Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MEP2007-00061, SEP2007-00093, SHX2007-0054 JARPA and Geotechnical Report Review - MEP Permit / Conditions - 6/21/2007
Will I ���If oN.STATF MASON COUNTY 4Ps MD DEPARTMENT OF COMMUNITY DEVELOPMENT o N _ Planning Division i� N y Y P O Box 279, Shelton,WA 98584 1864 (360)427-9670 MASON ENVIRONMENTAL PERMIT September 06, 2007 MIKE MURRAY 3801 NE AMBLESIDE LN BREMETTON WA 98311 Parcel No.: 223305000902 Issued: 9/6/2007 Case No.: MEP2007-00061 Project Description: Bulkhead and Retaining Wall ATF The following critical areas are present on this property: Long-Term Commercial Forest X FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01,090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit,with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Government Official Date Mason Environmental Permit 9/6/2007 Case No.: MEP2007-00061 Conditions: 1.) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). 2.) All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degredation of State waters. 3.) Approved per dimensions and setbacks on submitted site plan. 9/6/2007 Page 2 of 2 MEP2007-00061 Cy �P C7'�JU� 'v�� PERMIT DATE RECEIVED: (0 — —O MASON COUNTY NT OF COMMUNITY DEVELOPMENT E ORDINANCE (Chapter 17.01 MCC) } ❑ �� ^ /'�lL� Street/P.O. Box 279, Shelton, WA 98584 WENTAL PERMIT APPLICATION =NTAL PERMIt"s7 CONDITIONAL USE ❑ is to protect Mason County's natural resource lands and critical )ters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 .wrr. PLEASE PRINT 1. Owner: M1CU60-ft20 Owner Mailing Address: 38�1 AmgueM06 uj Site Address: ,��A 191 m IVY �h1YA &AFAdW 6l& 4�1 City: 890n6v� State:�'N Zip: si City: A State ZipJ Lien/Title Holder Phone: Daytime Address: Fire District#: 5 City: State: Zip: Signature: $-JA ke 2• Parcel Number: Legal description: - Z09 Parcel Size: t/3 ac" 3. Directions to site: T-A%M e—G1$-VSM t_M GO -ro ?a W-6 OPW State what sections require a permit: In-Holding Lands, Chapter 17.01.062 ❑ 4' Long-Term Commercial Forest,Chapter 17.10.060 ❑ Wetlands,Chapter 17.01.070 ❑ Mineral Resource Lands, Chapter 17.01.066 ❑ Frequently Flooded Areas, Chapter 17.01.090 ❑ Aquifer Recharge Areas,Chapter 17.01.080 ❑ Landslide Hazard Areas,Chapter 17.01.100 ❑ Erosion Hazard Areas,Chapter 17.01.104 ❑ Seismic Hazard Areas,Chapter 17.0 1.IN ❑ Fish and Wildlife Habitat Conservation Areas,Chapter 17.01.110 `m I' {i Identify current use of property with existing improvements: Ktrst��,et• No CuxtsN-r t�nu�t�.S QN S>t6. A9PUC%rr WISAC.s -Th caa-'!ra T NW 3 - V ADD j'4,2; SWim Ft m. Dta6 To 3txtci 6. Identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions and other pertinent information(Attach additional sheets if needed): Be S*C1 W0C0QDrn6 01 Wz` O —C*1k'10SK6 8yC8 9+Jin, F1.�olYt, �EYtQ6 FiT��+�16 `t3o+`� 'F�StJIMN6�*' �,. 7. W'11 there be an alteration of a wetland and/or wetland vegetation area? Y AW,&. W'w R6q �j U/Nbnu6 d.1� CDr►S�Sr fZfs> c A(1+i S,Latr, st�c� Ff 1A AB 1 Q•aPQ� 6 8. Any water on or adjacent to pr rty: Saltwater ❑ Lak River ❑ Pond ❑ Wetland ❑ Seasonal Runoff ❑ Other 9. If septic is located on project sit Nulude records. Connect to septic?`E] Community Septic? 0 Public Water Supply? ❑ WeIN 10. � � Type of Job: New ❑ Add ❑ Alt 0 Repair ❑ Demolition`e] Other �� pttlypt�� ,/ C.\A-.o —z REeLujs ko/NW %TL- This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $510.00/$305.00(with another permit) MASON CONDITIONAL USE ENVIR.PERMIT: $1,225.00 HABITAT MANAGEMENT PLAN: $360.00 IAPLANNING\C&R\ENVIRONMENTAL REVISED 09-14-05 t r Show the following on the site plan Lot Dimensions Flood Zones Existing Structures Fences Water Lines Driveways Drainage Plans Shorelines Septic System Topography Indicate Directional by(N,S,E,W,etc.) Proposed Improvements Easements In relation to plot plan Name if Flanking Street APPLICANT TO DRAW SITE PLAN BELOW: APPLICANT TO DRAW TOPOGRAPHY BELOW: I r �UASbN COUNTY RESOURCE ORDINANCE July 2003 Publication cost is the responsibility of the applicant. Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant. The Shelton-Mason County Journal will bill the applicant directly. I /WE understand that I /WE must sign and date the attached acknowledgment indicating and that I / WE understand that is MY/ OUR responsibility. I /WE must submit the signed page as part of application in order for it to be considered as complete. DATE OWNER APPLICANT 00 ul z Lo d Y � X ci �! 5 C4 _ Cj COS Q J 3 a vt VI * �K Ii co Ir ir tl ` v' 1 fi 6 = o) y � e � 4 �r- 4 9 _ zff7 Y !- h— O- a co U z a � � 2 _1 .1 114 N cc% a J 3 r � -4 y 3 a T- — — � t Ir s ,r cl r Al N a- ro �p.iMlYiilY tlVMI .�Y�YIYiIYYC•� -..... co ICIT Fg 3 0 i j Dco �N 0 I` f J F I �r1� it 1.9 e 4 9 Y �wirrr .nirrr+riw ON.STA MASON COUNTY �Py Mo °y DEPARTMENT OF COMMUNITY DEVELOPMENT Y AS v = Planning Division z °x T z P O Box 279, Shelton,WA 98584 �oJ Y moo" (360)427-9670 1864 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00093 Description of Proposal: Bulkhead and Retaining Wall ATF Proponent: MIKE MURRAY Site Address(If Assigned): 1910 NE TAHUYA BLACKSMITH RD TAHUYA Directions to Site: Haven Lake Parcel Number: 223305000902 Legal Description: HAVEN LAKE TR. 210-A Lead Agency: Mason County p' The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Charles Mead McCoy III at ext. 294 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 8/13/2007. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. 