Loading...
HomeMy WebLinkAboutCOM2010-00010 Exterior Veneer - COM Permit / Conditions - 1/15/2010 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 Shelton,WA 98584 L� COMMERCIAL BUILDING PERMIT COM2010-00010 OWNER: NORTH MASON SCHOOL DISTRICT RECEIVED: 1/28/2010 CONTRACTOR: LICENSE: EXP: ISSUED: 4/20/2010 SITE ADDRESS: 300 E CAMPUS DR (HAWKINS MS) BELFAIR EXPIRES: 10/20/201C PARCEL NUMBER: 122082360000 LEGAL DESCRIPTION: SW NW E OF R/W"SEE SURVEY 9/14 PROJECT DESCRIPTION: DIRECTIONS TO SITE: MIDDLE SCHOOL-ADD EXTERIOR CMU VERNEER General Information Construction &Occupancy Information No. of Units: Type of Constr.: Type of Use: Insp.Area: No. of Bathrooms: Occ. Group: Type of Work: Fire Dist.: No. of Stories: Occ. Load: Valuation: $ 90,000.00 Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp.Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2010-00010 Please refer to the following pages for conditions of this permit. 1 of 4 ram.. Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Building State Fee r;nnnn 10AMIn Ra t;n S19ninnn Building Permit Fee MAM ii?anntn 4gtn 7r, Ct9ninnn Total $935.25 CASE NOTES FOR COM2010-00010 CONDITIONS FOR COM2010-00010 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982s_The person-signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) All approved plans quired to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In additi area reinspection fee, based on the current fee schedule, minimum one-hour will be c arged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X f' 3) Owner/Agent is responsible to post the assigned address and/or purchase and post private d signs in accordance with Mason County Title 14.28. X 4) In ition to the inspections required in IBC, Section 109, the owner, the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by the design professional. The special inspectors duties& responsibilities shall be as specified in Chapter 17. 1-SOIL COMPACTION, 2-BOLTS INSTALLED IN CONCRETE, 3-ACHORED VENEER, 4-STRUCTUAL STEEL, 5-STRUCTUAL STEEL WELDING. SEE PG 01400-4 OF PROJECT MANUAL. Special inspection reports shall be submitted to the Mason County Building Department, PO Box 186, Shelton WA 98584 and available for inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and final occupancy inspections. X 5) A anges in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are removed, approval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and YACONSTRUCTION d by the Mason County Building Department prior to any further inspections being performed or approvals granted. 6) MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND ANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x COM2010-00010 2 of 4 `-1) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work hich may a amour project. X 8) Changes to a,VW2ved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air Quality Code (VIAQ), B ing/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 9) CO RUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE A OPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Buildin I star shall be made prior to requesting additional inspections. X 10) All bu'Iding permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The fai ure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X 11) ermits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X This perm mes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended fora period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWN ER OR AGENT: � DATE: COM2010-00010 3 of 4 M 0 z 9 CONCRETE MECHANICAL MANUFACTURED HOME 0 to I C) ;0 Footings/setbacks Date By Ribbons I? Gas Piping C) C) Interior Date By interior-Date By Date By C) - Exterior Date By Exterior Date By Set-up Cl) > Point Load I Isolated Footings INSULATION Date By 0 BG I SLAB INSULATION z Date By Data By FIRE DEPARTMENT Cl) Foundation Walls 0 Floors Date By M Date BY Data By DECKS 00 FRAMING Walls Date By r- Date By Date PROPANE TANKS 0 Vault Date By C/) PLUMBING I Date By OTHER X Groundwork Attic 0 Date By Date By Type. --I Dale By 0.W.1V DRYWALL Type 0 Int.Brace Wall Date By 0 Date By 9 Date By FINAL INSPECTION N3 Water Line Fire S operation C? Date By Date By Date B y 9 C) Pass or Request Inspect. C?C) Type of Insp. Fail Date Date Done By Comments C) Krazan & ASSOCIATES , INC . " GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION September 10, 2010 Project No.: 106-10101 Mason County Attention: Mr.Mark Core P.O.Box 186 Shelton,WA 98584 RE: Final Letter Regarding Special Testing&Inspection Permit No.: 12208/23/60000 North Mason School District Campus—Hawkins Middle School COM2010-00010 Belfair,WA Dear Mr. Core: In accordance with our client's request and authorization, we have performed special testing and inspection services for the above referenced project.The special inspections for this project were: Special Inspection Required Performed Expansion/Epoxy Anchor Bolts To the best of our knowledge, all work and noted deficiencies have been tested and/or inspected and have been found to be in accordance with the approved plans and specifications. If you have any questions or if we can be of further assistance, please do not hesitate to contact our office at (360)598-2126. Respectfully submitted, KrBowers IATES,INC. J Construction Services Manager Poulsbo Division JMB/md cc North Mason School District—David Peterson With Offices Serving The Western United States 1230 Finn Hill Road NW Ste. A 9 Poulsbo,Washington 98370 9(360)598-2126 9 Fax: (360)598-2127 • K m z-o -i & ASSOCIATES , INC . GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION September 10, 2010 Project No.: 106-10102 Mason County Attention: Mr.Mark Core P.O.Box 186 Shelton,WA 98584 RE: Final Letter Regarding Special Testing& Inspection Permit No.: 12208/23/60000 North Mason School District Campus—Alt A,Admin Bldg. COM2010-00010 Belfair,WA Dear Mr. Core: In accordance with our client's request and authorization, we have performed special testing and inspection services for the above referenced project.The special inspections for this project were: Special Inspection Required Performed Expansion/Epoxy Anchor Bolts To the best of our knowledge, all work and noted deficiencies have been tested and/or inspected and have been found to be in accordance with the approved plans and specifications. If you have any questions or if we can be of further assistance, please do not hesitate to contact our office at (360)598-2126. Respectfully submit , KRAZYBowers CIATES, INC. Jeffrey Construction Services Manager Poulsbo Division JMB/md cc North Mason School District—David Peterson With Offices Serving The Western United States 1230 Finn Hill Road NW Ste.A•Poulsbo,Washington 98370•(360)598-2126•Fax: (360)598-2127 MASON COUNTY PERMIT NO.CO") , `O �tAiddle School Application BUILDING PERMIT APPLICATION �� �� 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670. Belfair (360) 275-4467 • Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner North Mason School Dist # 403 Company Name Not vet selected. Open bid process. Mailing Address 71 E Campus Drive Mailing Address City Belfair State WA Zip Code 98528-8305 City State Zip Code Phone 360-750-7500 Other Ph. Phone Other Ph. Lien/Title Holder Contractor Reg. # Exp. E mail address - E Mail Address Drivers Lie.# DOB Drivers Lic.# DOB SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic Existing Septic Connect to Water System Name of Water System Well Water System Name of Water System PARCEL INFORMATION-12 Digit Parcel No 122082260000 Fire District 5 1 Legal Description See attached Ln Site Address(Please include street name, street number and city) 71 E Campus Drive Belfair WA 98528 !� <a Directions to site See attached hftd LLl � ry Will timber be cut and sold in parcel preparation? Yes/No Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff-Stream Slopes or Bluffs 7 15% '' a Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes No TYPE OF JOB - New Addv e alr Other PRIMARY RF_SIDENCE F1 SEASONAL ❑ Use of Building School Describe Work Add Exterior CMU Veneer No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage Attached --- Detached Carport Attached - Detached MANUFACTURED HOME INFORMATION -Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ Replacement Unit? Yes/No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other parry in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the Information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CObITINLIATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. - Date: ner/ wners Re reseritati /Contractor indicate which one O OFFICIAL USE BEYOND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department pgit Planning Department Environmental Health Department Public Works