Loading...
HomeMy WebLinkAboutFIR Combine Domestic and Fire Suppression Water Potable Water System - FIR Application - 3/24/2009 MASON COUNTY PERMIT NO. BUILDING PERMIT APPLICATION 426 W. Cedar• P.O. Box 186, Shelton, WA 98584 Shelton (360)427-9670• Belfair(360)275-4467• Elma (360)482-5269 On the web www.co.mason.wa.us APPLICA T NF R TI CONTRACTOR IN OR ATIO Owner t ' Company Name G7' llrIGG3� Mailin Address 6 Mailing Address City State Zip Code City State Zip Code Phone t1VOther Ph. Phone Other Ph. Lien/Title Holder Contractor Reg. # Exp. E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic X Connect to Water System Name of Water System Well X Water System Name of Water System PARCEL INFORMATION-12 i it Parcel Now ! Fire District Legal Description Site Address(Please include s ee name,street number and city) � l Directions to site " ed Will timber be cut and sold in parcel preparation?Yes 1s property within 200'of Saltwater Lake River/Creek A Pond Wetland Seasonal Runoff Stream Slopes or Bluffs ? 15% Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB-New Add Al=Repair Other P MARY RESIDENC EASONAL ❑ Use of Building Describe Wo / /011 No. of Bedrooms No.of Bathrooms Square Footage- 1st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION-Make Model Year Length Width Serial No, No.of Bedrooms No. of Bathrooms Type of Heat Purchase Price$ Replacement Unit? Yes/No Installer Name Certification No. OWNER/BL&DER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.if pent ssion is required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information provided is accurate and grants er p4ees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTINUA ON OF WORK IS BY MEANS OF A PROGRFSS INSPECTION. Owner/Owners a resentative/Contractor indicate which one FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Planning Department Environmental Health Department Public Works Department Fire Marshal FEES Building Permit fee Site Inspection Plan Review Fee EH Review Fee Plumbing&Base Fee Planninq Review Fee Mechanical&Base fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation$ TOTAL FEES EL. THIS PAR C- INCLUDES PLANS, BLUEPRINTS OR OVERSIZE I MAGES LARGE FORMAT IMAGES HAV E BEEN. STORED IN FILE CABINET(S) UNDER ------------- PA-,R.-CE-* L- . lJM�€R - ---- PARCEL # CASE # 1218 T'Avenue,Rm.380 Seattle,WA 98101 TEL 206.282.8245 March 24,2009 FAX 206.283.0895 Mason County Fire Marshal Office www.freemanfong.com PO Box 186 Shelton,WA 98584 ATTN: Larry Waters RE: Mason County Permit Application Project: Water System Improvements Mission Creek Corrections Center For Women(MCCCW) Belfair,Washington Dear Larry: As you requested in our phone conversation on 3/2/09,I am mailing to you (2) 24"x36" signed drawing sets for you to review along with the building permit application. The scope of the project is to combine the domestic and fire suppression water using only the existing 225,000 gallon standpipe at the Mission Creek Corrections Center for Women. For your review,I've also attached the signed letter our office received from Craig Haugen,Fire Marshal approving the combination of the domestic and fire suppression water. Construction for the gymnasium fire sprinkler and alarm system mentioned at the end of the attached letter is scheduled to be completed by 9/30/09. If you have any questions,please do not hesitate to contact me. Thank you. Sincerely, FREEMAN FONG ARCHITECTURE,PS Kevin Kobayashi,Project Coordinator Ills F��ONG Architecture I MASON COUNTY FIRE MARSHAL DEPARTMENT OF COMMUNITY DEVELOPMENT ' PC) BOX 186 SHELTC3N WA 98584 (360) 427-9670 EXT 273 CODE La UVRCMWNT r%1M 1MPECWGNS ME LWESITGA470N PtMLIe EDUCATION x s d -..._-.._.._...._._. ..._.................. ._.. ,......_._.___.. January 23, 2009 Washington State Department of Corrections Administrative:Se►vic s Division CAPITAL PROGRAMS PO Box 4111E Olympia,WA 98504-1112 ATTN: Edward L. liampton, P.E., Project Manager RE: Letter of A.nproval to Combine Domestic and Fire Suppression Water Potable Water System Project MISSR)N CREEK CORRECTIONS CENTER FOR.WOMEN (MCGCW) l5elfair, Washington Agreement No.. 08.303 Dear Mr. Hampton: This letter is ii, rea::ponse to the Potable Water System Project located at the Mission Creek Corrections Center for Women (MCCCW) in Belfair, Washington. The scope of vroril:for the project is to combine the domestic and fire suppression water using only the existing 225,000-gallon standpipe at the site. In discussions with Freeman Fong Architecture (FFA), i have stated that we wa uld allow"nesting"of the domestic and fire suppression water if all the existing