3b— o+ A orized Loc Government Official Date 3! j. F' 1 I MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00093 CONDITIONS OF THIS DETERMINATION MASON COUNTY DCD Sent SEPA 9� ^OOtW a to(check all that apply)on —b�- Skokomish Tribal Nation WA Department of Ecology Natural Resources Dept. Environmental Review Section ATTN: Marty Ereth PO BOX 47703 N 541 Tribal Center Rd. Olympia,WA 98504-7703 Shelton,WA 98584 Quinault Indian Nation U.S.Army Corps of Engineers ATTN: Mark Mobbs SEPA Reviewer PO Box 189 PO Box C-3755 Tahola,WA 98587 Seattle,WA 98124 Squaxin Tribal Nation WA Dept.of Fish and Wildlife Natural Resources Dept. ATTN: Margie Schirato(saltwater) 2952 SE Old Olympic Highway 2391 W Deegan Rd. Shelton,WA 98584 Shelton,WA 98584 a The Confederated Tribe of the Chehalis WA Dept.of Fish&Wildlife ATTN:SEPA Reviewer ATTN:Gloria Rogers(freshwater) 420 Howanut Rd. PO Box 695 Oakville,WA 98568 Elma,WA 98541 Shannon Soto a WA Dept.of Transportation WA DNR,South Puget Sound Region Alana Hess, Development Review Engineer 950 Farman Avenue North P.O.Box 47440 Enumclaw,WA 98022-9282 Olympia,WA 98504-7440 Elizabeth Ellis 0 City of Shelton WA DNR,Aquatic Resources 525 West Cota St. PO BOX 47027 Shelton,WA 98584 Olympia,WA 98504-7027 Office of Archeaology&Historic Preservation Boyd Powers ATTN:Stephanie Kramer WA DNR,SEPA Center P.O.Box 48343 PO BOX 47015 Olympia,WA 98504-8343 Olympia,WA 98504-7015 School District: Olympic Region Clean Air Agency 2940-B Limited Ln. NW Mason Cty Public Works ATTN: Olympia,WA 98502 ED Mason Cty Env. Health ATTN: Mason County Transit PO Box 1880 Agent: Shelton,WA 98584 0 Applicant: MASON CO. ENVIROMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Wrz"Y f*19mias 2. Name of applicant: 1AtC14AEL 4 KWF- MVWAY 3. Address and phone number of applicant and contact person:3MI ArnsursioE LN WQ 99311 4. Date checklist prepared:(p I I&lz=q 5. Agency requesting checklist: V05cb► COU414 6. Proposed timing or schedule (including phasing, if applicable): 1550 bv3 Ftuw% omr- 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: If yes, explain. A GARAC-4- 's 0019-0 10 'mE FuxwzE-j APqRq�, 2 %t&u om. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. GW'>Et,►Uc&- �•t-�-t� i�ss��1:E w4-nAaol, ��OA 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain.:ZYW-d 10. List any government approvals or permits that will be needed for your proposal, if known. i 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on pro ect description.) Cows.' maE 5M Aw 1'`�� %A %fi r aN gar aft 113 � r .,, . A&V8J LAXF- fUCWAGE A� Aon 8'x�' sw i►Y. F�r. Rsru2 F ?1045 -ro �LO PES�"&4 T' D=CU_ 'w L. 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Tme Srrc vAcQeAy is: 1510 NE -Alt*- 94 IZA►W4" 14 91; sm 'Mc- TW 1u-S IS: ZZ 350- sm- �2 002m9 sEc 23�a 20 B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one): Flat, rolling, hilly, stee slope mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 7�/ � ,vuG5E oa6 -mmA:a6ey. Cvc wjm&x. C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. SA"DI d. Are there surface indications or history of unstable soils in the immediate vicinity: If so, describe. *Jar KNWO, Mason County Environmental Checklist Page 2 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. Z Z01105 Fll.d, �{11NN/ ,,�J fw,1omvi W u.- .* { EMWIN(r- (44tk.- f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. "RtP►cei. E�tos►owl CoNcac�. lssl�s ' �+� � g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)?L 1 15l h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: MINIJnIZC. MMS LWfaOTEC rEo SULs eaE GMV*e) $y caw*I mK), u&QataMIL AS soot.) W PMS18LrE• ADEco&Tc— %ze M SILT FtNufJ(, a CR1v, m"LOMUL C.oMiot�,� �a r►ntr����zC 6wCy1o►!, 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. 'Ne►cpL ► owas-nay, cwrrc Kvo, Zvs"- 4wwx tJ ' a '"Q"L tows wcn ap 'C QU%# **OJT EMMUSx'1& b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. W" O-WO Mason Count Enviromnental Checklist Y Page 3 C. Proposed measures to reduce or conN �of emissions or other impacts to air, if any: 3 WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. , Co �cnora SF2 e mw im' w'raum-. Few•. uwcA:s coG6. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. µ W—. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. �. I I Mason County Environmental Checklist Page 4 WWWYWYYi-IIWYII Y 5) Does the proposal lie within a 100-year floodplain? If so, notetlocat n on the site plan. I OU�bi-, h1b. �-`I '�T %%V9ioN 6V -M PAFJJG- WI1OG iC � 'uE VW 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. lb. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. M. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals..., agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. Mu)cwr f� teseeA%&L O.Ssv>S (3SQ) -'Wt%JIOG aQ& 36a-SM. C. Water runoff (including storm water): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so,.describe. -Aag/DwV&Apy, Thesw" cl p Farms SP�4su81-oc-u-S. 2) Could waste materials enter ground or surface waters: If so, generally describe. I� Mason County Environmental Checklist Page 5 _.... 1/ �Ii1�Il01fifINIrI17�O�I d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: NA 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other �-� evergreen tree: fir ced , pi they shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation {tp*iS b. What kind and amount of vegetation will be removed or altered? W Attmo&L&_ VSC-Oh- OO WCOW . C. List threatened or endangered species known to be on or near the site. to" kxo►,.W. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: ►-A►O5c.e"%*3G 141u- ca"`Q�"'""b1''r rwxve VEA"'nW.0 -Q3'q'DC~ ly Ot It—re. Uo"C&—C AVP-4 OL6L DPQ1Jtd+ir ��►- R�,,QE u1C�1�N (2l��e�� S�-�W: v6b�rpr�l A5 O�GEC-� Mason County Environmental Checklist Page 6 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron,Q5 songbirds, other Mammals: d bear, elk, beaver, other Fish: ass salmo troy herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. C. Is the site part of a migration route? If so, explain. NOT Icwwwu d. Proposed measures to preserve or enhance wildlife, if any: Nmib P hk*Abo. mtAtaw WtU. WmPt,Y WWA NVY V&0+ 41l- RM&NeP S. 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. EL*txaac. TQWA**, F%a4r AG6 Lq 1294 AWL-W&4* b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. hb. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: '(�� W%u. wwwr VP- I9►wftk- 12.,20o3 W"wA., coa6s) os weu. 4s WSeX_/'J1AGL. Mason County Environmental Checklist Page 7 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. W. 1) Describe special emergency services that might be required. 44 2) Proposed measures to reduce or control environmental health hazards, if any: NIA b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? NOY., . 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. T-mcdt— Avo ptwV_ T»%- 9wwo GF^14;flvw VBArt*)b T- F6S%0 "tN1. 