HomeMy WebLinkAboutFIR Combine Domestic and Fire Suppression Water Potable Water System - FIR Application - 3/24/2009 MASON COUNTY PERMIT NO.
BUILDING PERMIT APPLICATION
426 W. Cedar• P.O. Box 186, Shelton, WA 98584
Shelton (360)427-9670• Belfair(360)275-4467• Elma (360)482-5269
On the web www.co.mason.wa.us
APPLICA T NF R TI CONTRACTOR IN OR ATIO
Owner t ' Company Name G7' llrIGG3�
Mailin Address 6 Mailing Address
City State Zip Code City State Zip Code
Phone t1VOther Ph. Phone Other Ph.
Lien/Title Holder Contractor Reg. # Exp.
E mail address E Mail Address
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic X
Connect to Water System Name of Water System
Well X Water System Name of Water System
PARCEL INFORMATION-12
i it Parcel Now ! Fire District
Legal Description
Site Address(Please include s ee name,street number and city) � l
Directions to site " ed
Will timber be cut and sold in parcel preparation?Yes
1s property within 200'of Saltwater Lake River/Creek A Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs ? 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB-New Add Al=Repair Other P MARY RESIDENC EASONAL ❑
Use of Building Describe Wo / /011
No. of Bedrooms No.of Bathrooms Square Footage- 1st Floor 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq.ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION-Make Model Year
Length Width Serial No, No.of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/No
Installer Name Certification No.
OWNER/BL&DER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.if pent ssion is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants er p4ees of Mason County access to the above described property and structure for review and inspection.
PROOF OF CONTINUA ON OF WORK IS BY MEANS OF A PROGRFSS INSPECTION.
Owner/Owners a resentative/Contractor indicate which one
FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
FEES
Building Permit fee Site Inspection
Plan Review Fee EH Review Fee
Plumbing&Base Fee Planninq Review Fee
Mechanical&Base fee Other
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal
Valuation$ TOTAL FEES
EL.
THIS PAR C-
INCLUDES
PLANS, BLUEPRINTS
OR OVERSIZE
I MAGES
LARGE FORMAT
IMAGES HAV E BEEN. STORED IN
FILE CABINET(S) UNDER
------------- PA-,R.-CE-* L- . lJM�€R - ----
PARCEL #
CASE #
1218 T'Avenue,Rm.380
Seattle,WA 98101
TEL 206.282.8245
March 24,2009 FAX 206.283.0895
Mason County Fire Marshal Office
www.freemanfong.com
PO Box 186
Shelton,WA 98584
ATTN: Larry Waters
RE: Mason County Permit Application
Project: Water System Improvements
Mission Creek Corrections Center For Women(MCCCW)
Belfair,Washington
Dear Larry:
As you requested in our phone conversation on 3/2/09,I am mailing to you (2) 24"x36" signed
drawing sets for you to review along with the building permit application. The scope of the
project is to combine the domestic and fire suppression water using only the existing 225,000
gallon standpipe at the Mission Creek Corrections Center for Women.
For your review,I've also attached the signed letter our office received from Craig Haugen,Fire
Marshal approving the combination of the domestic and fire suppression water. Construction
for the gymnasium fire sprinkler and alarm system mentioned at the end of the attached letter is
scheduled to be completed by 9/30/09.
If you have any questions,please do not hesitate to contact me. Thank you.
Sincerely,
FREEMAN FONG ARCHITECTURE,PS
Kevin Kobayashi,Project Coordinator
Ills
F��ONG
Architecture
I
MASON COUNTY FIRE MARSHAL
DEPARTMENT OF COMMUNITY DEVELOPMENT
' PC) BOX 186 SHELTC3N WA 98584 (360) 427-9670 EXT 273
CODE La UVRCMWNT r%1M 1MPECWGNS ME LWESITGA470N PtMLIe EDUCATION
x s d
-..._-.._.._...._._. ..._.................. ._.. ,......_._.___..
January 23, 2009
Washington State Department of Corrections
Administrative:Se►vic s Division
CAPITAL PROGRAMS
PO Box 4111E
Olympia,WA 98504-1112
ATTN: Edward L. liampton, P.E., Project Manager
RE: Letter of A.nproval to Combine Domestic and Fire Suppression Water Potable Water System Project
MISSR)N CREEK CORRECTIONS CENTER FOR.WOMEN (MCGCW) l5elfair, Washington
Agreement No.. 08.303
Dear Mr. Hampton:
This letter is ii, rea::ponse to the Potable Water System Project located at the Mission Creek
Corrections Center for Women (MCCCW) in Belfair, Washington.
