HomeMy WebLinkAboutSEP2005-00018 - SEP Determinations - 1/31/2005 oN.STATF MASON COUNTY
BPS c ° DEPARTMENT OF COMMUNITY DEVELOPMENT
4 MO
S v = Planning Division
" N T P O Box 279,Shelton,WA 98584
Zoo Y �,o~ (360)427-9670
1864
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2005-00018
Description of Proposal: Replace old, rotting floating dock with a new dock 5'from peoperty
line of 50' lot# 167 Haven Lake. New Dock will include 12 pilings,
6' x 34"walkway to 14' X 16' platform.
Proponent: BRIAN NELSON
Site Address(If Assigned): 102 NE LAKE DR TAHUYA
Directions to Site: SR 3 TO HAVEN LAKE - CIRCLE LAKE TO WEST SIDE AT Y
TAKE LAKE DR. NE.
Parcel Number: 223305000167
Legal Description: HAVEN LAKE TR 167
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverser impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request. MITIGATED MEASURES ARE ATTACHED.
Please contact Charles Mead McCoy III at ext. 294 with any questions.
This DNS is issued under 197-11-340(2), the Lead Agency will not act on this proposal for 14
days from the date below. Comments must be submitted to Charles Mead McCoy III, C/O Mason
County DCD, Planning Division, PO Box 279, Shelton WA 98584 by 2/14/2006.
Authorized Local Govemment Official Oate
I
i
C c ,
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2005-00018
CONDITIONS OF THIS DETERMINATION
�) Floatation for the structure shall be entirely enclosed and contained to permanently prevent
the breakup or loss of the floatation material into the water.
X
2) Debris or deleterious material resulting from construction shall be removed from the beach
area and project site and shall not be allowed to enter waters of the State.
X
3) Water quality is not to be degraded to the detriment of the aquatic environment as a result
of this project. X
4) Recreational piers shall be no higher than 11 feet above mean higher high water. Piers
and docks shall have at least an eight foot span between pilings.
X
5) The surface of floating structures shall be a minimum of eight inches about the surface of
the water.X
Description of Proposal: Replace old, rotting floating dock with a new dock 5' from peoperty
line of 50' lot# 167 Haven Lake. New Dock will include 12 pilings,
6' x 34" walkway to 14' X 16' platform.
Ili
I
i
i
i
I
I
i
i
i
I
i
i
i
MASON COUNTY Single
gSingiFa 5
►nity o-9.99es$30
le
ENVIRONMENTAL CHECKLIST Ac
1oeD20Aces$610
.Over 20 Acres$765
Purpose of Checklist: EIS(DS)$2M+5ftr
The State Environmental Policy Act(SEPA), chapter 43.21 C RCW, requires all governmental
agencies to consider the environmental impacts of a proposal before making decisions. An
environmental impact statement (EIS)must be prepared for all proposals with probable significant
adverse impacts on the quality of the environment. The purpose of this checklist is to provide
information to help you and the agency identify impacts from your proposal (and to reduce or avoid
impacts from the proposal, if it can be done).and to help the agency decide whether an EIS is
required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal.
Governmental agencies use this checklist to determine whether the environmental impacts of your
proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most
precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most
cases, you should be able to answer the questions from your own observations or project plans
without the need to hire experts. If you really do not know the answer,or if a question does not apply
to your proposal,write "do not know"or"does not apply".Complete answers to the questions now
may avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems, the governmental agencies
can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period
Of time or on different parcels of land. Attach any additional information that will help describe your
proposal or its environmental effects. The agency to which you submit this checklist may ask you to
explain your answers or provide additional information reasonably related to determining if there may
be significant adverse impact.
Use of Checklist for Non-project Proposals:
Complete this checklist for non-project proposals, even though questions may be answered "does not
apply". IN ADDITION, complete the SUPPLEMENTAL ACTIONS (part D).
There is a fee required, for the processing of the checklist, see above for the appropriate fee. Please
make your check payable to "Mason County Treasurer".
