Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
JARPA & Determination of Nonsignificance for Flood Damage Repair - SHX Application - 11/9/2007
* AGENCY USE ONLY JARPA FORM LAST UPDATED:March 19,2007 Agency Reference#: Date Received: Circulated by: (local govt,or agency) Project Tracking Number: Washington State JOINT AQUATIC RESOURCES PERMIT APPLICATION (JARPA) Form " 4 Step 1:Get Ready Step Z:Complete Form Step 3:Check Work.,, Step 4:Copy and Send In .� Go to www.epermitting.org Use black ink. Use internet"Help" Use final review See JARPA Contacts at for correct form and Check correct buttons to answer checklist at www.epermitting.org for instructions. permit boxes. questions completely. www.gpermitting.org. correct mailing addresses. ❑ Fish Habitat Enhancement Projects per RCW 77.55.181. You must submit copy of completed JARPA form and Fish Habitat Enhancement JARPA Addition to your Local Government Planning Dep't and WA Dep't of Fish and Wildlife(WDFW)Area Habitat Biologist on same day. Note for Local Governments:You must submit comments to WDFW within 15 working days. Based on instructions at www.epermifting.org, I am sending copies of this application to the following: (check all that apply) Local Government for Shoreline: ❑Substantial Development ❑Conditional Use FIVariance OExemption []Revision ❑Floodplain Management ❑Critical Areas Ordinance 91washington Department of Fish and Wildlife for Hydraulic Project Approval(Submit 2 copies to WDFW Region) ©Washington Department of Ecology for 401 Water Quality Certification(to Regional Office-Federal Permit Unit) ❑Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification ❑Corps of Engineers for: ❑Section 404 permit FISection 10 permit ❑Coast Guard for: ❑General Bridge Act Permit ❑Private Aids to Navigation(for non-bridge projects) ❑For Department of Transportation projects only: This project will be designed to meet conditions of the most current Ecology/Department of Transportation Water Quality Implementing Agreement PROJECT TITLE.Haven Lake access renovation PROJECT DESCRIPTION. General repair and maintenance to an existing access entranceway and parking area. No expansion of the facility beyond the existing footprint is proposed.An outdated privy will be removed and replaced with an ADA(Americans with Disabilities Act)compliant vault toilet,concrete pad,and a paved parking space.Other than the single ADA paved parking space,gravel surfacing will be used for the parking area and entranceway. SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications. 1.APPLICANT Washington Department of Fish and Wildlife Capital and Facilities Management Division MAILING ADDRESS 600 Capitol Way North,Mail Stop 43158,OI la,WA. 98501 WORK PHONE E-MAIL ADDRESS MAIN OFFICE PHONE FAX# 360-902-8422 stalmwls@dfw.wa.gov 360-902-8300 360-902-8367 If an agent is acting for the applicant during the permit process,complete$2. Be sure agent signs Section C(Signature Block)for all pennit applications 2.AUTHORIZED AGENT W. Lauren Stalmaster MAILING ADDRESS 600 Capitol Way North Olympia,Washington 98501 WORK PHONE E-MAIL ADDRESS MAIN OFFICE PHONE FAX# 360-902-8422 stalmwls@dfw.wa.gov 360-902-8300 360-902-8367 3. Relationship of applicant to property: a OWNER ❑ PURCHASER a LESSEE ❑x see attached agreement i 4. Name,address and phone number of property owners)if other than applicant: 5. Location(street address,including city,county and zip code,where proposed activity exists or will occur)Haven Lane,Mason County Local government with jurisdiction(city or county) Mason County Waterbody you are working in Haven Lake Tributary of Tahuya River WRIA 915 Is this waterbody on the 303(d)List ❑ YES ® NO If YES,what parameter(s) Shoreline designation E t Zoning designation l Section Section Township Range Government Lot Northeast 30 23N 02W DNR stream type if known f Office of Regulatory Assistance,JARPA JARPA FORM LAST UPDATED:March 19,2007 For help call 800-917-0043 or visit www.epermitting.org 1 Latitude and Longitude 47 27111.2" 122 59'18" ffa rcel Number Tract B-see attached plat map • 6. Describe(a)the current use of the properly,(b)structures existing on the property,and(c)existing environmental conditions. Have you completed any portion of the proposed activity on this property? ❑ YES ❑x NO For any portion of the proposed activity already completed on this property,indicate month and year of completion. This property serves as a boat launch access to Haven Lake. The existing structures on the site include a fiberglass toilet and a concrete boat ramp. The existing parking area is composed of gravel surfaces with vegetation bordering the parking area. Is the property agricultural land? ❑ YES Ox NO Are you a USDA program participant? ❑ YES NO 7a. Describe the proposed work that needs aquatic permits: Complete plans and specifications should be provided for all work waterward of the ordinary high water mark or line,including types of equipment to be used. If applying for a shoreline permit,describe all work within and beyond 200 feet of the ordinary high water mark. If you have provided attached materials to describe your project,you still must summarize the proposed work here. Attach a separate sheet if additional space is needed. Work proposed within 200 feet above the ordinary high water mark: Place and compact 3 inches of crushed aggregate on the 120' x 70' parking area and the 60' x 35' entranceway (15,000 square feet total area). All grading activities proposed are to restore the access areas to previously existing ground levels. Only soils that lack intact and distinct soil horizons, or which have been previously disturbed by construction activities, will be altered. PREPARATION OF DRAWINGS: See sample drawings and guidance for completing the drawings. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE li DRAWINGS MUST BE ATTACHED. NOTE: Applicants are encouraged to submit photographs of the project site,but these DO NOT substitute for drawings. THE CORPS '! OF ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON 8-1/2 X 11 INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES. I 7b. Describe the purpose of the proposed work and why you want or need to perform it at the site. Please explain any specific needs that have influenced the design. This work is necessary to provide ADA compliant public facilities to an existing site, and to maintain the quality of the site for boat launching and vehicle parking. The removal of the older style fiberglass toilet (which is currently located approximately 65 feet from ordinary high water mark)will help protect water quality. The proposed vault toilet is an improved self-contained unit and will be placed 120 feet from the ordinary high water mark (nearly double the distance). No in-water work will occur. 