Department Fire Marshal FEES Building Permit Fee Site inspection Plan Review Fee EH Review Fee Plumbing & Base Fee Planning Review Fee Mechanical & Base fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation$ TOTAL FEES R I MASON COUNTY PERMIT NO. � �tVliddle School Application BUILDING PERMIT APPLICATION t 426 W. Cedar- P.O. Box 186, Shelton, WA 98584 \j Shelton (360) 427-9670- Belfair (360) 275-4467 o Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner North Mason School Dist # 403 Company Name Not vet selected. Open bid process. Mailing Address 71 E Campus Drive Mailing Address City Belfair State WA Zip Code 98528-8305 City State Zip Code Phone 360-750-7500 Other Ph.. _ Phone Other Ph. Lien/Title Holder _ Contractor Reg. # Exp. E mail address - IE Mail Address Drivers Lie.# DOB Drivers Lic.# DOB SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic. . Existing Septic Connect to Water System Name of Water System Well Water System Name of Water System PARCEL INFORMATION-12 Digit Parcel No 122082260000 Fire District No-5 Legal Description See attached Site Address(Please include street name, street number and city) 71 E Campus Drive Belfair WA 28528 Directions to site See attached Will timber be cut and sold in parcel preparation? Yes/No Is property within 200'of Saltwater Lake - River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% Is this Permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes No TYPE OF JOB - New Addv a air Other PRIMARY RESIDENCE SEASONAL ❑ Use of Building School Describe Work Add Exterior CMU Veneer No. of Bedrooms No. of Bathrooms Square Footage-1 st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION -Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ Replacement Unit? Yes/No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that 1 have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CO TIN TION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. x Date, 1—f5- /O er/ wners Re rese_n_Tb /Contractor indicate which one O OFFICIAL USE BEYOND THIS POINT Accepted by. Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Planning Department Environmental Health Department Public Works Department Fire Marshal FEES Buildino Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing& Base Fee Planning Review Fee Mechanical & Base fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation$ TOTAL FEES MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 426 West Cedar Street ♦ PO Box 186 ♦ Shelton,WA 98584 (360)427-9670 EXT. 352 FAX(360)427-7798 HOME PAGE—www.co.masonma.us Special inspection policy Scope: To ensure compliance with all provisions of Local, State and International Building Codes in addition to all jurisdictional policies. Responsible Party: The owner or registered design professional acting as the owners agent is responsible to obtain, and have pre-approved by the jurisdiction, any and all Special Inspection Agencies and/or persons employed by such. Policy: Mason County allows two methods in which compliance may be obtained. Please read the following options carefully when choosing your method of compliance and special inspection agency: []Option I: Registration with WABO (Washington Association of Building Officials) The WABO registration gives the jurisdiction the assurance that the individual and or agency has met certain criteria and that the criteria is maintained. See WWW.WABO.ORG for listing of approved individuals or agencies. gUption II: Mason County will approve an individual or company, to perform inspections upon demonstration of competence for the particular type of construction or operation requiring special inspection. As proof of competence the individual or company will need to conform to all of the following criteria and provide supporting documentation. A.)Provide the name of the individual that will perform the particular type of inspection along with documents demonstrating competency including copies of all certifications and registration numbers pertinent to the inspection type. Examples: (ICC, ICBO,NICET, AWS) WA. State licensed Structural/Civil Engineers or Architects may also be accepted. B.)When laboratory testing and field inspection equipment will be required provide details of specific tests,the quality of the system,procedures to ensure test are performed properly and all policies for recording, reviewing and performing such