For non-project actions, the references in the checklist to the works"project", "applicant", and
"property or site" should be read as "proposal", "proposer", and "affected.geographic area",
respectively.
i
MASON CO. ENVIROMENTAL CHECKLIST
A. BACKGROUND PARCEL NUMBER:
1. Name of proposed project, if applicable:
RECEIVED
2. Name of applicant: B QI A 0 � (Zulu A L-so A) - d WW P-5 FEB o 3 1005
L, 4g�-,5Hu2i- cdA/s►Ru�'r►aAl - Ti �
C()Nt2AcfoeBE1FA'R OFFICE
3. Address and phone number of applicant and contact person:
NSLSUAJ.S - /S5/I 9,N6,0.4m A1/1 . i. rA<0MA, JIVA. 4'g"6
►�+ ,X6 3 537- 3A/ I- - :Zs3- -30 pq
r../cr/v�V- �O �vX /OSg , ,B��fpi,2, /.a` 98S�S ®36075-Sd�q
4. Date checklist prepared:
5. Agency requesting checklist:
6. Proposed timing or schedule (including phasing, if applicable): vFo N Per?w-"IY Aff�Ci/q L
V o-r fid ek CJ`Z fiWA0115 FCOVA S�A9r,
7. Do
you have any plans for future expansion, or further activity related to or connected with this
proposal: If yes, explain.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
lJ A
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
i
00
F
10. List any government approvals or permits that will be needed for your proposal, if known.
�viL t7/Nb ru-oAtY 4PPLIcAtjdN
WA 5 N ENV+Q,d,vrtA�A/CA t- P�P-Mt r
11. Give a brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on
project description.)
X S PLA6�- oL.O X ol� .^vG, irL UAwAle iOac/f r,V��� A iv��•v �oGk j 1`� bvl
PnaP .vL of Sly ' �07 ��`7 114PT.v � /fA,cv
I'VC .v0 r Pig i,�/6S .6 ` X 3y wAl e 414 /-5�, ' x /� ` �.�►rf 2�
12. What is the location of the proposal? Give sufficient information for a person to understand the
precise location of your proposed project including a street address, if any, and section,
township, and range, if known. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit
applications related to this checklist.
sat AQoQf-% - Al. 44x£ DR , BA PIA
PARCH(,.. �023 � - - 00/6 7
B. ENVIRONMENTAL ELEMENTS:
1. EARTH:
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other
6zN-r4.1
b. What is the steepest slope on the site (approximate percent slope)?
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any prime farmland.
Ui,J 1'N0M/J
d. Are there surface indications or history of unstable soils in the immediate vicinity: If so,
describe. N 0
Mason County Environmental Checklist Page 2
e. Describe the purpose, type, and approximate quantities of any filling or grading proposed.
Indicate source of fill.
�0t')
f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe.
� 0
g. About what percent of the site will be covered with impervious surfaces after project
constructions (for example, asphalt or buildings)?
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
NIA
2. AIR:
a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors,
industrial wood smoke) during construction and when the project is completed? If any,
generally describe and give approximate quantities, if known.
1�lL� DPZI V �A,
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
A/v
Mason County Environmental Checklist Page 3
i
C. Proposed measures to reduce or control emissions or other impacts to air, if any:
tio� �-
3 WATER:
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.
HA V 1.-AKL
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
JCS, (/ 9S jNSTAl, ';-D 7a PRa✓f 6 F-
A JOL10 rOUAJOA-�Jd 1,J 1"02 INS OP-aPas4 dcX
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
NON �.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
/Vona,
Mason County Environmental Checklist Page 4
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
No
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
N0
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities, if known.
� 0
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example; domestic sewage, industrial, containing the following
chemicals..., agricultural, etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve.
NC)
C. Water runoff(including storm water
( 9 )
1) Describe the source of runoff(including storm water) and method of collection and
disposal, if any(include quantities, if known). Where will this water flow? Will this flow
into other waters? If so, describe.
A/�A
2) Could waste materials enter ground or surface waters: If so, generally describe.
N0
1 Mason County Environmental Checklist Page 5
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
1'�ti1 N i 2_ i k/b ACI'I V -r l'.-3 W rtH 1 N JA/fiI�9- 1�9 D J1-5
4. PLANTS:
a. Check or circle types*veetation found on the site:
deciduous treeple, aspen, other
evergreen treepine other
shrubs
grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
N O jAJ c,
C. List threatened or endangered species known to be on or near the site.
PC Ni
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
No �-
Mason County Environmental Checklist Page 6
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the site or are known to be
on or near the site:
Birds: hawk, heron, eagle, songbirds, other
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon trou herring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
NoNS
C. Is the site part of a migration route? If so, explain.
IV0
d. Proposed measures to preserve or enhance wildlife, if any:
NOPI-, -- o.v6UtAlt, s7stAmAD tij1 of- 1-14,91�-A-r
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet the
completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
�L-�.Ci�R�GIY�1 /S Ad/JII.aQL£ oti�/�`£
b. Would your project affect the potential use of solar energy by adjacent properties: If so,
generally describe. N O
C. What kinds of energy conservation features are included in the plans of this proposal? List
other proposed measures to reduce or control energy impacts, if any:
Almi - j voa'D &c:K 1 A1,C 16,
Mason County Environmental Checklist Page 7
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so,
describe.