3) Proposed measures to reduce or control noise impacts, if any: 0 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? J�eslo&jTot Mason County Environmental Checklist Page 8 b. Has the site been used for agriculture? If so, describe. Np C. Describe any structures on the site. *N6 d. Will any structures be demolished? If so, what? at", #A CAP O W �Mo�Ep e. What is the current zoning classification of the site? f. What is the current comprehensive plan designation of the site? Rua6L, g. If applicable, what is the current Shoreline Master Program designation of the site? LA2-%AN h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. N aR exxa-*. i. Approximately how many people would reside or work in the completed project? j. Approximately how many people would the completed project displace? 0 k. Proposed measures to avoid or reduce displacement impacts, if any: N1A I Mason County Environmental Checklist Page 9 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: M'OP Cory VALIMM& 9Ca Mrr '* Z WZCOL -91979 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. I - weed b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. a C. Proposed measures to reduce or control housing impacts, if any: N14 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? ��'. LL\00;*,,,o (bV061TF s�h�rxT, b. What views in the immediate vicinity would be altered or obstructed? NCO* C. Proposed measures to reduce or control aesthetic impacts, if any: Olt, Mason County Environmental Checklist Page 10 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? No C. What existing off-site sources of light or glare may affect your proposal: pJA d. Proposed measures to reduce or control light and glare impacts, if any: N11A 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? $q�n►►(,�� SW��,N,.�tJa, GIS+a�Alr, Wdl1t�►�11.� Ex.. b. Would the proposed project displace any existing recreational uses? If so, describe. no, C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: N 1A i Mason County Environmental Checklist Page 11 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or-next to the site? If so, generally describe. N 0 b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. WvQr,- KtiLww, C. Proposed measures to reduce or control impacts, if any: N[A 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. AWE. Ptam b. Is site.currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. N'o C. How many parking spaces would the completed project have? How many would the project eliminate? >2 . euw%%0rn1P% Qu t . d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No. Mason County Environmental Checklist Page 12 e. Will the project use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. 00. f. How many vehicular trips per day would be generated by the completed project: If known, indicate when peak volumes would occur. Aw, a�-ru�E, RQS'vEN>n at_ cw•�a v51Gb�Nt�. g. Proposed measures to reduce or control transportation impacts, if any: N14 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? Ala. If so, generally describe: b. Proposed measures to reduce or control direct impacts on public services, if any: N� Mason County Environmental Checklist Page 13 16. UTILITIES: a. utilities currently available at the sit( electricit natural gas, +vats , use se e teleph e, sanitary sewer, mfgs s , other: b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. P'W p,m'w'-me$ f&O a Wr %14 -%PW%C'E tyonXv 6 -R ct�nou6-�j R�MAiW. Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Le d'& Date submitted: ~Zt D 7 Mason County Environmental Checklist Page 14 ESA LISTED SALMONIDS CHECKLIST Auplicant Information Project Information Name MW-AAcL M uRA / Name MOZW 4OVW-- Phone -5c -5W-4293 Location19lo W W*Nh 0 VAN*,,WA Description taYmpgr STIL(344 This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids"is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. 1. Are`J�SA listed salmonids currently present in the watershed in which your project will be located? YES �', NO Please describe. 2. Has ere ever been an ESA listed salmonid stock present in this watershed? YES NO Uncertain Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. i i I I I I April 2003 Mason County Environmental Checklist Page 15 PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity. 1. Name of watershed: &C4J IAk-:. 2. Name of nearest waterbody: kpwv kK 3. What is thi distance from this project to the nearest body of water: 3$ . Often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4. What is the current land use between the project and the potentially affected water body (parking lots, farmland,etc.)? 5. Is the project above a: * natural permanent barrier(waterfall) YES NO, * natural temporary barrier(beaver pond) YES N ` * man-made barrier(culvert, dam) YES NO * other(explain): 6. If yes, are there any resident salmonid populatio laabove the blockage? YES NO Don't know NN 7. What percent of the project will be impervious surface (including pavement &roof area)? Mason County Environmental Checklist Page 16 FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal a. Surface water? YES NO Amount Name of surface water body b. Ground water? YES NO Amount From where Depth of well 2. Will any water be rerouted: YES NO If yes,will this require a channel change? 3. Will there be retention or detention ponds? YES NO 4 If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface water discharge,please give the name of the waterbody. 4. Will this require uire the building of new roads? YES NO J q Increased road mileage may affect the timing of water reachinga stream and may impact fish habitat. S Y g Y P 5. Are culverts proposed as part of this project? YES NO V 6. Will topographyAanges affect the duration/direction of runoff flows? YES NO If yes, describe the changes. 7. Will the project involve any re,-\dkction of the floodway or floodplain by filling or other partial blockage of flows? YES NO If yes, how will the loss of flood storage be mitigated by your project? Mason County Environmental Checklist Page 17 WATER QUALITY: The following questions will help determine if this project could Adversely impact water quality. Such impacts can cause problems for listed species. Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging contaminants,etc. I. Do you know any problems with water quality, in any of the streams, within this watershed? YES NO If yes, describe. 