7c. Describe the potential impacts to characteristic uses of the water body. These uses may include fish and aquatic life,water quality, water supply,recreation and aesthetics. Identify proposed actions to avoid,minimize,and mitigate detrimental impacts and provide proper protection of fish and aquatic life. Identify which guidance documents you have used. Attach a separate sheet if additional space is needed. No impacts are anticipated to Haven Lake. Erosion control and water quality Best Management Practices (BMPs) will be implemented to minimize turbid runoff and the mobilization of suspended sediments to the water. Specifically, a silt fence or straw bales will be placed around the construction area during project activities. 7d. For in-water construction work,will your project be in compliance with the State of Washington water quality standards for turbidity (WAC 173-201A-410)? ❑ YES ❑ NO 8. Will the project be constructed in stages? ❑ YES nx NO Proposed starting date: 2/11/2007 Estimated duration of activity: 2-3 months 9. Check if any temporary or permanent structures will be placed: ❑ Waterward of the ordinary high water mark or line for fresh or tidal waters AND/OR ❑ Waterward of the mean higher high water for tidal waters? 10. Will fill material(rock,fill,bulkhead,or other material)be placed: No ❑ Waterward of the ordinary high water mark or line for fresh waters? If YES,VOLUME(cubic yards) /AREA (acres) ❑ Waterward of the mean higher high water for tidal waters? If YES,VOLUME(cubic yards) /AREA (acres) Office of Regulatory Assistance,JARPA JARPA FORM LAST UPDATED:March 19,2007 For help call 800-917-0043 or visit www.epermiWng.org 2 I 11. Will material be placed in wetlands? ❑ YES xx NO If YES: A. Impacted area in acres: B. Has a delineation been completed? If YES,please submit with application. ❑ YES ❑ NO C. Has a wetland report been prepared? If YES,please submit with application ❑ YES ❑ NO D.Type and composition of fill material(e.g.,sand,etc.) E. Material source: F.List all soil series(type of soil)located at the project site,and indicate if they are on the county's list of hydric soils. Soils information can be obtained from the natural Resources Conservation Service(NRCS). G.WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑ YES xx NO If YES, IMPACTED AREA IS ACRES OF DRAINED WETLANDS. NOTE:If your project will impact greater than 1/10 of an acre of wetland,submit a mitigation plan to the Corps and Ecology for approval along with the JARPA form. NOTE:A 401 water quality certification may be required from Ecology in addition to an approved mitigation plan if your project wetland impacts are greater than 1/10 acre in size. Please submit the JARPA form and mitigation plan to Ecology for 401 certification review. 12. Stormwater Compliance: This project is(or will be)designed to meet ecology's most current stormwater manual,or an Ecology approved local stormwater manual. 0 YES ❑ NO If YES—Which manual will your project be designed to meet? Stormwater Management Manual-Western Washington 2005 If NO—For Clean Water Act Section 401 and 404 permits only—Please submit to Ecology for approval,along with this JARPA application,documentation that demonstrates the stormwater runoff from your project or activity will comply with the water quality standards,WAC 173-201 A 13. Will excavation or dredging be required in water or wetlands? ❑ YES 0 NO If YES: A. Volume: (cubic yards) /area (acre) B. Composition of material to be removed: C. Disposal site for excavated material: D. Method of dredging: 14. Has the State Environmental Policy Act(SEPA)been completed ❑x YES ❑ NO SEPA Lead Agency: WDFW SEPA Decision: DNS, MDNS, EIS,Adoption,Exemption DNS Decision Date(end of comment period) SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION 15. List other Applications,approvals or certifications from other federal,state or local agencies for any structures,construction discharges or other activities described in the application(i.e.preliminary plat approval,health district approval,building permit,SEPA review,federal energy regulatory commission license(FERC), Forest practices application,etc.). Also,indicate whether work has been completed and indicate all existing work on drawings. NOTE:For use with Corps Nationwide Permits,identify whether your project has or will need an NPDES permit for discharging wastewater and/or stormwater. TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION DATE APPROVED COMPLETE NO. D? SEPA review WA Dept.of Fish&Wildlife November 6,2007 November 26,2007 Yes Sewage system permit Mason County Dept. February 4,2008 16. Has any agency denied approval for the activity you're applying for or for any activity directly related to the activity described herein? ❑ YES Ox NO If YES,explain: SECTION B - Use for Shoreline and Corps of Engineers permits only= 17a. Total cost of project. This means the fair market value of the project,including materials,labor, machine rentals,etc. $25,000. Office of Regulatory Assistance,JARPA JARPA FORM LAST UPDATED:March 19,2007 For help call 800-917-0043 or visit www.eoermitting.oa 3 17b. If a project or any portion of a project receives funding from a federal agency,that agency is responsible for ESA consultatiorl. Please, indicate if you will receive federal funds and what federal agency is providing those funds. FEDERAL FUNDING a YES r—xl NO If YES,please list the federal agency. 18. Local government with jurisdiction: Mason County 19. Provide names,addresses and telephone numbers of adjoining property owners,lessees,etc. Please note: Shoreline Management Compliance may require additional notice—consult your local government. NAME ADDRESS PHONE NUMBER SECTION C-This section MUST be completed for any permit covered by this application 0. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am familiar with the information contained in this application,and that to the best of my knowledge and belief,such information is true,complete, and accurate. I further certify that I possess the authority to undertake the proposed activities. I hereby grant to the agencies to which this application is made,the right to enter the above-described location to inspect the proposed,in-progress or completed work. I agree to start work ONLY after all necessary permits have been received. DAT �I��� SIGNATURE OF APPLICANT DATE SIGNATURE OF AUTHORIZED AGENT I HEREBY DESIGNATE TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR PERMIT(S). I UNDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED, I MUST SIGN THE PERMIT. . SIGNATURE OF APPLICANT DATE SIGNATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS, E.G. DNR) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS DESIGNATED. 