test. An equipment log must be maintained and available for review. All calibration maintenance records must be traceable to the National bureau of Standards, calibrations must be performed frequently as set up per the standards. C.)When all required information has been submitted staff will review documentation and approve the acceptability of the special inspection competency or request additional information as deemed necessary. Authorization Form: After selecting option I or II please complete the "Special Inspection Authorization" form and submit it to Mason County for initial review. Approved By: Mark Core Date: 10-02-07 15. Smoke-control system. Smoke control systems snall be tested by a special inspector per IBC Section 1704.14. 16. Special cases. Special inspection shall be required for proposed work that is, in the option of the building official, unusual in its nature such as alternative methods and material of construction, unusual design applications, and materials and systems required to be installed in accordance with additional manufacturer's instructions that prescribe requirements not contained in the IBC or referenced standards. Installation of structural epoxies Installation of"high-load shear panels" Structural Observation (IBC1709) Other: Special Inspector Selection: The special inspection agency and special inspector shall be registered by the Washington Association of Building Officials (WABO)for the particular type of construction or operation requiring special inspection. Such inspector(s) shall be selected by the owner or the owner's agent and approved by the Building Official prior to issuance of the building permit. The owner's agent shall not be acting as, or employed by the special inspection agency or the contractor for this project. Name of Special Inspector or Agency: Type of Inspection: Registration Number: �d c� -t,.F of ka'-XIC's �..I0_ �mod. ?-6 — 65A: L .01 Authorization: I hereby state that I am the legal owner of the project property, or that I am the legal owner's agent who is not employed by a special inspection agency or contractor associated with this project. In addition, I agree to comply with the special inspection requirements established by Chapter 17 of the International Building Code as adopted by Mason County. ture l5rinted Name Owner (LqeW Date PURPOSE OF SPECIAL INSPECTION Special inspection is the monitoring of materials and workmanship which are critical to the integrity of the building structure to assure that the approved plans and specifications are being followed and that relevant codes are being observed. Special inspections are in addition to those conducted by the county building inspector and by the engineer or architect of record. Special inspectors furnish inspection at all times that their presence is required by the code, the plans and specifications, and the enforcing jurisdiction. Good communication between the special inspector and the designer, contractor, and building department is essential. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR: Special inspectors are individuals with highly developed, specialized skills who observe those critical building or structural features which they are qualified to inspect. Duties of special inspectors and/or inspection agencies include the following: 1. General Requirements Special inspectors shall review approved plans and specifications for special inspection requirements. Special inspectors shall comply with the special inspection requirements of the enforcing jurisdiction. 2. Signify Presence at Job Site Special inspectors should notify contractor personnel and the enforcing jurisdiction of their presence and responsibilities at the job site. 3. Observe All Work for Which They Are Responsible Special inspectors shall inspect all work and perform or observe all tests requiring inspection and testing for conformance with the building-department-approved (stamped) drawings, specifications and applicable provisions of the code. 4. Notification of Discrepancies Special inspectors shall bring all nonconforming items to the immediate attention of the contractor. If any such item is not resolved in a timely manner or is about to be incorporated in the work, the engineer or architect of record and the building official should be notified immediately by telephone or in person, and the item noted in the special inspector's written report. The special inspector shall write a separate report to be posted at the job site regarding noted discrepancies which should contain, as a minimum, the following information about each nonconforming item: • Description and exact location, • Reference to applicable detail of approved plans/specifications, • Name and title of each individual notified and method of notification, and • Resolution or corrective action. 