Loading...
HomeMy WebLinkAboutBLD5144 Final Mobile Home - BLD Permit / Conditions - 11/18/1976 BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 ` DATE ISSUED / �� t/ PERMIT NO. OWNER ME MAI ADDRESS CITY&STATE ZIP PHONE DIRECTIONS jI of E',Gf:9�ip Qy�+tj TO JOB SITE Cti;�C LEGAL I (❑ SEE AIVACHED SHEET) DESCR. Oj CONTRACTOR NAME MAIL ADDRESS CITY&STATE LICENSE NO. PHONE USE OF BUILDING Class of work: NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work n Valuation of work: $ PLAN CHECK FEE PERMIT FEE o�G 0 0 SPECIAL CONDITIONS: LIGATION EPTED BY PLANS CHECK BY AP O�ISSUANCE Type of Occupancy Division B Const. Group Size of Bldg. No. of Max. (Total) Sq. Ft. Stories Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor in RESIDENCE the State of Washington and I am aware of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. Firm PUBLIC WORKS BY ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, of the Mason County ordinance requirements for VENTILATING OR AIR CONDITIONING. which this permit is issued and that all work done will be In conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS 1 SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owned �&2�'X�ate. ig — WORK IS COMMENCED. PL HECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH r #5144 Halvorson, D. R. II-5-76 W 2851 ' SE4 SE4 20-23-1 N. Belfair Barn Mobile Home MAYYMlMiiw�� wrrrr�Y�YIY ... f� P i I _�.__ IF \V., � �� a n,� 1� R �� ti 'Ili r J V d-� 1'\ �� �IIY