18 U.S.0§1001 provides that: Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. COMPLETED BY LOCAL OFFICIAL A. Nature of the existing shoreline. (Describe type of shoreline,such as marine,stream,lake,lagoon,marsh,bog,swamp,flood plain,floodway,delta;type of beach,such as accretion,erosion,high bank,low bank,or dike;material such as sand,gravel, mud,clay, rock,riprap;and extent and type of bulkheading,if any) B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade level, indicate the approximate location of and number of residential units,existing and potential,that will have an obstructed view: C. If the application involves a conditional use or variance,set forth in full that portion of the master program which provides that the proposed use may be a conditional use,or,in the case of a variance,from which the variance is being sought: . These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs,please contact the appropriate agency in the instructions Office of Regulatory Assistance,JARPA JARPA FORM LAST UPDATED:March 19,2007 For help call 800-917-0043 or visit www.epermitfing.org 4 NE THAN LAKE RD GOAT RANCH RD Nt SANOhi�(� 1 OOTEN, Y BENNETSON ;LAKE J - LAKE o Q� W ti� 2 P W SITE 2. P Q 'HAVEN ' LAKE. TAHUYA m �o = 2 a N f y y "S' o L 2 Cy 4 jc 4i NE BEFAIR TAHUYA RD i "'D V!" Ap Y 6 } �Ok B.S 0i T O S�� Z HOOD CANAL LOCAL VICINITY MAP SCALE: NONE N DIRECTIONS FROM HWY 3: BREMERTON FROM THE SOUTH TURN LEFT ONTO OLD BELFAIR HWY. FROM THE NORTH TURN RIGHT ONTO OLD BELFAIR HWY. TURN LEFT ONTO ST HWY 300. - 'ucEr HWY 300 BECOMES NE SHORE RD. souND% TURN RIGHT ONTO NE BELFAIR TAHUYA RD. PORT STAY STRAIGHT TO GO ONTO NE HAVEN WAY. ORCHARD TURN LEFT TO STAY ON NE HAVEN WAY. SITE TURN LEFT ONTO NE HAVEN LAKE DR. TURN RIGHT ONTO RODODENDRON BLVD. TURN LEFT ONTO NE HAVEN LANE. 2� ELFAIR iO S> y 2 dE' HWY_30� W�SOB GIG ARBOR N VICINITY MAP SCALE: NONE PURPOSE: REMOVE EXISTING VAULT WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED:ACCESS RENOVATION TOILET, REGRADE ACCESS 600 CAPITOL WAY N. INSTALL NEW CXT VAULT TOILET OLYMPIA, WA 98501-1091 SURFACE REGRADE ACCESS AREA DATUM: ASSUMED IN: HAVEN LAKE ADJACENT PROPERTY OWNER: REFERENCE NO. NEAR: BELFAIR 1. SITE: HAVEN LAKE ACCESS COUNTY OF: MASON STATE: WA 2 ADDRESS: HAVEN LANE PORTION OF: SEC 30, T23N, R2W ENG. PROJECT NO. MN:A301:07-1 BELFAIR, WA DATE:10Z0V2007 SHEET 1 OF 5 9, a, i I \ HAVEN LAKE TBM-1 REBAR CAP ELE N V.-100.0 ASSUMED 10000.11 RIGHT OF WAY E 10000.09 qqW \`LAUNCH AREA WATER SURFACE 98.13 CENTER LINE OF ROAD 4� ! v W000 SHED 4/2DO7 N TOP OF BANK 99.65 RIGHT OF WAY 3 FENCED CONCRETE 60"CMP `EDGE OF GRA L DIVERSION I / z / WODD \ 4/20072 r LIGHT CONCRETE PO57 / SIGN`POLE\ POSTRETE j CONCRETE / POSTS GRASS /ISLAND �\`� / CONCRETE - - POSTS EDGE OF PAVEMENT -. 18'CMP ��qH / GRAVEL PARKING AREA I j F18ERGLASS ? TOILET 0 BRUSH UNE EDGED Pf AVEMEN7 POWER POLE /(y / W/ELEC LINE J/ / `-36'CMP T05- 0 20 40 60 120 10 30 50 90 180 €� SCALE. 1"=60• " / „5 EXISTING SITE PLAN ! / / I REFERENCE NO. APPLICANT: WASHINGTON DEPT. of FISH & WILDLIFE HAVEN LAKE ACCESS RENOVATION EXISTING SITE PLAN j AT: BELFAIR WASHINGTON F F-2 J ti 48�CHAINLINK FENCE t� \ CONTROL POINT-1 PR APDX. 150LF. QQ REBAR CAP BREAK BETWEEN SHED - 4 ;`'�, ELEV.100.00 ASSUMED \N 10000.11 E 10000.09 \ LAYOUT POINTS P-1 N:9810.04,E:10042.56-EL=105.2 , \ P-2 N:9798.31,E:10020.91 -EL-105.5 LAUNCH AREA N I P-3 N:9790.00.E:10027.48- L=105..5 P-4 N:9778.91,E10037.01 -EL=105.5 P-5 N:9794.87,E:10055.59- EL-105.2 GRADE TO SAME ELEVATION WS 98.13 FENCE POINTS \f/ 04/2007 \ F-1 N:9887.77,E:9957.35 WOOD SHED F-2 N:10049.03.E:9981.84 l HAVEN LAKE a - \ FENCED CONCRETE DIVERSION 4 WOOD LICHT CONCRETE POST / yGN POLE \ \ \ CONCRETE / POST .. .. ... F-1 - E - \ - _ _ — WS 94 306 a/zoo? .L CONCRETE `GRASS POSTS - ISLAND CONCRETE 'r- NY - Im PARKING \y AREA ,CONTROL POINT-2//. REBAR CAP ye ELEV.105.81 / FIBERGLASS P-1 .'N 9809.91 TOILET AND 6' / E 10064.74 CHAINLINK ; FENCE/ p_2 BE REMOVED \ / / INSTALL BARRIER ROCK SPACED AT 3.5' 6 P 5 O NEW T. VAULT/ / v, BRUSH-INE TOILET FINISHED vh� p'P-4 FLOOR L 10,5 5, / / OF �rl / PAVEMENT SITE PLAN 0 20 411 so SCALE: 1" = 40' REFERENCE NO. i� - 0 APPLICANT: SCALE: RR D D = 40' SURFACE IN GRAVEL WASHINGTON DEPT. of FISH & WILDLIFE PARKING AREA. HAVEN LAKE ACCESS RENOVATION SITE PLAN ' AT: BELFAIR WASHINGTON ENG. PROJECT NO. MN:A301:07-1 DATE:10 05/2007 SHEET 3 OF 5 I 5.00' ADA ACCESSABLE 0j . — PARKING SIGN I I I I I I WHEEL STOP WITH (2)24" a6 REBAR STAKE IN PLACE I I I I i i I 4"PAINTED STRIPES—/ DIAGONAL 2'O.C. ( ADA PARKING SYMBOL I I I IL - - - - � CXT"GUNNISON"RIGHT HAND STANDARD VAULT TOILET 6"CONCRETE SLAB PATH #4 REBAR L 12'O.C. EACH WAY 2%MAX SLOPE 12"x18"ALUMINUM SIGN GREEN TEXT ON REFLECTIVE WHITE BACKGROUND PARKX 12"x4"ALUMINUM SIGN _ 18,00' 'LS 'VAN ACCESSIBLE" CXT VAULT TOILET AND ADA PARKING PAD SCALE: NTS 20 SCH40 GALV.STEEL PIPE 0 I N FINISHED GRADE NOTE: o USE ANTI-VANDAL NUTS AND BOLTS ON ALL SIGNAGE. I.-D CONCRETE FOOTING VAN ACCESSIBLE SIGN SCALE: NTS REFERENCE NO. APPLICANT: WASHINGTON DEPT. of FISH & WILDLIFE HAVEN LAKE ACCESS RENOVATION CXT VAULT TOILET AND PARKING PAD AT: BELFAIR WASHINGTON ENC. PROJECT NO. MN:A301:07-1 OATE:lg OO. 007 SHEET 4 OF 5 u p4p U N I 10'MAX TYP. ADD TOP RAIL AT EACH END SECTION FOR POST SUPPORT 3'0 END POST 2'0 LINE POST OR BRACE POST SCH40 SCH 40 GALVANIZED PIPE TENSION CABLE FULL LENGTH GALVANIZED PIPE CHAIN LINK FABRIC-� , u \\` - m TIE WIRE FABRIC BAND TENSION CABLE STRETCHER BAR ONLY NEEDED FOR END POST x TO BRACE POST w� EXISTING GROUND n CONCRETE POST FOOTING 12y � hI� TYP CHAINLINK FENCE DETAIL SCALE: NTS REFERENCE NO. APPLICANT: WASHINGTON DEPT. of FISH & WILDLIFE HAVEN LAKE ACCESS RENOVATION 48" CHAINLINK FENCE DETAIL AT: BELFAIR WASHINGTON ENG. PROJECT NO. MN:A301:07-1 OATE:10/05/2007 SHEET rJ OF cJ i I �k P fi�4 5TAT,�0 7 � v State of Washington DEPARTMENT OF FISH AND WILDLIFE Mailing Address: 600 Capitol Way N-Olympia,Washington 98501-1091-(360)902-2200,TDD(360)902-2207 Main Office location:Natural Resources Building-1111 Washington Street SE-Olympia,WA DETERMINATION OF NONSIGNIFICANCE (DNS) Name of Proposal: FLOOD DAMAGE REPAIR FOR WDFW OWNED AND MAINTAINED RIVER ACCESS BOAT RAMPS AND ASSOCIATED FACILITIES (MULTIPLE). Description of Proposal: The general proposal is to remove silt deposits from boat ramps and repair flood damage that may occur at WDFW owned and operated boat access facilities located along rivers. Specifically,this proposal for 2007-08 is to repair flood damage that occurred at several existing boat access facilities located along the Skagit and the Stilliguamish Rivers(see Table 1 below). This SEPA review is also for future flood damage repairs that may be needed at any WDFW owned and operated boat launch and facilities in the event of flooding (see Table 2 -list of all current WDFW owned and managed river access sites). The programmatic proposal will involve one or more of the following actions: 1. Remove silt and sand that blocks access to boat ramps. 