2. Will your projec 'ther reduce or increase shade along or over a waterbody? YES NO Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade. 3. Will the project increase nutrient loading or have the potential to increase nutrient loadi or contaminants (fertilizers, other waste discharges, or runoff)to the waterbody? YES NO 4. Will turbidity ee creased because of construction of the project or during operation of the project? YES NOS ICU- " wti.,� VS& -UW*-1 -ro FWSMCz 4TalarAet.xt3r< ;h� su_TM1W In-water or near water work will often increase turbidity. 5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting, and chemical sprays for vegetgioiZ management, clearing of parking lots? YES NO If yes,please describe. G Mason County Environmental Checklist Page 18 VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation,thereby,adversely impacting salmon. 1. Will the project invoo the removal of any vegetation from the stream banks: YES NON, If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2. If anIi�egetation is removed, do you plan to re-plant? YES �, NO If yes, what types of plants will you use? � 3, SALAL,SWaz� I I'. I Mason County Environmental Checklist Page 19 STATE pt. ak =RP STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775• Olympia, Washington 98504-7775 • (360)407-6300 August 13, 2007 Mr.Charles Mead McCoy III Your address Mason County is In the Department of Community Development KitSdp Planning Division watershed PO Box 279 Shelton,WA 98584 Dear Mr.McCoy III: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Murray-(After the Fact)Bulkhead&Retaining Wall Construction and Single-Family Residence Construction project(SEP2007-00093)located at 1910 Northeast Tahuya Blacksmith Road in Tahuya as proposed by Michael and Marie Murray. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): SHORELANDS: Sarah Lukas(360)407-7459 The proposed activities are regulated by the U.S.Army Corps of Engineers,Ecology,and the Department of Fish and Wildlife. It appears that the applicant has completed some of the proposed work in this proposal,but it is unclear what work was completed,or if it is in construction. If the applicant has already completed some of the proposed work it may be considered a violation, depending on the impacts to the natural resources. I recommend the applicant stop any work in progress and wait until the necessary permits are acquired for the proposed activities. I suggest the applicant submit a Joint Aquatic Resources Permit Application(JARPA)for this proposal to all of the above agencies. The JARPA should clearly outline the proposed work and specify what work has already been completed. I also recommend the applicant contact Mason County for further consultation regarding this proposal to ensure all the necessary permits are acquired for this project. WATER QUALITY: Roberta Woods(360)407-6269 Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW,Water Pollution Control,and WAC 173-201A,Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. Erosion control measures must be in place prior to any clearing,grading,or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt,clay particles, and soil will damage aquatic habitat and are considered to be pollutants. i�� August 13,2007 Page 2 During construction,all releases of oils,hydraulic fluids,fuels,other petroleum products,paints, solvents,and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over other work on the site. Proper disposal of construction debris must be on land in such a manner that debris cannot enter the Haven Lake or cause water quality degradation of state waters. All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. Fresh uncured concrete in direct contact with the water is toxic to aquatic life. All concrete shall be poured in the dry and allowed to cure a minimum of seven(7)days before contact with water. Ecology's comments are based upon information provided by the lead agency. As such,they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM: 07-6121) cc: Sarah Lukas, SEA Roberta Woods,WQ Michael and Marie Murray(Applicant/Contact) � � �` % � . : /\ 1�/ 2� ` � . ��� . . . �y «2 . . `d �.�� \ � . � � . � �\����: . : . � � ^\�. \��\. . � y� y\ < � �/ »© »��f� \ :» \ � � - � ��"� � � �\\\������ � <�\ ^ \ \ \ \§� , . >� >x . . . y } . ' \� ƒ��%ƒ°d� � ± � / \% . �\\\:����\ d\. _ : w� e y > . . } . . aa, . ?} ~ �©2��\ . � <« , : . � ` .«�» «» .� /��~ � © w� z . � � �����§ -� � � Z � f: ? ^ w_ . � �.�y� w \. .\ � « »�\. . < ; sTarE o� 4 �tM'9�� State of ashington DEPARTMENT OF FISH AND WILDLIFE 48 Devonshire Road Montesano,Washington 98563-9618(360)249-4628,TDD(360)902-2207,Fax(360)664-0689 July 30, 2007 Michael Murray 3801 NE Ambleside Ln Bremerton,WA 98311-9648 Dear Mr. Murray: SUBJECT: After-The-Fact Hydraulic Project Application; Install Bulkhead; Haven Lake; Section 30, Township 23 North, Range 02 West, Mason County, WRIA 15.0461, WDFW Log No. 110064-1 The Department of Fish and Wildlife(WDFW)received your application for a Hydraulic Project Approval (HPA) on July 2, 2007;however,the project has already been completed. The Revised Code of Washington(RCW 77.55.100) states "in the event that any person or government agency desires to construct any form of hydraulic project or perform other work that will use, divert, obstruct, or change the natural flow or bed of any salt or fresh waters of the state, such person or government agency shall, before commencing construction or work thereon and to ensure the proper protection offish life, secure the approval of the department[WDFWJ as to the adequacy of the means proposed for the protection offish life." No HPA was issued prior to completing this work. WDFW does not issue after the fact HPAs. Consequently, your application has been rejected and is being returned to you. As HPAs must be secured prior to any work within state waters and any work done without a HPA is a violation of the State Hydraulic Code, a copy of this letter will be forwarded to WDFW's Enforcement Program. If you have any questions,please contact me at(360)249-4628 x 249. Sincerely, Gloria Rogers Area Habitat Biologist Cc: WRIA 15 File, Olympia Captain Brinson, Region 6 Enforcement Chuck