buildings on campus are equipped with fire sprinklers and alarms. Currently, the existing gymnasium structure is the only monitored building on carnpus without a brie sprinkler and full alarm system. it is our understanding the Department of Corrections (DC)Q has already secured funds to install a fire alarm and sprinkler system in this building, Furthermore, review of the Equalizing, Standby Storage, and the fire flow calculations, using the"Mason County Standard Form for the Calculation of Required Fire Flow", shows the existing 22.5,000 gallon standpipe is s,fffic ent for the domestic and fire suppression water at the MCCCW. This appears to be adequate prov de(.i all buildings are fully fire sprinklered and fully alarmed per NFPA 13 and NFPA 72 Therefore, accept this letter as our approval to"nest"the domestic and fire suppression water using the 225,000 gallon Ste ndpipe with the condition that the existing gymnasium's fire sprinkler and alarm system is completed try December 31, 2009. Si y, Craig Ha e FIRE MARS L ate. �... a May 11 09 03: 04p FREEMAN FONG ARCHITECTURE (2061 283-0895 p. 1 FxEEMANFONG Architecture 1218 3`d Avenue,Ste.380 Seattle,WA 98101 Tel: (206)282-8245 Fax: (206)283-0895 FAX Date: 5/11/09 No. of Sheets (including Cover): 2 To: Larry Waters From: Kevin Kobayashi,Project Mana eg r Office: Mason County Office: Freeman Fong Architecture Project: Water System Improvements Tel: (206)282-8245 Tel: Fax: (206)283-0895 Fax: (360)427-7798 Remarks: Larry, The domestic pump location is shown on the attached. The well gets water into the tank through the same pipe that connects the elevated tank to the standpipe. That 6-inch is the domestic connection. Please call me anytime if you have questions. Thanks. This message is for the named person's use only. No confidentiality or privilege is waived or lost by any mis-transmission.You must not,directly or indirectly,1 e, disclose,distribute,print, or copy any part of this message if you are not the intented recipient. If you receive t is message in error,please immediately delete it and all copies of it from your system,destroy any hard copies of and notify the sender. i� i i j 2 i I May 11 09 03: 05p FREEMAN FONG ARCHITECTURE (20G) 283-0895 p. 2 x x J Li. X x x O '� J LLt LL- W LL J LA- x x of z - -ii v ^ O Q 0- j lJi Li Z J m z cr- Y Ld Y W O h rn � �O � 0 U lam!) 0 W C*4 N IL=Ld I � 01 1 0 U F- W N_ 0 V t 7 st W a to O Z t=- N W LLI N N p� 2 05/11/2009 15:58 FAX 360 427 7798 MASON CO PERMIT CTR Q 001 �c RX REPORTsc RECEPTION OK TX/RX NO 6168 CONNECTION TEL 206 283 0895 CONNECTION ID ST. TIME 05/11 15:57 USAGE T 00'53 PGS. 2 RESULT OK I Apr 01 09 02: 40p FREEMAN FONG ARCHITECTURE (206) 283-0895 p. 1 FREEMANFONG Architecture 1218 Yd Avenue,Ste.380 Seattle,WA 98101 Tel: (206)282-8245 Fax: (206)283.0895 FAX Date: 4/1/09 No. of Sheets (Including Cover): 2 To: Genie McFarland From: Kevin Kobayashi,Protect Coordinator Office: Mason County Permit Center Office: Freeman Fong Architecture Project: Water System Improvements Tel: 206 282-8245 Tel: Fax: 206 283-0895 Fax: (360)427-7798 Remarks: Genie, Attached please find the approximate project estimate for the MCCCW Water System Improvements Project. Please forward this letter to Larry Waters at Mason County. Thank 3 vu- This message is for the named person's use only. No confidentiality or privilege is waived or lost by any mis-transmission.You must not,directly or indirectly, disclose,distribute,print,or copy any part of this message if you are not the intented recipient. If you receive t s, message in error,please immediately delete it and all copies of it from your system, destroy any hard copies of'I and notify the sender. Apr 01 09 02: 40p FREEMAN FONG ARCHITECTURE (206) 283-0895 p. 2 12 T1 Avenue,ste_380 Se tle,WA98101 06.282.8245 April 1,2009 FAx 06.283.0895 Mason County Permit Center 426`Vest Cedar Streeet ww Ureemariong.com Shelton,DX'A 98584 ATTN: Genie McFarland RE: Project Estimate 11,•iCCCW Water System Improvements Agreement No.08-303-B Dear Mrs.McFarland, This is regarding your request for the Project Estimate for the MCCCW Water System Improvements Project out at the Mission Creek Corrections Center for Women. The Project Estimate is approximately$82,000. Please forward this letter to Larry Waters at Mason County. Please note that the information contained in this letter is confidential. The project is currently in the bidding phase and we are scheduled to have a bid opening on April 30,2009_ If you have any questions,please don't hesitate to contact me. Thank you. Sincerely, I{evin Kobayashi,Project Coordinator FREE. ONU Ar�chit tore