HomeMy WebLinkAboutBLD2007-00941 Final SFR - BLD Permit / Conditions - 6/19/2009 W
o CONCRETE MECHANICAL MANUFACTURED HOME D
0
Footings 1Setback* IDat Piping Ribbons z
c Interior Date By Interior-Date By Date 13y I_
Exterior Data By Exterior-Date By Set-up G)
Point Load I IsolatedIsolatedFootings INSULATION 1;3ste By
Btu(SLAB INSULATIONDate By Data By FIRE IMPARTMENT X
Foundation 1M1talls Floors data By
Date By Date By DECKS
FRAMING waft Date By
Date By Data By PROPANE TANKS
PLUMBING Vault Date By
Date By OTHER
Groundwork Atdc
Type:
Date By Dana ..-.-.. By Date By
W D Y DRYWALL Date
Int Brace Wall Date By
W
Date Byp By FINAL INSPECTION p
v
�i Water Line Fire Sops ration N
Cute By Date By Date ��.7-C� B v
Pass or Request Inspet. c
Type of Insp, Fail Date Date pone By Comments
d
CD
m
N
O
8
ZY
7
N
O
CD
CD
a:
0