HomeMy WebLinkAboutBLD21385 Final Carport - BLD Permit / Conditions - 1/7/1988 Shorelines: Plumbing:
Setback: Mechanical :
Special Interior:
Conditions:
MobileHome:
Smoke Detector:
Remarks:
Footing:
Setback:
Foundation
Walls:
Framing:
Fireplace:
Wood Stove:
TYPE CARPORT
'i Permit No. 21385 No. Floors Sq Ftg 384
Owner NASH, Eugene Tel839-0242 Date 1-7-88
Address 31034 20th Ave So Federal Way Zip
Contractor None
Address Zip
Legal Description Timberlakes Div 1 Lot 234
Direction to project site To Timberlakes en an go 1
block to Lake Shore Dr. ,, turn right to Agate Dr. .left_
to E 300 Agate Dr.
Plumbing Mechanical Sewer Wood Stove
Fireplace Deck Garage Carport -1,94
Basement Loft Other
`I
i
'jl
r
BUILDING PERMIT APPLICATION
MASON COUNTY 1
DEPARTMENT of GENERAL SERVICES
P.O. BOX 186 SHELTON, WASHINGTON 98584
427-9670 DATE ISSUED s/
PERMIT NO>;'�{
OWNER NAME MAILADDRESS CITY&STATE ZIP PHONE
e --1-�/,a egg C 3 a?.o g So �(,eder4 W l;- &d, 9Aq3 t-831-ewj0
DIRECTIONS S e/7o--n look 0-~ 0-c/A6.3 `f 4Te S)qr,
TO JOB SITE tb Oq ab- P4."a 1 e Yd,6- e,,r-,;t- qjq I 41F A". A,�,
a r-
PARCEL LEGAL �y�,,6-evL?n�w� kk/
NUMBER 41?0 /J'-•SO-pO 3 DESCR.
NAME MAILADDRESS CITY&STATE LICENSE NO. ZIP PHONE
CONTRACTOR
USE OF
BUILDING
CLASS OF NEW ADDITION ALTERATION REPAIR MOVE REMOVE
WORK r
DESCRIBE
WORK Pdh� I A e X 3A /
BEDROOMS DECKS CARPORT NOTICE
SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR
BATHROOMS TOTAL SO.FT. GARAGE CONDITIONING.
NO.OF STORI ES _ BASEMENT ATTACHED THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT
COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
TOTAL SO.FT. FIREPLACE DETACHED ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK IS COMMENCED.
PERMANENT_X SHORELINE (�
SEASONAL Z1'
M
FIDAVIT CONTRACTORS AFFIDAVIT
T I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF
LAW RCW 18.27,AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE
FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
NCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING
ROVAL FROM THE BUILDING DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTMENT.
DATE 'l SSf, XBY DATE
FOR OFFICE USE ONLY
DEPARTMENT YES NO APPROVED DEPARTMENT YES NO APPROVED BUILDING VALUATION - 00
HEALTH PUBLIC WORKS FEE
PLANNING FIRE BUILDING PERMIT S
D.O.T. BUILDING PLAN CHECK , '�5
SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION
00- "i DO SHORELINE
WOODSTOVE
PLUMBING
MECHANICAL
STATE BUILDING FEE
• STATE SURCHARGE '
APPLICATION ACCEPTED BY �713 PERMIT VALIDATION MOTOTAL
00
e
s 1
_ P
IQ
?o li::Ivtom' J�ld-4S
�n o
, I v
f- 2'1
e�
PP o
y
A.
Ir
p
P I C lip -� r=
•�CD
1