1) Describe special emergency services that might be required.
2) Proposed measures to reduce or control environmental health hazards, if any:
tv 0
b. Noise.
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
/V()AJ�
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hour's noise would come from the site.
Lo AvST,evCT'/oA.) - H VJ1 M4 CH/AID k F fit- CGS
3) Proposed measures to reduce or control noise impacts, if any:
t/W1t 1 /N6 1�dt/2S af- a fz eA?/d A)
8. LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
PAKT ,lei-S 1 Ds- A-IT111L/ oe� CRi (INDL -w �!/d��
Mason County Environmental Checklist Page 8
b. Has the site beenused for agriculture? If so, describe.
# v
C. Describe any structures on the site.
w la- X slo��l� UA11r - � '� lE guANK lyo1)5£ > I - 31 '1LL AWAi ftre emtN .
d. Will any structures be demolished? If so, what?
(VaNf
e. What is the current zoning classification of the site?
RuR-AL
f. What is the current comprehensive plan designation of the site?
j)V K tioWA)
g. If applicable, what is the current Shoreline Master Program designation of the site?
jl vK,voWA)
h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify.
V,j�,Vd W_A)
i. Approximately how many people would reside or work in the completed project?
j. Approximately how many people would the completed project displace?
k. Proposed measures to avoid or reduce displacement impacts, if any:
1VIA
Mason County Environmental Checklist Page 9
I. Proposed measures to ensure the proposal is compatible with existing and projected land uses
and plans, if any: 1Jd N
9. HOUSING:
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or
low-income housing.
1�1,A
b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or
low-income housing. Ne)N
C. Proposed measures to reduce or control housing impacts, if any: tJOA)�-
10. AESTHETICS:
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building material(s) proposed? --wd ? �IN65 l �
b. What views in the immediate vicinity would be altered or obstructed?
k/d/ A;-
q,-t0t<0 C 1 M 4 f4 J /U 70 /S I£s-T Su vp a 1' 7//iz, i STi-v6' atiE
C. Proposed measures to reduce or control aesthetic impacts, if any:
���J T�ar;� Gv/ �e��AT1 t Gz0 4,&-57�1�T/G S
Mason County Environmental Checklist Page 10
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
N o N�-
b. Could light or glare from the finished project be a safety hazard or interfere with views?
/U 0
C. What existing off-site sources of light or glare may affect your proposal:
A/0
d. Proposed measures to reduce or control light and glare impacts, if any:
N0�J '
12. RECREATION:
a. What designated and informal recreational opportunities are in the immediate vicinity?
noA_0 SW1tvtV"%AJC , �S14,► V6 � PiclvickiN6
b. Would the proposed project displace any existing recreational uses? If so, describe.
NO
C. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
A10 A ,
Mason County Environmental Checklist Page 11
I
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for, national, state, or local preservation
registers known to be on or next to the site? If so, generally�describe.
IU O
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
C. Proposed measures to reduce or control impacts, if any:
I114JU�
14. TRANSPORTATION:
a. Identify public streets and highways serving the site and describe proposed access to the
existing street system. Show on site plans, if any.
MLIC-
b. Is site currently served by public transit? If not, what is the approximate distance to the
existing street system? Show on site plans, if any.
AJ Q !MA 5e)AJ Ga✓nit`1 i RAMS/1
C. How many park' g spaces would the completed project have? How many would the project
eliminate?
d. Will the proposal require any new roads or streets, or improvements to existing roads or
streets, not including driveways? If so, generally describe (indicate whether public or private).
IV
Mason County Environmental Checklist Page 12
t
e. Will the project use (or occur in the immediate vicinity of)water, rail, or air transportation? If
so, generally describe. W, � w Folz P p(zl V�2
f. How many vehicular trips per day would be generated by the completed project: If known,
indicate when peak volumes would occur. NONE
g. Proposed measures to reduce or control transportation impacts, if any:
IVON�
15. PUBLIC SERVICES:
a. Would the project result in an increased need for public service (for example: fire protection,
police protection, health care, schools, other)?
If so, generally describe:
b. Proposed measures to reduce or control direct impacts on public services, if any:
i
i
I
Mason County Environmental Checklist Page 13
16. UTILITIES:
a. Circle utilities currently available at the site: electricit natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other:
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might be needed.
'[V0nJE
Signature:8'24 - 141'"
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature:
Date submitted: 1`31 , O 5
Mason County Environmental Checklist Page 14