2. Remove sand and silt-contaminated gravel that was stockpiled during emergency repair. 3. Regrade parking areas and entranceways that are damaged from floodwaters. 4. Dispose of silt and silt-contaminated gravel at pre-approved local sites. 5. No materials will be deposited or disposed of into wetlands. 6. Obtain and follow requirements of all applicable Federal, State and Local permits. Proponent/Applicant: Washington Dept of Fish and Wildlife Capital Programs&Engineering Division 600 Capitol Way North Olympia,WA 98501-1091 Location of Proposal,including street,if any: Statewide,Washington,All Counties (See Attached list of current sites) Lead Agency:Washington Department of Fish and Wildlife(WDFW) WDFW has determined that this proposal will have no probable significant adverse impacts on the environment. Therefore,an environmental impact statement(EIS)is not required under RCW 43.21C.030(2)(c). We made this determination of nonsignificance(DNS)after review of the environmental checklist and other information on file with us. This information is available to the public on request. Agencies,affected tribes and members of the public are invited to comment on this proposal. We issued this DNS under WAC 197-11-340(2). We will not act on this proposal for 14 days from the date of issuance of this DNS. If you have comments about this DNS or this proposal, we must receive your comments by November 23,2007. When you send us your comments,please provide the name of proposal in your comment letter and mail it to: Responsible Official: Teresa A. Eturaspe I Position/Title: SEPA/NEPA Coordinator,Regulatory Services Section Address: 600 Capitol Way North,Olympia,WA 98501 You can also send your comments via email to: SEPAdesk(d,dfw.wa.gov You can also send you comments via fax to: (360) 902-2946. If you have questions about details of the proposal,contact: W. Lauren Stalmaster Fish and Wildlife Biologist Telephone Number: (360)902-8422 Fax Number: (360)902-8367 E-Mail: stahnwls@dfw.wa.gov j If you have questions about this action,please contact: I j Teresa A. Eturaspe Phone: (360)902-2575 Fax: (360) 902-2946 or email: SEPAdesk(ddfw.wa.gov DATE OF ISSUE: November 9,2007 SIGNATURE SEPA Log Number:07-092.dns !i f 1 r i i i t i i it Washington a Department of FISH and WILDLIFE State of Washington DEPARTMENT OF FISH AND WILDLIFE Mailing Address: 600 Capitol Way N,Olympia,Washington 98501-1091-(360)902-2200 ENVIRONMENTAL CHECKLIST (WAC 197-11-960) I I A. BACKGROUND 1. Name of proposed project, if applicable: Flood Damage Repair for WDFW owned and maintained River Access Boat Ramps and Associated Facilities(multiple). 2. Name of Applicant: Washington Department of Fish and Wildlife(WDFW) 3. Address and phone number of applicant and contact person: Washington Dept of Fish and Wildlife Contact Person: W. Lauren Stalmaster Capital Programs R Engineering Division Fish and Wildlife Biologist 600 Capitol Way North Telephone Number: (360)902-8422 Olympia,WA 98501-1091 Fax Number: (360)902-8367 E-Mail: stalmwis@dfw.wa.gov 4. Date checklist prepared: November 6,2007 5. Agency requesting checklist: Washington Department of Fish and Wildlife 6. Proposed timing or schedule(including phasing, if applicable): Specific sites,which were flooded during November 2006, along the Skagit and Stilliguamish Rivers(see Table 1)will be repaired between November 15, 2007 and May 31, 2008. Generally, any WDFW owned and maintained access site along flooding rivers may need repairs throughout the next five years at various times.All timing and other requirements of applicable permits would be followed. 7. Do you have any plans for future additions,expansion,or further activity related to or connected with this proposal? If yes,explain. Further similar activities may occur when future flood events cause similar damage. 8. List any environmental information you know about that has been prepared,or will be prepared,directly related to this proposal: The Federal Emergency Management Agency(FEMA) conducted environmental review of the 2007-08 proposed activities and provided general guidance for compliance with environmental and historical resource protection measures. 9. Do you know whether applications are pending for governmental approvals of other proposals j directly affecting the property covered by your proposal? If yes, explain. None known. I I 1 I 10. List any government approvals or permits that will be needed for your proposal, if known. The 2006-07 flood damage repair proposals along the Skagit and Stilliguamish Rivers involve no in- water work; however, a Hydraulic Project Approval will be obtained from WA Dept. of Fish and Wildlife for some sites due to flood-water flow patterns. For the proposed 2006-07 repairs,applicable local permits may include shoreline exemption,and grading and fill permits from the City of Mt.Vernon,and Skagit and Snohomish Counties.All applicable federal, state,and local permits will be obtained as required on a site-by-site basis. 11. Give brief,complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. The general proposal is to remove silt deposits from boat ramps and repair flood damage that may occur at WDFW owned and operated existing boat access facilities located along rivers. Specifically, this proposal for 2007-08 is to repair flood damage that occurred at several existing boat access facilities located along the Skagit and the Stilliguamish Rivers(see Table 1 below). This SEPA review is also for future flood damage repairs that may be needed at any WDFW owned and operated boat launch and facilities in the event of flooding(see Table 2-list of all current WDFW owned and managed river access sites). The programmatic proposal will involve one or more of the following actions; 1. Remove silt and sand that blocks access to boat ramps. 2. Remove sand and silt-contaminated gravel that was stockpiled during emergency repair. 3. Regrade parking areas and entranceways that are damaged from floodwaters. 4. Dispose of silt and silt-contaminated gravel at pre-approved local sites. 5. No materials will be deposited or disposed of into wetlands. 6. Obtain and follow requirements of all applicable Federal,State and Local permits. 12, Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including street address, if any,and section,township,and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description,site plan,vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications {{ related to this checklist. ! The proposal for flood damage repair for 2007-08 involves WDFW owned and operated access sites along the Skagit River and Stilliguamish River(see table below and attached figures 1 and 2). Table 1.2007-2008 Flood Damage Repair Site Name Section-Township-Ran a Local Jurisdiction Faber North S20 T35N R9E Skagit County Barnaby Slough S35 T35N R9-10E Skagit County Skagit City 36 T34N R03E Skagit County Spud House _ 36 T34N R03E Skagit County Youngs Bar S18&19 T34N R4E City of Mt Vernon { Hamilton S13 T35N R06E Skagit County s Birdsview S30 T35N R10E Pkagit County man South S22 T35N R6E Skagit County Strotz S5 T31 N R5E Snohomish County WDF&W Environmental Checklist-Page 2 a a .rrrri irnrrawirrrrr�w+ The general proposal may involve any of the listed access sites in the event that future flooding events cause similar damage to other WDFW owned and managed access sites along rivers in Washington. (see Table 2-all WDFW owned and managed river access sites). Before implementing any future repair and maintenance activities all relevant federal, state and local permits would be obtained. B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site(underline one): flat, rolling, hilly,steep slopes, mountainous,other-the properties are waterfront lots located along rivers and are generally gentle sloping or flat areas. b. What is the steepest slope on the site(approximate percent slope)? All proposed work will occur within existing development footprints with no excavation or fill activities within steep slope areas. c. What general types of soils are found on the site(for,example, clay,sand,gravel, peat, muck)? If you know the classification of the agricultural soils, specify them and note any prime farmland. Soils vary throughout the state. Generally, the types of soils found at river access sites are sand, silt and gravel and range from poorly drained to somewhat excessively drained. Soils at the sites are likely fluvial deposits,topography is nearly level and within a floodplain. Agricultural properties may be adjacent to access sites as floodplains are commonly used for farming practices. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. None known. e. Describe the purpose,type and approximate quantities of any filling or grading proposed. Indicate source of fill. Grading of existing parking areas and entranceways would occur and vary from site to site. For the proposed Flood Damage Repair 2006-07 work, gravel quantities range from 44 cubic yards to 96 cubic yards.Gravel will consist of 5/8-inch minus and will be from a clean source meeting road G grade specifications.Applicable local and state permits will be obtained for each grading operation. k f. Could erosion occur as a result of clearing,construction or use? If so generally describe. t Erosion is not likely but may occur during construction and grading of the parking lots and 4 entranceways. Best management practices for erosion and sediment control will be implemented as appropriate on a site-specific basis. g. About what percent of the site will be covered with impervious surfaces after project construction (for example,asphalt or buildings)? No impervious surfaces will be added to existing access facilities. h. Proposed measures to reduce or control erosion,or other impacts to the earth,if any: Any potential erosion will be prevented by applying erosion and sedimentation control and Best Management Practices(BMPs)according to standards from either the Ecology Stormwater Design Manual or guidelines from the applicable local jurisdiction. For example implementation of BMPs will include silt fencing and hay bales where needed. I i WDF&W Environmental Checklist-Page 3 1 i i 2. Air a. What type of emissions to the air would result from the proposal(i.e.,dust automobile, odors, industrial wood smoke)during construction and when the project is completed? If any,generally describe and give approximate quantities if known. Short-term vehicle exhaust and some dust from construction activities is expected. No long-term change in emissions is expected from the completed project as no change in existing development footprint is proposed. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None. c. Proposed measures to reduce or control emissions or other impacts to air,if any: None. 3. WATER a. Surface 1) Is there any surface water body on or in the immediate vicinity of the site(including year-round and seasonal streams,saltwater,lakes ponds or wetlands)? If yes, describe type and provide names. If appropriate,state what stream or river it flows into. Yes,the general proposal sites are located along rivers and streams. For 2007-08 the proposals are located along the Skagit and Stilliguamish Rivers(see Table 1 and Figures 1 and 2). 2) Will the project require any work over, in,or adjacent to(within 200 feet)the described waters? If yes,please describe and attach available plans. Most of the project improvements are located within the 200-foot shoreline jurisdiction of major rivers. Any work that requires a shoreline exemption permit will be obtained prior to commencing activities. Prior to any in-water work, an HPA and other required permits will be obtained. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. No fill material would be placed in surface water or wetlands. Any removal of materials would consist of removing river deposited silt from existing boat ramps and access areas.No in-water work would occur without first obtaining permits(for example, an HPA)from the applicable jurisdiction. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No water withdrawals or diversions are proposed for the 2007-08 flood damage repair. Should water withdrawals or diversions be required for future flood damage repair operations, all applicable federal, state and local permit requirements would be followed. 5) Does the proposal lie within a 100-year flood plain? If so, note location on the site plan. Yes, the proposals are generally within the 100-year floodplain of major rivers. The proposal for flood damage repair for 2007-08 were reviewed by FEMA and through the 8-step decision making process(per 44 CFR 9.6)it was determined that the projects will result in no short or long-term adverse effects to the subject flood plain floodway. 