Loading...
HomeMy WebLinkAboutSEP92-56 - SEP Determinations - 3/25/1992 ON STA 92-56 !• C � G a X o �, DEPARTMENT OF CONLtiIUNM DEVELOPMENT > SY = }- 0 T 2 YY y 0 �o Planning- Landfill - Utilities 186� DETERMINATION OF NONSIGNIFICANCE (WAC 197-I1-340) Description of Proposal: 290 square foot dock wi th 10 pi 1 i ng. Dock to extend 48, hevond OHWM. Proponent: weslev Naeseth Location of Proposal, including street address, if any: NE 61 Haven Lake Lane pn_iakp Lot 75 Sec 30, Twn 23 N, R 2 W Lead Agency: _Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. There is no comment period for this DNS. X _ This DNS is issued under 197-11-340(2); the Lead Agency will not act on this proposal for 15 days from the date below. Comments must be submitted by 419192 Responsible Official: Gary Yando Position/Title: Director of Community Development Telephone: f206) 427-9670 Address: 426 W. Cedar, P.O Box 186 Shelton WA 98584 Date: March 25,1992 Si;nature:. cc: DOE WDW Skokomish "tribe DNR Applicant Gary Yando,Director of Community Development - Erik Fairchild,Planning Director Mason County Bldg. III - 426 W. Cedar - P. O. Box 378 - Shelton, WA 98584 - (206) 427-9670 oa e 4 e = CURT SMITCH �y Director STATE OF WASHINGTON DEPARTMENT OF WILDLIFE 600 Capitol Way North • Olympia, Washington 9850 1-109 1 • (206) 753-5700 March 31 , 1992 Gary Yando, Director Dept . of Community Development P.O. Box 578 Shelton, WA 98584 RE: Wesley Naeseth Dock construction project 92-56 Dear Mr. Yando: The Department of Wildlife has several comments on this project. 1 . This project will require a Hydraulic Project Approval prior to starting work. 2 . Creosote and pent achlorophenol should never be used as a preservative on wood which will be in contact with the water. Both these chemicals are classifies by the EPA as restricted use pesticides. Both are oncogenic both leach out of the wood after treatment and during use. 3 . It is preferable from a biological standpoint to use untreated wood for construction projects with freshwater systems. If the dock is not to support any other structure untreated wood should be adequate both in strength and life span. If treated wood is to be used, the following are recommended preservatives . ammoniacal copper zinc arsenate (ACZA, chromated copper arsenate (CCA) , copper naphthenate, or copper-8-quinolinolate. These chemical are both less toxic and more stable then creosote or pentachlorophenol . 4. All treated wood should be commercially pressure treated and completely dry prior to placement in water. 5 . If concrete footing or supports are to be used they should be poured and cured on dry land and then placed in the water. Gary Yando March 31 , 1992 page 2 Thank you for the opportunity to review this project . If you have any questions please call . Sincer y, eph Kalinowski Habit t Bi6 ologist cc: Dave Gufler, WDW Connie Iten, WDW file Naeseth. 392