McCoy,Mason County Department of Community Development Greg Spencer, Authorized Agent _STA MASON COUNTY c DEPARTMENT OF COMMUNITY DEVELOPMENT o a u Planning Division t'- o T Z P O Box 279,Shelton,WA 98584 0 OJ N Y y (360)427-9670 �O 1864 Exemption from Shoreline Management Act Case No.: SHX2007-00054 Substantial Development Permit Requirement The Proposal By: MIKE MURRAY 3801 NE AMBLESIDE LN BREMETTON,WA 98311 To undertake the following development: Bulkhead / Retaining Wall ATIF Within Haven Lake and/or its associated wetlands is exempt from the requirement of substantial development because the development is categorized under WAC 173-27-040(2)as being category G-single family residence Please contact Charles Mead McCoy III at ext 294 if you have ny questions. Issued: 9/6/2007 Expires: 9/6/2009 Authorized Local Gover ent Official cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL f MURRAYI 6-26—** 15:57 Murray Residence Static Cond. 160 10 most critical surfaces, MINIMUM BISHOP FOS = 1 .550 140 a 120 — m w- N X Q 100 80 60 0 20 40 60 80 100 120 140 16 X—AXIS (feet) LL O F U w rc a A E Murray Residence Figure LANDAU 1910 Tahuyu Blacksmith Road Results of Slope Stability [A ASSOCIATES Mason Countv.Washinaton Evaluation MURRAY2A 8-22—s. 8:08 Murray Residence Static Cond w/hous 150 10 most critical surfaces, MINIMUM BISHOP FOS 2.797 125 House m 100 m N Q 75 50 25 0 25 50 75 100 125 150 175 200 X—AXIS (feet) MURRAY28 8-22—+* 8:10 Murray Residence Seismic w/house 150 10 most critical surfaces, MINIMUM BISHOP FOS = 1.760 125 House m 100 m (n X Q 75 } lL W 0 50 F U 0 O a 25 9 0 25 50 75 100 125 150 175 200 X—AXIS (feet) Murray Residence Results of Slope Stability Figure LANDAU Tahuyu Blacksmith Road ASSOCIATES Mason Countv.Washinaton Evaluation - Post Construction MURRAY4 8-21-** 16:19 South of House — Static 240 10 most critical surfaces, MINIMUM BISHOP FOS = 1.792 200 i 160 m v N_ X Q 120 I 80 40 0 40 80 120 160 200 240 280 320 X—AXIS (feet) MURRAY5 8-21-** 16:08 South of House — Seismic 240 10 most critical surfaces, MINIMUM BISHOP FOS = 1.279 200 a 160 m N Q 120 m IL $ 80 O U w O EL EL 40 r 9 0 40 80 120 160 200 240 280 320 X—AXIS (feet) a c m i MurrayResidence Figure 1910 Tahuyu Blacksmith Road Results Of Slope Stability s LANDAU ASSOCIATESMason Countv.Washinaton Evaluation —South of House 6 AGENCY USE OtdLY JenFy Aerorcdca#* Late Rect. MV:4i JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM (JARPA) (for use in Washington State) PLEASE TYPE OR PRINT IN BLACK INK. TO FILL IN ELECTRONICALLY,USE F11 TO MOVE THROUGH THE FORM ❑ Application for a Fish Habitat Enhancement Project per requirements of RCW 77..55.290. You must submit a copy of this completed JARPA application form and the(Fish Habitat Enhancement JARPA Addition)to your local Government Planning Department and Washington Department of Fish&Wildlife Area Habitat Biologist on the same day. NOTE: LOCAL GOVERNMENTS—You must submit any comments on these projects to WDFW within 15 working days. Based on the instructions provided,I am sending copies of this application to the following: (check all that a ly) ❑ Local Government for shoreline: []Substantial Development ❑Conditional Use []Variance ��n ❑Revision ❑Floodplain Management []Critical Areas Ordinance ❑ Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region) ❑ Washington Department of Ecology for 401 Water Quality Certification(to Regional Office-Federal Permit Unit) ❑ Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification ❑ Corps of Engineers for. ❑ Section 404 ❑ Section 10 permit ❑ Coast Guard for. ❑ General Bridge Act Permit ❑ Private Aids to Navigation(for non-bridge projects) ❑ For.Department of Transportation projects only: This project will be designed to meet conditions of the most current Ecology/Department of Transportation Water Quality Implementing Agreement SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications. 1.APPLICANT MAILING ADDRESS 38M 1E ,dM6L1EfAoE L� _%311. WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# ff an agent Is acting for the applicant during the permit process,complete#2. Be sure agent signs Section C(Signature Block) for all permit applications 2.AUTHORIZED AGENT C7�EC MAILING ADDRESS 1351 sW a I,J ,{ TOU90 WA %3(4-9354 WORK PHONE E-MAIL AQDRESS HOME PHONE FAX# "SW-QO 2293 ra&-taw+c.r%,L+ 1-366- 3.Relationship of applicant to property: OWNER ❑ PURCHASER ❑ LESSEE ❑ 4.Name,address and phone number of property owner(s)if other than applicant: 5.Location(street address,including city,county and zip code,where proposed activity exists or will occur) Local government with jurisdiction(city or county) Waterbody you are working in 44A1IW L" Tributary of WRIA# Is this waterbody on the 303(d)List" YES NO 15 If YES,what parameter(s)?'IDTAL- PUoSp "For 303d List, Shoreline designation hftp://www.ecv.wa.gov/proarams/wa/303d/index.html Zoning designation '/.Section Section I Township I R nge Government Lot 230 2 W DNR stream type if known �Latilude and Longitude: 4..t'rj(p} 112 jqt5 5 —Fax Parcel Number 22330 Jep ip2m9 ECY 070-15(Rev. 11104) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 3601407-7037 or 800/917-0043 1 6. Describe the current use<the property,and structures existing on the property.. Have you completed any portion of the proposed activity on this property? -] YES ❑ NO For any portion of the proposed activity already completed on this properly,Indicate month and year of completion. 6 MC.'IA NlS LIM cif; WA& PQwetity L163 BE6lN V11M APINAL�i�EtA�.aR��+�. "RIMS Paos*-a P00fdOJER A 3.W- SFrs tta- V65vMW1ft& wX. -r&%S Pawmv "flhd?MMIj D too rao miE* «.144 StTG IS 0"&A A'ICO nth PIt&DaAbO WCpi. Fban&K* OUr Ob ftW-W� us3 t3 W '{tyl . Is the property agricultural land? YES NO Are you a USDA program participant? YES �] NO 7a. Describe the proposed work that needs aquatic permits: Complete plans and specifications should be provided for all work waterward of the ordinary high water mark or line,including types of equipment to be used. If applying for a shoreline permit,describe�I work within and beyond 200 feet of the ordinary high water mark. If you have provided attached materials to describe your project,you still must summarize the proposed work here. Attach a separate sheet if additional space is needed. 