HomeMy WebLinkAboutGeological Site Assessment - GEO General - 10/15/2001 DTANNING
GEOLOGICAL SITE ASSESSMENT
Prepared for:
Mr. and Mrs. Scott Trammell
Prepared by:
Craig K. White, Inc.
Geosciences Consulting
P.O. Bog 3398
Silverdale, Washington 98383
October 15, 2001
hite,Inc
1GG0k&S C wsumma
41
Table of Contents
Property Location and Description 1
Topography and Drainage 2
Vegetation 3
Geology and Ground Materials 4
Slope Stability 6
Seismic Hazards 7
Conclusions and Recommendations 7
Summary and Limitations 10
Appendixes:
Location Map Appendix 1
Potential Seismic Hazards Appendix 2
Detail: Area of Study Appendix 3
CERTIFIED PROFESSIONAL GEOLOGIST CRAIG K. WHITE, INC. CERTIFIED:AAPG
AIPG: 2671 GEOSCIENCES CONSULTING DIVISION OF ENVIRONMENTAL
GEOSCIENCES
October 15,2001
GEOLOGICAL SITE ASSESSMENT
Tax Parcel# 12230-75-00200
Tract 20 of Survey 2/108
Section 30, T22N, Rl W W.M.
Mason County, Washington
Property Location and Description:
The Subject property is located on East Sherwood Hills Rd., near the community
of Allyn, Washington, where it occupies a portion of the uplands and west-facing hillside
slopes between Case Inlet and the Hood Canal. The property is bounded on the north,
south and west by other private lands, and on the east by East Sherwood Hills Rd.
Property size is approximately 250,000 s.f or about 5.7 acres. A Location Map, Seismic
Hazards Map, and Detail Plat showing drainage and slope features within the area of study
are included with this report as Appendixes 1, 2 and 3, respectively.
Access to the subject property is from State Highway 3 onto Sherwood Creek Rd.
to E. Sherwood Hill Rd. for a distance of approximately %2 mile. Thereupon, left on an
unnamed gravel road for a distance of 0.2 miles to the subject property.The property
slopes gently to the northwest and has been cleared of vegetation to the base of the slope.
No existing structures are currently located on the property, however, a proposed building
P.O. BOX 3398,SILVERDALE,WA 98383(360)830-0718
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
site has been staked along the upper part of the slope and a location for the proposed
drainfield was identified with flagging at the base of the slope. Three soil log test pits were
also open for examination at the time of this site visit.
Topography and Drainage:
Drainage on the subject property is generally to the southwest, from the top of the
slope along E Sherwood Hill Rd., toward a broad bench at the base of the slope. Minor
components of drainage also occur to the north in several areas near the toe of the slope
(see Appendix 3, Detail, Area of Study).
Slope angles were measured at several locations on the subject property using a
Brunton hand clinometer and laser-sighting device. On the southwest-facing slope,
measured slope angles ranged from 19 degrees, immediately below the proposed building
site, to as much as 21 degrees(on the roadway near the north property line). Slope angles
flattened to as little as 5 degrees above the top of the slope near the east property line and
to less than 3 degrees at the base of the hill.
This site investigation was conducted in early fall during a relatively dry period and
2
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
no seeps or springs were noted along the slope face. Several areas along the slope showed
evidence of minor erosion from surface water runoff resulting from rainfall that had
occurred since the area was cleared of vegetation, underscoring the need for good water
management as a part of the development plan.
Vegetation:
Large-growth vegetation on the subject property consists of conifers(Douglas fir,
Western red cedar and Western hemlock) as well as several varieties of broadleaf trees
(Red alder, Bigleaf maple and willow). Lower-growth plants include Swordfern, Salal,
Oregon grape, Red and Black huckleberry, vine maple and Himalayan blackberry.
Natural vegetation on the northwest-facing slope in the vicinity of the subject
property is well-developed with a dense understory of lower-growth plants consisting of
species that generally reflect the presence of well-drained soils. Vegetation in the area of
the proposed building site has been cleared and the stumps and root systems of trees and
plants removed in preparation for site development. Because of the present, exposed
condition of the surface soils and their vulnerability to erosion, we recommend that
landscaping or replanting of the slope be undertaken as early in the construction phase as
possible.
3
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
Geology and Ground Materials:
A review of existing geologic maps of the area(Molenaar, Deeter and others)
indicates the geologic units present in the vicinity of the subject property are glacial and
interglacial deposits of Quaternary age, most of which are less than 20,000 years old. The
oldest geologic unit within the area of study is the Esperance (Colvos) sand, a sequence of
fluvial sands and interbedded gravels with occasional lenses of clay, and a basal"blue clay"
(sometimes mapped with the underlying Kitsap formation). The unconsolidated nature of
the Esperance sands makes them highly vulnerable to surface erosion where exposed along
steep coastal bluffs in the Puget Sound region, Also, their high porosity and permeability
readily admits water which may build up on the surfaces of clay lenses within and at the
base of the unit, sometimes increasing pore pressures to the point that the sand grains
become unstable and occasionally resulting in deep-seated slope failures. Esperance sands
commonly achieve thicknesses of up to 30 feet and the unit may serve as a primary aquifer
where it occurs below the water table.