6) Does the proposal involve any discharges of waste material to surface waters? If so, describe the type of waste and anticipated volume of discharge. No discharge of waste materials to surface waters is proposed. Should discharge activities be required for future flood damage repair operations, all applicable federal, state and local permit requirements would be followed. WDF&W Environmental Checklist-Page 4 b. Ground 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description purpose,and approximate quantities, if known. . No water withdrawals or discharges to ground waters is proposed. Should ground water withdrawal or discharge activities be required for future flood damage repair operations, all applicable federal,state and local permit requirements would be followed 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any. Describe the general size of the.system,the number of such systems,the number of houses to be served(if applicable),or the number of animals or humans the systems)are expected to serve. None proposed; however should such activities be required for future flood damage repair operations,all applicable federal, state and local permit requirements would be followed c. Water Runoff(including storm water): 1) Describe the source of runoff(including storm water)and method of collection and disposal, if any(including quantities, if known). Where will this water flow? Will this water flow into other waters? If so,describe. None proposed; however should such activities be required for future flood damage repair operations, all applicable federal, state and local permit requirements would be followed i i 2) Could waste materials enter ground or surface waters? If so,generally describe. None proposed; however should such activities be required for future flood damage repair operations, all applicable federal,state and local permit requirements would be followed d. Proposed measures to reduce or control surface, ,ground and runoff water impacts, if any: Best Management Practices will be implemented on a case-by-case basis to reduce any impacts of sediment erosion to surface or ground water. 4. PLANTS a. Check or underline types of vegetation found on the site: The following plants are typical for the proposed 2006-07 flood repair sites: x deciduous tree: alder,maple,aspen, other-black cottonwood f x evergreen tree: fr,cedar,pine, other i x shrubs: rose,salmonberry j x grass I _ pasture x crop or grain i wet soil plants: cat tail, skunk cabbage, other- _ water plants:water lily, eel grass, milfoil, other: 5 x other types of vegetation: sword fern,Himalayan blackberry E WDF&W Environmental Checklist-Page 5 b. What kind and amount of vegetation will be removed or altered? The proposed 2006-07 repairs along the Skagit River, specifically at the"Spud House"site will involve removing invasive weeds when the stockpiled silt is removed. The invasive species that will be removed is knotweed(Polygonum cuspidatum)and will be properly disposed at a County approved landfill. Future flood damage repair may involve similar removal of noxious weeds. i c. List threatened and endangered species [of plants]known to be on or near the site. The listed threatened and endangered species vary statewide and each site will be reviewed on a case-by-case basis. The Washington Dept.of Fish and Wildlife Priority Habitat Database and Dept. of Natural Resources Heritage database of sensitive and rare plants will be consulted. Permit conditions for the proposed 2006-07 repairs will address protection measures required for threatened and endangered species. Any future flood damage repair activities will include review of the sites through the subsequent permit application processes. d. Proposed landscaping,use of native plants,or other measures to preserve or enhance vegetation on the site,if any: None proposed. 6. ANIMALS a. Underline any birds or animals,which have been observed on or near the site or are ! known to be on or near the site: For the proposed 2006-07 flood repair sites: ! Birds: hawk, heron,eagle,songbirds, other: mountain quail,osprey and waterfowl Mammals: deer, bear,elk, beaver,other: Fish: bass,salmon,trout, herring, shellfish,other: steelhead. b. List any threatened or endangered species known to be on or near the sites. For the general proposal,species vary from site to site.Strict adherence to any permit conditions will help insure no listed species are impacted. For the 2006-07 proposal,with sites located along river shoreline in Skagit and Snohomish Counties,the following species are listed: Bald Eagle—State Sensitive Marbled Murrelet—Federally Endangered Puget Sound Chinook Salmon—Federally Threatened Puget Sound Steelhead—Federally Threatened Puget Sound/Strait of Juan de Fuca Coho—Species of concern Bull Trout—Federally Threatened All approved work windows for fish, bald eagle nesting and marbled Murrelet migration periods will be followed. In addition,other timing requirements for protection to wildlife will be followed on a site-by-site basis. i c. Is the site part of a migration route? If so, explain. Yes,the rivers are migration routes for salmon, steelhead and bulitrout. In addition river habitat 'i may provide rest-over spots for migrating waterfowl. d. Proposed measures to preserve and enhance wildlife, If any: 'j All construction will occur during the designated approved work windows. Existing trees,shrubs and wetland vegetation will not be disturbed. Removal of silt and weed infested soils will help enhance '! water quality and fish and wildlife habitat. 'I i u WDF&W Environmental Checklist-Page 6 I i i is 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy(electric, natural gas, oil,wood stove,solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing,etc. N/A. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. c. What kinds of energy conservation features are included In the plans of this proposal? List other proposed measures to reduce or control energy impacts,if any: None. 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals,risk of fire and explosion,spill or hazardous waste that could occur as a result of this proposal. No. 1) Describe special emergency services that might be required. None required. 2) Proposed measures to reduce or control environmental health hazards,if any: N/A. b. Noise it 1) What types of noise exist in the area which may affect your project(for example: l traffic, equipment, operation,other)? None known. 2) What types and levels of noise would be created by or associated with the project on a short-term or long-term basis(for example: traffic,construction,operation, ' other)? Indicate what hours noise would come from the site. Short-term: Increased levels of noise during construction activities are expected from this proposal. Noise will be generated by heavy equipment removing silt and moving gravel during grading. 