'ts�Q. FSusruJ6 �►arttcyso rrooE ea asevJc.� sra�E.. t16ttLILNb1� p i� >Mm¢6 $;,c g' � �-a I M VLOA . -W5 le6 'K- x' g I-1 2W*bmwJayr tr:lc_ P� QE3raah PREPARATION OF DRAWINGS: See sample drawings and guidance for completing the drawings. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE DRAWINGS MUST BEATTACHED. NOTE Applicants are encouraged to submit pholographs or dw project site,but these DO NOT substitute for drawings. THE CORPS OF ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON 8.12 X 11 INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES. 7b. Describe the purpose of the proposed work and why you want or need to perform it at the site. Please explain any specific needs that have influenced the design. lite Qgp4t_ WAS MoL*— '`o tketdK. pa 4&2M!6- Ax"UQ16 FJX9 W. TLY. g � WpS Ntst ts.6�6h16�Ea� h �► 9, 7c. Describe the potential Impacts to characteristic uses of the water .. These uses may include fish and aquatic life,water quality, P aq �Y�Y Y q water supply,recreation and aesthetics. Identify proposed actions to avoid,minimize,and mitigate.detrimental impacts and provide proper protection of fish and aquatic life. Identify which guidance documents you have used. Attach a separate sheet If additional space is needed. Ma,.* m6 J No INCO.60366 10 't146 &XKUft 1Wr WMA.3 tiltl L*6 t�V1GQTc;V afs- R6c. ar%wwl ' 7d. For in water oonstru work,will your project be in compliance th the State of Washington water quality standards for turbidity WAC 173.201A-110? YES NO See USEFUL D NITIONS AND INSTRUCTIONS 8. Will the project be constructed in stages? YES ❑ NO Proposed starting date: Estimated duration of activity: 9. Check if any temporary or permanent structures will be placed: ❑ Waterward of the ordinary high water mark or line for fresh or tidal waters AND/OR ❑ Waterward of the mean higher high water for tidal waters? 10.Will fill material(rock,fill,bulkhead,or other material)be placed: ❑ Waterward of the ordinary high water mark or line for fresh waters? If YES,VOLUME(cubic yards) /AREA (acres) ❑ Waterward of the mean higher high water for tidal waters? If YES,VOLUME(cubic yards) /AREA (acres) ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 2 11; Will material be placed in wetlands? ❑ YES NO If YES: A. Impacted area in acres: B. Has a delineation been completed? If YES,please submit with application. ❑ YES \ NO C. Has a wetland report been prepared? If YES,please submit with application ❑ YES NO D. Type and composition of fill material(e.g.,sand,etc.) E. Material source: F. List all soil series(type of soil)located at the project site,and indicate if they are on the county's list of hydric soils. Soils information can be obtained from the natural Resources Conservation Service(NRCS). G. WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑ YES NO If YES,IMPACTED AREA IS ACRES OF DRAINED WETLANDS. NOTE:N your project will impact greater titan%of an acre of webW,submit a mitigation plan to the Corps and Ecology for approval along with the JAWA to. NOTE:A 401 water quality certification will be required from Ecology in addition ban approved mitigation plan 9 your project i npacfs wetlands Mare. a)greater lhan%acre in size, or b)tidal wetlands or wetlands adjacent to tidal water Please submit the JARPA form and mitigation plan b Ecology for an individual 401 certification Y a)or b)applies. 12. Stormwater Compliance for Nationwide Permits Only: This project is(or will be)designed to meet ecology's most current stormwater manual,or an Ecology approved local stormwater manual. ❑ YES ❑ NO If YES—Which manual will your project be designed to meet? If NO—For clean water act Section 401 and 404 permits only—Please submit to Ecology for approval, along with this JARPA application,documentation that demonstrates the stormwater runoff from your project or activity will comply with the water quality standards,WAC 173.201(A) 13.Will excavation or dredging be required in water or wetlands? ❑, YES NO If YES: A. Volume: (cubic yards)/area (acre) B. Composition of material to be removed: C. Disposal site for excavated material: D. Method of dredging: 14. Has the State Environmental Policy Act(SEPA)been completed ❑ YES ❑ NO SEPA Lead Agency:i��) CkXX*Xy/ SEPA Decision: DNS,MDNS,EIS,Adoption,Exemption Decision Date(end of comment period)* SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION 15. List other Applications,approvals or certifications from other federal,state or local agencies for any structures,construction discharges or other activities described in the application(i.e.preliminary plat approval,health district approval,building permit,SEPA review, federal energy regulatory commission license(FERC),Forest practices application,etc.). Also,indicate'whether work has been completed and indicate all existing work on drawings. NOTE:For use with Corps Nationwide Permits,identify whether your project has or will need an NPDES permit for discharging wastewater and/or stormwater. TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION DATE APPROVED COMPLETED? 5baifn FL Sly 1 coven► k NO. M, �?1Q'S1UG►yl'1AV&"1146 MA?AL 04 M113tIdlo 2OW 0 r 16. Has any agencpvtenied approval for the activity you're applying for or for any activity directly related to the activity described herein? ❑ YES ] NO If YES,explain: I ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 8W/917-0043 3 SECTION B - Use for Shoreline and Corps of Engineers permits only: 17a.Total cost of project. This means the fair market value of the project,including materials,labor,machine rentals,etc. 4 %Aar 17b. If a project or any portion of a project receives funding from a federal agency,that agency is responsible for ESA consultation. Please ndicate if you will receive federal funds and what federal agency is providing those funds. See instructions for information on ESA.* EDERAL FUNDING ❑ YES ❑ NO If YES,please list the federal agency. 18.Local government with jurisdiction: 19.For Corps,Coast Guard and DNR permits,provide names,addresses and telephone numbers of adjoining property owners,lessees, etc. - please note: Shoreline Management Compliance may require additional notice—consult your local government. NAME ADDRESS PHONE NUMBER SECTION C-This section MUST be completed for any permit covered by this application 0. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am familiar with the information contained in this application,and that to the best of my knowledge and belief,such information is true,complete,and accurate. 1 further certify that I possess the authority to undertake the proposed activities. I hereby grant to the agencies to which this applicabon.is made,the right to enter the above-described location to inspect the proposed,In-progress or completed work. I agree to start work_QY4.Y after all necessary permits have been received. DATE SIG LICAAT DATE ORIZED AGENT �� T 1 H RE B DESIGNATE-]GE s�: TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR PER S). UNDERST ND THAT IF A FEDERAL PERMIT IS ISSUED,I MUST SIGN THE PERMIT. UA SI RE OF APPLICAN DATE SIGNATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS, E.G.DNR) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS.DESIGNATED. 18 U.S.0§1001 provides that: Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing.same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. Pti tWrIR ill tree #t T tttii y dive fddt b i r gb V l; j affo ,i5 fj ttllYt;Sflfl to �5 ar of i iz fitr l 9t5�t ;h% � tlal, tiat will ti 3 ' ff19 i+Ca 7nvIves a af �ie or i/ararfr�e,set fi alti llf tbrt3t#:the # l , tm !� rlltt�e cased vitl ► y Iai These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs,please contact the appropriate agency in the instructions ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 8001917-0043 4 (8/29/2007)Charles McCoy III - Fwd: Murra Geotechnical Re ort Review Page 1 From: Brenda Drake To: McCoy III, Charles Date: 8/29/2007 8:19 AM Subject: Fwd: Murray Geotechnical Report Review >>> "Dan Burwell' <dburwell0RH2.com> 8/29/2007 8:11 AM >>> Robert and Brenda, The Murray Geotechnical Response from Landau that we received did NOT have 3 figures that were listed as attachments to the updated report. They are: Figure 3B-Section Drawing Figure 4-slope stability evaluation Figure 5-slope stability evaluation Figure 6-slope stability evaluation Can you request copies of these be sent to us? Chuck McKoy was the planner assigned to this report review. To save time,if these items could be scanned and emailed directly to me,that would be ideal. Otherwise please mail and let me know when they were sent. Let me know if you have any questions. Dan Burwell This message contains confidential information and is intended only for the addressed recipients.If you are not the addressed recipient you should not disseminate,distribute or copy this e-mail.Any views or opinions presented in this email are those of the author and may not represent those of the company. RH2 Engineering,Inc,www.rh2.com W� � N 6 I A y I \a- N N I ti F I � VI L� � W r O � MURMYI 6-26—•• 15:57 Murray Residence Static Cond. 160 10 most critical surfaces, MINIMUM BISHOP FOS = 1 .550 140 a 120 X Q 100 80 60 0 20 40 60 80 100 120 140 16 X—AXIS (feet) pU 9 e LLQQ O F U w a E �I Murray Residence Figure 14 LANDAU 1910 Tahuyu Blacksmith Road Results of Slope Stability 4 ASSOCIATES Mason Countv.Washington Evaluation -�- WASHINGTON JOINT AQUATIC RESOURCE PERMITS APPLICATION (JARPA) INSTRUCTIONS, SAMPLE DRAWINGS & AGENCY CONTACTS NOTE.• DO NOT SUBMIT this section with your application. This JointApplication may be used to apply for Hydraulic Project Approvals,Shoreline Management Permits,Approvals for Exceedance of Water Quality Standards,Water Quality Certifications,Coast Guard Bridge Permits,Department of Natural Resources Use Authorization, and Army Corps of Engineers Permits. You must submit readable copies of the completed application form together with detailed drawings,prepared in accordance with the drawing guidance to the appropriate agencies. When anyivin_g, you do NOT need to send copies of the instructions. Remember,depending on the type of project-you are proposing,other permits may be required that are not covered by this application. 13'* the following list to determine_which permits to apply for. Your project may require some or all of these permits. If you have trouble deciding which permits you need,please contact the appropriate agency for questions. Agency telephone numbers are attached. IF ANY OF THE BOXED ITEMS LISTED UNDER A PERMIT TITLE BELOW APPLY TO YOUR PROJECT,THEN YOU MUST CHECK THE BOX FOR THAT PERMIT ON THE TOP OF PAGE ONE OF THE JARPA FORM AND SEND A COMPLETED COPY OF THE APPLICATION FORM TO THE AGENCY RESPONSIBLE FOR ISSUING THAT PERMIT. Complete Sections A &C for any of the permits listed below. Also complete Section B for Shoreline and Army Corps of Engineers permits. Detailed drawings are required for any of these permits(see attached drawing guidelines for drawing requirements). ❑ Hydraulic Protect Approval from the Department of Fish and Wildlife under 77.55 RCW is required if your project Includes construction or other work,that: • will use,divert,obstruct,or change the natural flow or bed of any fresh or salt water of the state. This includes bed reconfiguration, all construction or other work waterward under and over the ordinary high water line,including dry channels,and may include projects landward of the ordinary high water line(e.g.,activities outside the ordinary high water line that will directly impact fish life and habitat,falling trees into streams or lakes,dike construction etc.). ❑ Shoreline Substantial Development,Conditional Use,Variance Permit.or Exemption from Local Government(under the Shoreline Management Act,90.58 RCW;)required for work or activity in the 100-year f oodplain,or within 200 feet of the ordinary high water mark of Shorelines of the State(check with your local government);and which includes any one of the following: • dumping; • drilling; • dredging; • filling; • placement or alteration of structures(whether temporary or permanent);or • any activity which substantially interferes with normal public use of the waters regardless of cost. I r ❑ Floodplain Management Permits and/or Critical Areas Ordinances review by Local Government for. • work in frequently flooded areas,geologically unstable areas,wildlife habitats,aquifer recharge