5. Reports A. Inspection reports The special inspector should complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. These reports should be organized on a daily format and may be submitted weekly at the option of the building official. In these reports, special inspectors should: • Describe inspections and tests made with applicable locations; • List all nonconforming items; • Indicate how nonconforming items were resolved; • List unresolved items, parties notified, and time and method of notification; and • Itemize changes authorized by the architect/engineer of record and approved by the building department, if not included in the nonconformance items. B. Final reports Special inspectors or inspection agencies shall submit a final, signed report to the building department stating that all items requiring special inspection and testing were fulfilled and reported and, to the best of their knowledge, in conformance with the approved design drawings, specifications, approved change orders and the applicable provisions of the code. Items not in conformance, unresolved items or any discrepancies in inspection coverage(i.e., missed inspections, periodic inspections when continuous was required, etc.)should be specifically itemized in this report. DUTIES AND RESPONSIBILITIES OF THE CONTRACTOR: The contractor's duties include responsibility for notifying the special inspector or agency regarding individual inspections required by the Building Department, or required by the International Building Code, Chapter 17. Adequate notice shall be provided so that the special inspector shall have appropriate access to the approved plans at the job site prior to the required inspection. The contractor shall not perform any work that requires special inspection without the special inspector present. Completion of this form, and the performance of special inspections does not relieve the contractor's responsibility to schedule required inspections by the Mason County Building Department prior to concealing any work. DUTIES AND RESPONSIBILITIES OF THE ENGINEER OR ARCHITECT OF RECORD: The engineer or architect of record is responsible for identifying which special inspections are necessary, developing a schedule of required special inspections, and assisting the owner in the selection of the special inspector. The engineer or architect or record shall review the special inspection reports to determine that all required special inspections have been performed and that all discrepancies (if any) have been resolved. DUTIES AND RESPONSIBILITIES OF THE PROJECT OWNER: The project owner, or the engineer or architect of record acting as the owner's agent, is responsible for the funding of all required special inspection activities in accordance with International Building Code Section 1704. 0 ' O cn cn m °o_ v -i z 0 O o m m m o m CD ' 0 � O cn m o N °' 0) o m * 0 -4 m v o CCD CL � o o � � D > r D cn m o w mo 0 � C p � o � o CD mx Z n � � � � m �* i o z -{ =icom -Az D u ; D mm � T rr 0 a -gym OmcnOm o un (n N 0 o w zxcnX x n0 f o O z a y CN� � o O D o m z m ago co O .� .. w � 3 o Qcn o < mo > m � 00 ( C Z 00omzC w Z o oD D � m � -- °' o m = X0 m = � 0 v T c -n cn o n O o 0 O -n „ m 0 3 n CD, G O m o o 0 0 co -i rn m C 71 O v D r Z cc m 0 (0) y z n C o C z o p r C mW co n0 — z z 0 m 3 m o D °n y COrt cc mco ° Z C a CD �•� 3 = CQ p G7 m fl — O 21 D co N 0 7 N fD• O O C N m r CD o CD = - co m 3 m mTO N V (a = N O a N n o < _� m N 2) W S N Z a J Q X O � 3 o 90 O 90 v O O 00 (D C CD B =r O O O 7 v N 7 O n A o `G N (D O' 'D N O O = -Ow N TI p 0 D) O o_ •o 7 fD '. CDN N. p ' 3 m �'cn ' = - mj w ;oO oai CD C. CDan d 0 m m � m m C x (� 0 N (h o j o � Z7CC ) J CDCn o p , N v O .. .. .. _a .s. — C W CD IV N O -CD 0 No o OD O N O O NJ r1i m N x O O � � ri N N O °) Cn � < a N co O 1p o xp > Xo fD o > X � v�i o � '� � o E X � 0 co(a D * 0 o CD Cnn CD o o m cD 0 CD Q allo � : C-0o tn ?. in: � � rv0 m m c w ° '°' °� � rcn '+ Qa m m 3 0 � Dz �U� O-ca vayG) C)� o ° D 0 - ° fDv -I0 cn zZ � `< v m v O-0 m m CD Q 0- °� � � � _n C) -1 a ti � CD cn v m cD � -� � �a � n m p �� ? r' env CD CIO x m C m ° D g .