The scope of vroril:for the project is to combine the domestic and fire suppression water using only the
existing 225,000-gallon standpipe at the site. In discussions with Freeman Fong Architecture (FFA), i have
stated that we wa uld allow"nesting"of the domestic and fire suppression water if all the existing buildings
on campus are
equipped with fire sprinklers and alarms. Currently, the existing gymnasium structure is the only monitored
building on carnpus without a brie sprinkler and full alarm system. it is our understanding the Department
of Corrections (DC)Q has already secured funds to install a fire alarm and sprinkler system in this building,
Furthermore, review of the Equalizing, Standby Storage, and the fire flow calculations, using the"Mason
County Standard Form for the Calculation of Required Fire Flow", shows the existing 22.5,000 gallon
standpipe is s,fffic ent for the domestic and fire suppression water at the MCCCW. This appears to be
adequate prov de(.i all buildings are fully fire sprinklered and fully alarmed per NFPA 13 and NFPA 72
Therefore, accept this letter as our approval to"nest"the domestic and fire suppression water using the
225,000 gallon Ste ndpipe with the condition that the existing gymnasium's fire sprinkler and alarm system
is completed try December 31, 2009.
Si y,
Craig Ha e
FIRE MARS L
ate. �...
a
May 11 09 03: 04p FREEMAN FONG ARCHITECTURE (2061 283-0895 p. 1
FxEEMANFONG
Architecture
1218 3`d Avenue,Ste.380
Seattle,WA 98101
Tel: (206)282-8245
Fax: (206)283-0895
FAX
Date: 5/11/09
No. of Sheets (including Cover): 2
To: Larry Waters From: Kevin Kobayashi,Project Mana eg r
Office: Mason County Office: Freeman Fong Architecture
Project: Water System Improvements Tel: (206)282-8245
Tel: Fax: (206)283-0895
Fax: (360)427-7798
Remarks:
Larry,
The domestic pump location is shown on the attached. The well gets water into the tank
through the same pipe that connects the elevated tank to the standpipe. That 6-inch is the
domestic connection.
Please call me anytime if you have questions. Thanks.
This message is for the named person's use only.
No confidentiality or privilege is waived or lost by any mis-transmission.You must not,directly or indirectly,1 e,
disclose,distribute,print, or copy any part of this message if you are not the intented recipient. If you receive t is
message in error,please immediately delete it and all copies of it from your system,destroy any hard copies of and
notify the sender.
i�
i
i
j
2
i
I
May 11 09 03: 05p FREEMAN FONG ARCHITECTURE (20G) 283-0895 p. 2
x
x
J
Li.
X
x x O '� J
LLt LL- W LL J LA-
x
x
of z
- -ii v
^ O Q 0- j lJi
Li Z
J
m z cr- Y Ld
Y W O
h rn � �O �
0 U lam!)
0
W
C*4 N
IL=Ld
I
� 01 1 0
U
F- W N_
0 V
t 7 st W
a
to O
Z
t=-
N W LLI
N N
p� 2
05/11/2009 15:58 FAX 360 427 7798 MASON CO PERMIT CTR Q 001
�c RX REPORTsc
RECEPTION OK
TX/RX NO 6168
CONNECTION TEL 206 283 0895
CONNECTION ID
ST. TIME 05/11 15:57
USAGE T 00'53
PGS. 2
RESULT OK
I
Apr 01 09 02: 40p FREEMAN FONG ARCHITECTURE (206) 283-0895 p. 1
FREEMANFONG
Architecture
1218 Yd Avenue,Ste.380
Seattle,WA 98101
Tel: (206)282-8245
Fax: (206)283.0895
FAX
Date: 4/1/09
No. of Sheets (Including Cover): 2
To: Genie McFarland From: Kevin Kobayashi,Protect Coordinator
Office: Mason County Permit Center Office: Freeman Fong Architecture
Project: Water System Improvements Tel: 206 282-8245
Tel: Fax: 206 283-0895
Fax: (360)427-7798
Remarks:
Genie,
Attached please find the approximate project estimate for the MCCCW Water System
Improvements Project. Please forward this letter to Larry Waters at Mason County. Thank 3 vu-
This message is for the named person's use only.
No confidentiality or privilege is waived or lost by any mis-transmission.You must not,directly or indirectly,
disclose,distribute,print,or copy any part of this message if you are not the intented recipient. If you receive t s,
message in error,please immediately delete it and all copies of it from your system, destroy any hard copies of'I and
notify the sender.
Apr 01 09 02: 40p FREEMAN FONG ARCHITECTURE (206) 283-0895 p. 2
12 T1 Avenue,ste_380
Se tle,WA98101
06.282.8245
April 1,2009
FAx 06.283.0895
Mason County Permit Center
426`Vest Cedar Streeet ww Ureemariong.com
Shelton,DX'A 98584
ATTN: Genie McFarland
RE: Project Estimate
11,•iCCCW Water System Improvements
Agreement No.08-303-B
Dear Mrs.McFarland,
This is regarding your request for the Project Estimate for the MCCCW Water System
Improvements Project out at the Mission Creek Corrections Center for Women. The Project
Estimate is approximately$82,000. Please forward this letter to Larry Waters at Mason County.
Please note that the information contained in this letter is confidential. The project is currently
in the bidding phase and we are scheduled to have a bid opening on April 30,2009_ If you have
any questions,please don't hesitate to contact me. Thank you.
Sincerely,
I{evin Kobayashi,Project Coordinator
FREE. ONU
Ar�chit tore