3) Proposed measures to reduce or control noise impacts, if any: Construction activities will be restricted to normal operating hours,with increased noise levels expected between 8am to 5pm. 8. LAND AND SHORELINE USE a. What is the current use of the site and adjacent properties? The 2006-2008 sites are existing recreational boat launch facilities.The surrounding properties include agricultural,water Irrigation ditches, dikes and associated facilities, commercial potato harvesting, and single-family residence development. b. Has the site been used for agriculture? If so describe? Many of the sites and surrounding areas along rivers in Washington are historically and currently utilized for agricultural practices. Future flood damage access site are likely located in similar properties. c. Describe any structures on the site. Existing structures at WDFW access sites may include vault toilets,concrete boat launches, signs,fencing,and gates. d. Will any structures be demolished? If so what? An emergency action to remove a vault toilet structure at the Barnaby Slough site was implemented,as it posed an immediate threat to human WDF&W Environmental Checklist-Page 7 L' and environmental health and safety; no further removal of structures is proposed for the 2007-08 repairs. However, should such activities be required for future flood damage repair operations, all applicable federal, state and local permit requirements would be followed. e. What is the current zoning classification of the site? The zoning for the 2006-08 sites,which are located in Skagit and Snohomish Counties vary. Zoning includes Rural Residential, Agricultural,floodway fringe and floodplain. f. What is the current comprehensive plan designation of the site? Local Comprehensive Plan designations of the sites vary and include Parks and Recreational, Rural Residential,Agricultural and Floodplain lands. g. If applicable,what is the current shoreline master program designation of the site? Local Shoreline Master Plans vary and the sites may include Rural, Agricultural, Conservancy or Urban designations. h. Has any part of the site been classified as an "environmentally sensitive"area? If so, specify. None known. Review for environmentally critical and sensitive lands will occur through the local permitting process. 1. Approximately how many people would reside or work in the completed project? None. j. Approximately how many people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None. 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any: The proposal is compatible with existing land use plans since improving public access to the shoreline and recreation are encouraged uses and no expansion of existing development levels is proposed. 9. HOUSING a. Approximately how many units would be provided,if any? Indicate whether high,middle, or low-income housing. None. b. Approximately how many units, if any,would be eliminated? Indicate whether high, j middle,or low-income housing. None. c. Proposed measures to reduce or control housing impacts, if any: None. 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas;what is the principal exterior building material(s)proposed? No structures are proposed. b. What views in the immediate vicinity would be altered or obstructed Not applicable. C. Proposed measures to reduce or control aesthetic impacts,if any: Not applicable. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? No additional light or glare would be produced by the proposal. WDF&W Environmental Checklist-Page 8 'i b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, If any: None. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Swimming,fishing,wildlife viewing and boating activities may occur at the sites. b. Would the proposed project displace any existing recreational uses? If so,describe. No, the project would encourage recreational use by providing improved public access to rivers. c. Proposed measures to reduce or control impacts on recreation, including recreational opportunities to be provided by the project or applicant, if any: This proposal will enhance recreational opportunities and provide safer access to existing launch facilities. 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any places or objects listed on, or proposed for, national,state,or local preservation registers known to be on or next to the site? If so,generally describe. None known. b. Generally describe any landmarks or evidence of historic,archaeological, scientific, or cultural importance known to be on or next to the site. None known. c. Proposed measures to reduce or control impacts,if any.No expansion of the existing boat access facilities is proposed.Only soils which have been previously disturbed by other construction activities will be disturbed. No new soils that have intact and distinct soil horizons will i be disturbed. If historically or archaeologically significant materials(or evidence there of)are discovered during the 2007-08-project implementation,work within 50 feet of the finding shall be halted and WDFW will immediately notify FEMA and EMI)of the finding. FEMA will send a Historic Preservation Specialist out to the location to assess the findings. For future possible flood damage repair activities,all conditions of federal, state and local permits will be followed to help reduce or control impacts to cultural and historical resources. 14. TRANSPORTATION a. Identify public streets and highways serving the site,and describe proposed access to the existing street system. Show on site plans, if any. Existing county roads generally serve these sites. Road access to these sites vary based upon location. II. 1, b. Is site currently served by public transit? If no,what is the approximate distance to the nearest transit stop? Not applicable c. How many parking spaces would the completed project have? How many would the project eliminate? The existing parking areas will not be expanded or reduced. WDFBW Environmental Checklist-Page 9 {{( E : { d. Will the proposal require any new roads or streets,or improvements to existing roads or streets, not including driveways? If so,generally describe(indicate whether public or private). No, the existing footprint of entranceways will not be altered. i e. Will the project use(or occur in the immediate vicinity of)water,rail,or air transportation? i If so,generally describe. No. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. No change to existing conditions. g. Proposed measures to reduce or control transportation impacts, if any: Not applicable. 15. PUBLIC SERVICES a. Would the project result in an increased need for public services(for example: fire protection, police protection, health care,schools,other)? If so generally describe. The proposal should not have any impact on fire or police services. There is no expected impact to local schools or other services. b. Proposed measures to reduce or control direct impacts on public services, If any: Not applicable. 16. UTILITIES a. Underline utilities currently available at the site: Electricity,Natural Gas,Water, Refuse Service,Telephone,Sanitary Sewer,Septic System,Other. Varies from site to site, no changes to existing utilities are proposed. b. Describe the utilities that are proposed for the project,the utility providing the service,and the general construction activities on the site or in the immediate vicinity,which might be needed. No additional utilities will be added. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. SIGNATURE:GCJ (/)�a%�%�i �Y��.F �i'� DATE SUBMITTED: Ivotl �a i WDF&W Environmental Checklist-Page 10 :F 3 i 'k Table 2 WDFW owneg&manage river access-Flood Damage Re a it and Maintenance Site Name Water Body Section Township Range County Faber North Ska it River 0 35N 8E ka it Barnab Slough Skagit River 5 35N 9-1 OE kaciit Skagit City Skagit River 36 34N 03E ka it Spud House Skagit River 36 34N 03E ka it Youngs Bar Skagit River 8&19 34N 4E ka it Hamilton Ska it River 13 35N 06E ka it Birdsview Ska it River 0 35N 10E ka it Lyman South Skagit River 2 35N 6E ka it C.Bo an Grande Rhond Riv 5 7N 44E otin Botts Grande Rhond Riv 2 7N 44E sotin Ebson 1 Grande Rhond Riv 3 7N 46E sotin Ebson 2 Grande Rhond Riv 4 7N 46E otin Ebson 3 Grande Rhond Riv 6 7N 46E otin Ebson 4 Grande Rhond Riv 3 7N 46E otin Heller Bar SnNRe er 1313 46E. otin Lower Kalama River Kaver 2 7N 1 W wlitz ortman LoopKaver 6N 1 W owlitz richards Kaer 5 7N. 1W owlitz n Woodlands Bottom Coliver 15 5N. 1W owiltzRin old S rin s Coliver 412N 28E. rankiinbite Bluffs Coliver 914N 27E. ranklin Buckshot Coliver 14N.23E rant sack Creek W Riv. 618N 8W lallam Ferbache Access Chehalis River 1017N 7W rays Harbor Fuller Bride Chehalis River 17N 6WHarbor Hf hwa 101 Hum tuli s 2ON 10W ra s Harbor ohns RiverJohns River 1 16N 10W dGrays ra Harbor ccess Satso River 419N 7W ra Harbor on Swam Wishkah River 1818N 9W ra Harbor ,,Morley Hum tuli s 1518N 11W Grays Harbor akville#1 Biack River 316N 4W GraysHarbor akville#2 Chehalis River 5 15N 5W GraysHarbor it Site Satsop River 31 18N 6W Grays Harbor orter Bride Chehalis River 2817N 5W Grays Harbor Re nvaan Bar Hum tuli s 11 19N 11W Grays Harbor South Montesano Chehalis River 1817N 7W Grays Harbor Thorberg Hum tuli s 33.19N 11WGrays Harbor G West Branch Satsop River 2318N 7W GraysHarbor est Branch Wishkah River 2319N 9W Grays Harbor hite Bride W noochee Riv. 2819N 8W Grays Harbor hite Bridge West W noochee Riv. 2819N 8W Grays Harbor ' ouble Bridges Satsop River 3618N 7W Grays Harbor ' horton Satsop River 1 17N 7W Grays Harbor i Quilcene Quilicene River 22 27N 2W Jefferson Duckabush Duckabush River 1 25N 2W Pefferson f M organs Crossing_ Hoh River 8 27N 11 W Oefferson Table 2- continued Site Name Water Body Section Township Range County Plum#1 Sno ualamle 4 24N 7E Kin PLUM#2 Sno ualamie 4 24N 7E Kin oos Creek Green River 17 21 N 5W Kin Lower Tolt Tolt and Sno Riv 1 25N 7E Kin Lake Washin on Sammamish Riv 11 26N 4E Kin D kstra Green River 7 21 N 5E Kin arnation Sportsman Club Upper Tolt River 12 25N 7E Kin ging River Sno ualamie 14 24N 7W <ing Richter#1 Sno ualamie 9 24N 7E in Ricter#2 Sno ualamie 3 24N 7E in ahu a Tahu a River 14 23N 3W Kitsa Teanaway Junction Yakima River 5 19N 16E Kittitas Thrall Yakima River 31 16N 18W Kittitas Leidi North Klickitat River 12 5N 13E Klickitat Leidi South Klickitat River 12 5N 13E Klickitat Mineral Springs Ice House Klickitat River 24 4N 13E Klickitat Stinson Flats Klickitat River 18 5N 14E Klickitat Turkey Hole Klickitat River 18 3N 13E Ockitat 1-5 Cowlitz River 2611 N 2E ewis Masse Bar Lewis River 11 N 1 W ewis North Shore Road Union River#1 32 23N 1W ason chaefer State Park Satso River 19N 2W ason mith Skokomish River/ 21 N 4W ason Union River Access Union River 5 27N 2E anon obcat Chewack River 3 36N 21 E kana an Boulder Creek(Bryson) Chewack River 5 36AN 21 E kana an ordell-New Pump Okanagan River 34 39N 27E kana an ordell-Old Pump Okanagan River 10 39N 27E kana an utchie#1 Similkemen Riv 5 40N 25E kana an utchie#2 Simiikemen Riv 16 40N 25E kana an utchie#3 Similkemen Riv 23 40N 25E kana an utchie#4 Similkemen Riv 8 40N 26E kana an Driscoll Island Okanagan River 3 39N 27E kana an Eiffert access Methow River 29 32N 22E kana an Elbow Coulee TWsp River 9 33N 21 E kana an Eilisford Old Pump Okanagan River 26 38N 27E kana an Haltermans Hole Methow River 20 33N 22W kana an Hi hwa 97 Bride Okanagan River ON 27E kana an Markham Methow River 33N 22E kana an Neff Bride Methow River 8 30N 23E kana an Rawie Methow River 5 30N 23W kana an Riverside Okanagan River 5 35N 26E kana an Shrew Chewack River 13 36N 21 E kana an nnos Easement Naselle River 1010N 9W Pacific Hi hwa 4 Naselle River 1010N 9W Pacific alix River Pal ix River 15 13N. 10W Dacific Resort Hotel Naselle River 10N 9W acific mith Creek Smith River 3515N 10W acific a 1 Table 2- continued Site Name Water Body Section Township Range County Wilson Creek Willa ah River 2714N 8W Pack Ruby Ferry Pend Oreille River 19 35N 44 Pend Oreille Sumner Sportsman Puyallup River 31 20N 5E Pierce Weiss Puyallup River 719N 5E Akaoit ierce amish North Samish River 35N.4E ka it ConwaySkagit River 18 33N 4E ka it edro Wool Ska it River 35N 5E ka it Fabers FerrySouth Skagit River Arlington School Dist Cicero Stilla uamish Riv 9 32N 8W Snohomish Baehlor Sk komish Riv 14 27N 6E Snohomish Big Ditch Skagit River 12 32N 3E Snohomish Fortson Hole Glad"o Stilla uamish Riv 12 32N 8E Snohomish Hammer Sofie Sk komish Riv 4 27N 7E Snohomish Hoover Thomas Eddy) Snohomish River 31 25N 6E Snohomish Yonkers Sk komish Riv 5 27N 8E Snohomish Jordan Store#1 Stilla uamish Riv 28 31N 6E nohomish Koo er Lewis ST Sk komish Riv 12 27N.6E nohomish Lawson Snohomish River 19 28 6E nohomish Simmons Skykomish Riv 8 27N 9E nohomish no Count Hi h Bride Sno ualamle River 26 27N 6E Snohomish ortman Park Sultan Sultan River 27N 8E Snohomish Black River Gate Black River 16N 4E Thurston Littlerock Black River 1416N 3E Thurston Nisqually HNDCP Nisqually River 18N 1E rhurston kookumchuck Skookumchurck R 1815N 1 E rhurston Brooks Creek Elochoman R. 32 9N 5W Nahkiakurn Brooks Slough Elochoman R. 16 9N 6W Nahkiakurn DOT Site(Grange) Grays River 2310N 8W Wahkiakum Fossil Creek Grays River 9 10N 7W Wahkiakurn Puget Island Columbia River 25 8N.5W Wahkiakum Upper Elochoman Elochoman R. 29 9N 5W Wahkiakum Harksell Nooksack River 34 ON 2E Whatcom Dearoot Nooksack River 36 ON 2E Whatcom Nu gents Corner Nooksack River 28 39N 4E Whatcom Benton City Yakima River 19 9N 27E Benton Fitzsimmons Yakima River 7 11N 20E Yakima Gannon Yakima River 0 9N 23E Yakima Hammerstad Naches River 5 14N 17E Yakima MC Cormick Naches River 13N 18E Yakima Mellis Road Yakima River 12N 19E Yakima South Emerald Yakima River 6 9N 23E Yakima a ato Dam Yakima River 1712N 19E Yakima Waterworks Naches River 2414N 18E Yakima Zillah Bride Yakima River 2710N 20E akima Ferndale Nooksack River 29 39N 2E hatcom Steel Bride Washougal River 31 2N 5E kamania Cott Property Yakima River 13 9N 17E enton histran Chandler Canal). Yakima River 33 9N 25E akima Table 2 - continued Site Name Water Body Section Township Range County Thorpe Property Yakima River 19N 17E akima Teanaway Property Teanaway River 5 20N 16E Kittitas Mile Post 10 Yakima River 1519E Ockitat ile Post 8 Yakima River 1 15N 19E Ockitat Naches Naches River 11 14N 17E rYakima i