< CA� cnn � ni - ° 5.� O' mCD 0 na) m u, 3 : � Xo � c, In o °' m(QUmpo' n a - -?N-0 °o a ° voz � 0 " Z co ° mmK mc � �C o m a ' Dm� < pc o a � -0 N oN � m o - S .Q 000 o c ° $O c :3 , n 'tv v (mn 15 c ° o CD00 CDQcn cn v pffi a) CD o' D ,�c U) = 0ry cn ° Q- (Do ce � � �crn mvo= m ° oo °O c vmTC/ 0 =r -° Zm Q N ° Qc '� Z - cn Q S p ° cn n - m0 (fl Q m co � Ocn � � _. m co o ° Q CD (DCID ' D v :3 Q cn ° CL ZKX CD v0- -aCL pn v, -0Cnm conic c� Q a) Q- (D - K m O < - cfl' n CD �' °' a CD m m0mrl 3 0 -0 � Q ° D - CD CD o j ° co CD � 0) � Zz 0 5' - � m D � =3 a• m a) CD C � ° a) cn - cn -- n > CzrD- a 0 (� Q- KrOaiI OL a o m ° � v CD, ° (nor o' er � :3 c O zgo00 fD c O= (p' � n m a r -r am (D CD p- � (7 � O cyn 7 CL X K O ° -0 a) ;7 CD , •a (D : O .. � n � � ° 3n mNv, � m3 � o - � Or-- `� 0 p cD a c mo cO - o m� �. CD n y � � < n N ° CD 3 n co MOO � m o- o ° � Waco m a nn CDi CD. 3 � 0z 0m MOO SfD cn ? co D 'CD - CD 0 - � N • (D (D O 3 Q N p -Ur- � coo CD CD 0QQCD Z- = (n : � 0 � c � * o o � o � p u� z o M CD Q ° c =r CD�(Q m � c � m -a -a �cn f D 0 g cn $ cn 05 0 v 0) < CCD � CD a- E 3 � � � � m � CD cn 3'� m a) O CD ai (D 'D -DI m N (D a- Q 3 3 Z cn o O (Q c `2 x 0 z CD Q m m tri m v 3 � � cQ D Ozm 5' � c * `� � comma) -a ° N CD m co co (QfD `nc' 3 � � � < (DOL CD vc D Z a a) 0 ,� -,-a - =• 0- (D o n Oz{ D a, 0 3cQ = co (nQ CD (D XOc o Dm 0 C7 _I o CD O N ° -� 7' O .n-. (Q (D (n -u m Dm0 3 0 =CD a) " C0 * o n �, Q ° � ° v m ZZD C- m P* Q' OD � a) n N vQ'I (SD CD r m �, O r nv ti - a cn cD QCD CD (D CD o - N r (gyp a) N to Z) O= o x OT0 3 � � m $ (n � Q. v m n � • ° Cm O< ?. � O cn m 7 (o n Q. � O- .n-« Q 7 7 3 m c o ° 'gym ,� cr CD a, a sv n m cn c p p (0 3 co co cn C) = Z) n 3 (con c cn „ , m . j v� a CD � m Om mn 00 ° m mc Q (D InC V7 n -0 (D n m = (Q -0, a) cD a a �3 A , T -zl N CD Q v cn K a " O O =3 5' > zD m v. D a.m cn° � N N v 0 r 7 > CD C - O O N V D c n c m c p .0a) cn a0 O m cDw :3 O 0 =3 3 N N c (Q CDQ (Q r c� = Z n cr-p (n r 0 o QcnCD 0 cD3 o0 ° w QN ° Q" 6 0 (D j N (Q' COD CD �< �< ,� 0 n � , v m p 0 =r v v p N 3 y O< Q O �(li o X D XwD oDn X 0 - o o No o _ v mm0 vo D CD m5m -0 � E c � (D� m � p mck 0 boo o (o CO ONO nc (n 0 0p(no � 3 = cm m N C m : 0mQ� (O c o °m 3 (n • nX 0 3 v o 0 - o W -00 m 0 m0 m g 0 O � 0X m CD m = m = m a o c 3 co F0 c D cna ;4 : Z Do O < o oN0 0 �"O 5 m CL 0O m N W m CD aN M=' o a -a (n a) - 0 0 c0c(amaaj1) < N mco -b 3 = "< m 0 0) :3 O- O CL O m lA mooN a) (D m m � j 0 CD co : oyN - Xz :3 a- v - CD .1 CDmo 0 a 3 0FDr Q o m ( 3 F ° m m m n) o m � CD m0 a Oa)j n -0 6 CD n O O n mo a) CDo (ON. vo -0 m � m c0m � � � (0 (u �' (- m m -� �) to 0 a 0 cu 0m � m = � sv30 0 m m e 3 no o m 3 n w �' o camcl O 0 o - . o � O- a Q j n n O - °) O v1 O ' s �,' 02 mu) o CT n � v3 iD � nCDo CD = C no m c �(a � c o � � N �oco 0- � 3 0m � C� off' � mvm0 = g - o _ a �. a CD = -0 m m 0 � noi �1 ,0� 0 o ms � o A :3=rW -0 CD p �' m = nmQOm vim ? v3 m � (a CD0- :3 (Ni, oO o3 c� w N z@ v c = CL CO -0 D v no 0 0 �. m v o-0 _ - cn o m ° m , : m 0 o cfl ncr m 0 m m ' 3 � � Oo 3 � 0c � m � � my ° O3= � 3 � - cr p � � � � ma, cn5 m = ' � �' � � m CD CD aim 0 ? (n m -Zjm 8. o a 00 O z N .-. O X v = o CD ? � pw m :3 mc m � o 00 m m X '= =. 0m n = C %U0 � °° v � 3 0 � s18 � > > 0 c° o !=,Z:3 D <CD v � m � o 00 = s@ 0m v � 3 c/) cn b- D > jcn 1 _ _ - 0• 0 0 o n 0 Doo z m y �. mC� O 0 o c .moo. m > > < 0 c l< c 0• C (zr CYmQm 0 = 0' m 0 3 m . m 0 0- O ai m 5' u� °). m o o v � <CD !R : (n � � 0 (a C cn = cnZT n=i s = o m ` O `D cn co0 Cr CD n CD o Z °) (O O m m m O— O CD N = 0 0 0 0 -0 a- C _ m � m m N. y. CCD N 0- a(o c=3 W of m O -» cn N CD mm o = � 3 C O 0 CD 11 y _0 � n °« a o 3m r m cn 0 o n_0 CD O m m n � 0 O C � _. 3 ' ma cn m Z < � (030n ? � CD Cr CD c o � � m m D G) am m m m m c a fD O m 3 cn —Xv CD C7 -' : Q (n O CD - CO0. S j O O= m M.O < n N m O to c C: �CD 0 � m M D - 7 ° p � n a0 � = n C cn(Q o . N n 0 a) 0 0 0 0 �. O o m 0 = O 0-0 _ 0 m cn = 0 O= 0 ? N 0 A m o m � o m (n z .. (n 0 w CD y o N. 0 cn � 3 (D 3 n = v c (n c oCL m m3 � � -0 CA z o � o `0° mz m 3 '< m m o � cnx �' or p 3Q 3CD CD - � O 0 CD 0) (� - w � m' � o . 00 � l< m D m - O Qo� mO m -0 o om 03 0 - < -N (n3 ((-n > > m o3 -I CD mmm � �' w o m m � � o v O � (n•