The upland portion of the study area is capped by the Vashon till, a layer of
compact cobbles and coarse sand in a binder of clay and silt that commonly ranges from a
few feet to as much as 100 feet in thickness. This unit is comprised of materials deposited
directly beneath a massive layer of glacial ice that once overrode the Puget Sound region.
4
Geological Site Assessment
Mr.And Mrs. Scott Trammell
October 15, 2001
In many places, the weight of the ice lobe compacted these sediments into a concrete-like
mixture that is almost always impermeable, but considerably more resistant to erosion than
the underlying, unconsolidated sands and gravels.
Examination of the ground materials in the vicinity of the subject property supports
the above geologic interpretation. Exposures of buff-colored sand (Esperance sands)
occur in a broad roadcut along East Sherwood Hill Rd. These sands are capped at the top
of the hill with a reddish-brown, poorly-sorted mixture of cobbles, sand, silt and clay
(Vashon till).
At the subject property, three open soil log test pits reveal the soil and subsoil
ground materials to depths as great as 60 inches. The soil materials are principally
unsorted, weakly-consolidated, tan to reddish-brown, cobbly to pebbly, sandy loam,
typical of glacially-derived soils.Near the base of the pits, the soils become well-indurated
as they transition downward into hardpan.
The principal soil type in the area of the subject property is Alderwood gravelly
sandy loam, 5 to 15 percent slopes (Ab). This is the most extensive soil of the Alderwood
series. In undisturbed areas, the surface soil consists of a friable, brown, medium acid,
gravelly, sandy loam 8 - 13 inches deep. Below the surface soil, to depths ranging from 18
5
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
to 24 inches, is a pale brown, gravelly, sandy loam that is very friable. Between this layer
and the cemented till is a 3- to 10-inch layer of very pale brown, gravelly, sandy loam The
cemented till consists of light gray, gravelly, sandy loam and normally occurs at depths
ranging from 24 to 32 inches. It is impermeable to roots and very slowly permeable to
water. Although compacted glacial till usually provides a stable foundation for structures,
we should note that its low permeability often results in increased surface water runoff in
areas where it lies close to the surface, underscoring the need for good water
management.
Slope Stability:
On Washington State Department of Ecology Coastal Zone Management maps
(Mason County volume), portions of the steeper slopes along Sherwood Creek are shown
as having intermediate (I) stability. The subject property, itself, is not depicted on this
map series which usually does not extend more than a mile inland from the coastline.
Direct examination of the steep roadcut along the west side of East Sherwood Hill
Rd. shows evidence of several previous slides that have occurred within the Esperance
sand due to oversteepening of the hillside and exposure of the ground materials to heavy
water erosion. Examination of the gentler, west-facing, hillside slope at the subject
6
Geological Site Assessment
Mr.And Mrs. Scott Trammell
October 15, 2001
property shows no evidence of instability or recent ground movements. Although some
indications of erosion due to heavy surface water runoff are present along portions of the
slope, we believe that this may be controlled by proper landscaping and revegetation of the
exposed areas. The location of the drainfield, near the base of the slope, will eliminate the
potential risk of ground movements on the slope face due to increased water from
effluent.
Seismic Hazards:
The Puget Lowland is classified as a Seismic Zone III by the Uniform Building
Code (UBC). Crustal earthquakes, which occur along surface faults, have been
documented in several areas of the Puget Sound region(see Appendix 2: Seismic Hazards
Map). However, the largest earthquakes in this region have been subcrustal events,
ranging in depth from 30 to 60 miles or more. These deeper-focus earthquakes are not
related to surface faults but are usually caused by movements along plate boundaries or
within deeper sub-crustal slabs. Although the mapping of faults and study of earthquakes
in the Puget Sound region is a continuing effort, the potential effects of a large seismic
event on hillsides and slopes in this area are still not completely understood.
Conclusions and Recommendations:
7
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
The observations and interpretations outlined in this report support the
classification of the hillside slopes on the subject property as generally stable. Although
recent slope activity on the property appears to be limited to minor surface erosion due to
water runoff,we cannot guarantee that a larger-scale ground movement will not occur at
some time in the future. However, with proper building site preparation and foundation
design, management of surface water runoff and landscaping or revegetation to protect
exposed soils from erosion, we see no reason why the development of this property, as
proposed, should not occur.
