0 (fl Q m co � Ocn � � _. m co o ° Q
CD
(DCID ' D v :3 Q cn ° CL
ZKX CD v0- -aCL pn v, -0Cnm conic
c� Q a) Q- (D - K m O < - cfl' n CD �' °' a
CD m
m0mrl 3 0 -0 � Q ° D - CD CD o j ° co
CD � 0) � Zz 0 5' - �
m
D � =3 a• m a) CD C � ° a) cn - cn -- n >
CzrD- a 0 (� Q- KrOaiI OL a o m ° �
v CD, °
(nor o' er � :3 c O zgo00 fD c O= (p' � n
m a r -r am (D CD p- � (7 � O cyn 7 CL X
K O ° -0 a) ;7 CD , •a (D : O ..
� n � � ° 3n mNv, � m3 � o
-
� Or-- `� 0 p cD a c mo cO - o m� �. CD n y
� � < n N ° CD 3 n
co MOO � m o- o ° � Waco m a nn CDi CD.
3 � 0z 0m
MOO SfD cn ? co D 'CD - CD 0 - � N • (D (D O 3 Q N p
-Ur- � coo CD CD 0QQCD Z- = (n : � 0 � c � * o o � o �
p u� z o M CD Q ° c =r CD�(Q m � c � m -a -a �cn f D 0 g cn $ cn
05 0 v 0) < CCD � CD a- E 3 � � � � m �
CD cn 3'� m a) O CD ai (D
'D -DI m N (D a- Q 3 3 Z cn o O (Q c `2
x 0 z CD Q m m tri m v 3 � � cQ D
Ozm 5' � c * `� � comma) -a ° N CD
m co co
(QfD `nc' 3 � � � < (DOL CD vc
D Z a a) 0 ,� -,-a - =• 0- (D o n
Oz{ D a, 0 3cQ = co (nQ CD (D XOc o Dm 0
C7 _I o CD O N ° -� 7' O .n-. (Q (D (n -u m
Dm0 3 0 =CD a) " C0 * o n �, Q ° � ° v m
ZZD C- m P* Q' OD � a) n N vQ'I (SD CD r m �,
O r nv ti - a cn cD QCD CD
(D CD o - N r (gyp a) N to Z) O= o
x OT0 3 � � m $ (n � Q. v m
n � • °
Cm O< ?. � O cn m 7 (o n Q. � O- .n-« Q 7 7
3 m c o °
'gym ,� cr CD a, a sv n
m cn c
p p (0 3 co co cn C) = Z) n 3 (con c cn „
, m . j v� a CD � m Om mn 00 ° m mc
Q (D InC V7 n -0 (D
n m = (Q -0, a) cD a a �3 A ,
T -zl N CD Q v cn K a " O O =3 5' >
zD m v. D a.m cn° � N N v 0
r 7 > CD C - O O N V D
c n
c m c p .0a) cn a0
O m cDw :3 O 0 =3 3 N
N c (Q CDQ (Q r c� = Z n cr-p (n r
0 o QcnCD 0 cD3 o0 ° w
QN ° Q" 6 0 (D j N (Q' COD
CD �< �< ,�
0 n � , v
m p 0 =r v v p
N 3 y
O< Q O
�(li
o X D XwD oDn X
0 - o o No o _ v mm0
vo D CD m5m -0 � E c � (D� m � p
mck 0 boo o (o
CO ONO nc (n 0
0p(no � 3 = cm m N
C m : 0mQ� (O c o °m 3 (n • nX 0 3 v
o 0 - o W -00 m 0 m0 m g 0 O
� 0X m
CD m = m
= m a o c 3 co F0 c D
cna ;4 : Z Do O
< o oN0
0 �"O 5 m CL 0O m
N W m CD
aN M=' o a -a (n a) - 0 0 c0c(amaaj1)
< N mco -b 3 = "< m 0 0) :3 O- O CL O m lA
mooN a) (D m m �
j 0 CD
co :
oyN - Xz :3 a- v - CD
.1 CDmo 0 a 3 0FDr Q o m ( 3 F ° m
m m n) o m � CD m0 a Oa)j n -0 6 CD n O O
n mo a) CDo (ON. vo -0 m � m c0m � � � (0
(u �' (- m m -� �) to 0 a
0 cu
0m � m = � sv30
0 m m e 3 no o m 3 n w �' o camcl
O 0 o - .
o � O- a Q j n n O - °) O v1 O
' s �,' 02 mu) o CT n � v3 iD � nCDo
CD = C no m c �(a � c
o � � N �oco 0- � 3 0m � C� off' � mvm0
= g - o _ a �. a CD = -0 m m 0 � noi �1 ,0� 0 o
ms � o A :3=rW -0 CD p �' m = nmQOm
vim ? v3 m � (a CD0- :3 (Ni, oO o3
c� w N z@ v c = CL CO -0
D v no 0 0 �. m v o-0 _ - cn o m ° m , :
m 0 o cfl ncr m 0 m m ' 3
� � Oo 3 � 0c �
m � � my ° O3= � 3 � - cr p � � � � ma, cn5
m = ' � �' � � m CD CD aim 0 ? (n m -Zjm
8. o a
00 O z N .-. O X
v = o CD
? � pw m :3
mc m
� o 00
m m X '= =. 0m
n = C %U0 � °° v � 3 0
� s18 � > > 0 c° o !=,Z:3 D <CD v � m � o
00 = s@ 0m v � 3 c/) cn b- D > jcn
1 _ _
- 0• 0 0 o n 0 Doo z m y �. mC� O 0
o c .moo. m > > < 0 c l< c 0• C (zr CYmQm 0
= 0' m 0 3 m . m 0 0- O ai m 5' u� °). m o
o v � <CD !R : (n � � 0 (a C cn = cnZT n=i s =
o m ` O `D cn co0 Cr CD n CD o Z °) (O O m m m O—
O CD N = 0 0 0 0 -0 a- C _ m � m m
N. y. CCD N 0- a(o c=3 W of m O -» cn N CD
mm o = � 3 C O 0 CD
11 y _0 � n °« a o 3m r m cn 0 o n_0
CD O m m n � 0 O C � _. 3
' ma cn m Z < � (030n ? �
CD Cr CD c o � � m m D G) am m m m m
c a fD O m 3 cn —Xv CD C7 -' : Q (n O
CD - CO0. S j O O= m M.O < n N m O to
c C: �CD 0 � m M D - 7 ° p � n a0
� = n C cn(Q o . N n 0 a) 0 0 0 0 �. O
o m 0 = O 0-0 _ 0 m cn = 0 O= 0 ? N
0 A m o m � o m (n z .. (n 0 w
CD y o N. 0 cn � 3 (D 3 n = v c (n c
oCL m m3 � � -0 CA z o � o `0° mz
m 3 '< m m
o � cnx �' or p 3Q 3CD CD - � O
0 CD 0)
(� -
w � m' � o . 00 �
l< m D m - O Qo� mO m -0
o om
03 0 - < -N (n3 ((-n
> > m o3 -I CD mmm
� �' w o m m
� �
o v
O � (n•