Specific recommendations are as follows:
1. It is recommended that the foundation design for the structure at the proposed
building site be prepared or approved by a licensed professional engineer. In the unlikely
event that excavation for the foundation exposes the poorly-consolidated(Esperance)
sand unit beneath the till hardpan, mechanical compaction of these sediments or backfilling
with engineered materials may be desirable.
2. An effective water-collection system(gutters and downspouts) should be
installed on all new structures with water tightlined to the base of the slope. Buried
portions of new tightlines should utilize 4- or 6-inch, smoothwall, sewer/drain pipe, tightly
8
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
cemented at the joints.
3. Curtain drains should be installed on the uphill sides of all structures to
intercept surface and near-surface runoff water from the uphill slopes that might otherwise
collect against the foundation. The outlet ends of these drains may be connected to the
tightline system A curtain drain may also be required on the uphill side of the drainfield to
prevent its flooding during periods of heavy rainfall.
4. Efforts should be made to promote and maintain a healthy growth of deep-
rooting vegetation on all slopes, wherever possible, to aid in retaining surface soils and
reduce the effects of erosion. Rock retaining walls and other landscape structures may also
be used where their design and installation is appropriate to retain ground materials.
Shrubs and plants used on slopes should be selected to minimize the need for heavy
watering and the planting of lawn grasses should be restricted to relatively level ground. A
list of recommended, deep-rooting plants is available, on request, or you may wish to
contact a local landscape architect or Certified Washington State Nurseryman.
5. Frequent inspections of the hillside slope should be conducted, especially
following periods of heavy rainfall, to determine the location of any new springs, seeps, or
areas of excessive erosion, and to identify any unstable conditions.
9
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
Summary and Limitations:
Although the development of properties along hillside slopes in the Puget Sound
region is common, it should be acknowledged by property owners that these areas may be
inherently unstable and involve higher risks than other areas due to the steepness of slope
faces and the unconsolidated nature of the ground materials. Frequent and severe winter
storms commonly produce high volumes of water runoff that may cause extensive surface
erosion, saturate ground materials and destabilize slopes, resulting in ground movements
that often occur without warning. Given these conditions, it should be expected that
erosion and periodic sloughing of ground materials on the subject property may be a
continuing problem. While the potential for larger-scale movements, such as may be
precipitated by a seismic event, are not well-understood in this area, the hazards that may
be posed by such an occurrence should also not be ignored.
This report has been prepared for the exclusive use of Mr. and Mrs. Scott
Trammell for specific application to the referenced site, and the conclusions and
recommendations presented, herein, should be applied in their entirety. Within the limits of
scope and budget, this study was conducted in accordance with generally-accepted
practices employed at the time this work was done. No other warranty of conditions is
expressed or implied. You should also be aware that these conclusions and
recommendations are based on a general knowledge of this area and the interpretations of
surface and subsurface conditions as they are believed to exist. These conditions may, in
fact, be different than interpreted and events may inevitably occur that were not predicted.
Clients should also be aware that there is a practical limit to the usefulness of this
10
Geological Site Assessment
Mr. And Mrs. Scott Trammell
October 15, 2001
report and recommendations without a site re-evaluation and critical review. Although this
time limit is somewhat arbitrary, it is suggested that 2 years be considered a reasonable
limit for the usefulness of this report.
*.OF PROF
1 y
p
Craig . White, C.P.G.
°ft K iO a ` Oc r 15, 2001
tt
APPENDIXES
Appendix 1: Location Map
Appendix 2: Potential Seismic Hazards
Appendix 3: Detail: Area of Study
N • a
CV
s�, r•-•� ("d .--�
5T XCN
��•
w
LLI
o
Pt 0
s
it
a
0
o
4t ?�• • • O as
. d � N
ICA
• ' • + O
• a
s 0
00
�-
f a O On
a
1714
N a
g�
'Devils Mtn.Fault Zone
f \l
SKAGIT
Fault
Point l
t 0 JSLA p G
Port.
�.} `n• lalr•
�. .
p� L Ati
ar 9Xndertdf a
, non r�sr 10
t at 'S ti • rN !�r u
NO
! o
l �
•r o � Okla � ` � �QE t
s f' ^oY ram'•`'
F
4 `+•r- r � _ l �C - J LAKE
ASHINGTON
� � F f ~ r � �j_� ��rt ��"h � � • S A
Seattle Fault Zone
L
_
7 n i
ort Orcharrt�
l
Lako ' • r
( IASHON p ,
.r K
• c_ ,rry
4
Potential Earthquake Faults rL L
t Ml in the , `
Puget Sound Region `��/� 7
r Source:U.S.Geological Survey
'C3
A °
� 1
eToQ o � �cn ytvo
N � o
m
A
u a�
a ^c F-
� O
o � a
L �
Q � �
i.
u
a
0
a
u