areas,and wetlands. ❑ Section 401 Water Quality Certification from the Department of Ecology Regional office under 33 USC§1341 of the Clean Water Act is needed when a federal approval is required for a project,including the following: • Corps of Engineers 404 Permit—Send to Ecology's Federal Permits Unit in the Regional Office; • FERC hydropower license—Attach FERC exhibit E or an Applicant Prepared Environmental Assessment and send to the State of Washington's Office of Permit Assistance ❑ Aquatic Resources Use Authorization Notification from the Department of Natural Resources is required I your project: • is on,crosses,or impacts the bedlands,tidelands or shorelands of a navigable water. ❑ Section 404 Permit from the Corps of Engineer under 33 USC§1344 of the Clean Water Act is required if your project includes: • placement of dredged or fill material waterward of the ordinary high water mark,or the mean higher high fide line in tidal areas,in waters of the United States,including wetlands*; • mechanized land clearing and sidecasting in waters of the United States,including wetlands*. • Endangered Species Act(ESA)Consultation" ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 1 O Section 10 Permit from the Corps of Engineer is required for: • any work in or affecting navigable waters of the United States(e.g.,floats,piers,docks,dredging,excavation,piling,buoys, overhead power lines,etc.). ❑ General Bridge Act Permit from the Coast Guard is required for: • construction of a new bridge or modification to an existing bridge over a navigable waterway. ❑ Private Aids to Navigation from the Coast Guard is required for: • installing a fixed structure or floating object within the waters of the United States. 'Wetlands that are determined to be isolated by the Army Corp of Engineers are no longer regulated under Section 404 of the Clean Water Act. These wetlands are regulated by the Department of Ecology under the state Clean Water Act RCW 90.48. For further information please contact the Office of Regulatory Assistance at 1-800-917-0043 or at assistano@ora.wa.gov. **Endangered Species Act(ESA)Consultation with the National Marine Fisheries Service and/or U.S.Fish and Wildlife Service: If your project is authorized,funded or carried out by a Federal agency and the Federal agency determines that the proposed project may affect ESA listed species or critical habitat,consultation under Section 7 of the ESA is required. ESA Consultation is the responsibility of the Federal agency,not the applicant. JARPA forms should be submitted directly to the responsible Federal agency,not to the National Marine Fisheries Service or the U.S.Fish and Wildlife Service. The responsible Federal agency may require additional information from the applicant to assess potential project impacts to listed species and their habitat. Information on ESA - http://endangered.fws.gOV/hcDrindex.html or httpJ/endangered fws govlwhatwedo html or hftp://offices.fws.ciov/directoUlistOffices.cfm USEFUL DEFINITIONS &INSTRUCTIONS The following definitions are presented to help applicants in completing the DARPA. They may not necessarily represent specific . language from the laws implemented through JARPA. Ordinary High Water Mark or Line means the visible line on the banks where the presence and action of waters are so common as to leave a mark upon the soil or vegetation. In any area where the ordinary high water line cannot be found,the ordinary high water line adjoining saltwater shall be the line of mean higher high water,and the ordinary high water line adjoining freshwater shall be the elevation of the mean annual flood. t tide at a pa rticular location over a period of 19 Mean Lower Low Water a the 0.0 tidal elevation determined b averaging each days owes P Pe Y reg n9 Y years.It is the tidal datum for vertical tidal references in the salt water area. Mean High Water and Mean Higher High Water Tidal Elevations at any specific location can be found in tidal benchmark data compiled by the United States Department of Commerce,Environmental Science Services Administration,Coast and Geodetic Survey,dated January 24,1979. This information can be obtained from the Corps of Engineers at(206)MA-3495. The determination of tidal elevation Is obtained by averaging each day's highest tide at a particular location over a period of 19 years,measured from mean lower low water, which equals 0.0 tidal elevation. Shorelands or shoreland areas means those lands extending landward for 200 feet in all directions as measured on a horizontal plane from the ordinary high water mark;toodways and contiguous floodplain areas landward 200 feet from such floodways;and all wetlands and river deltas associated with the streams,lakes,and tidal waters which are subject to the provisions of 90.68 RCW. Shorelines means all water areas of the state,including reservoirs,and their associated wetlands,together with the lands underlying them, except stream segments upstream of the point where mean annual flow is less than 20 cubic feet per second,and lakes less than 20 acres In size. Wetlands mean areas that are inundated or saturated by surface water or ground water at a frequency and duration sufficient to support. and that under normal circumstances do support,a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps,marshes,bogs,and similar areas. Bridge means any structure including pipelines and conveyor belts,which transports traffic or materials across a navigable water. Aquatic Tidelands means the area between the ordinary high tide line and extreme low tide line,unless otherwise established. Aquatic Shorelands means the shore areas of non-tidal navigable lakes or rivers between the ordinary high water line and the line of navigability unless otherwise established. Aquatic Bedlands means the area waterward of and below the line of navigability on non-tidal rivers and lakes,or below the extreme low tide mark in navigable tidal waters,or below the outer harbor line where a harbor has been created. ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 2 Nationwide Permit issued by the Corps of Engineers for projects with minimal impacts. For a complete packet of nationwide permits and application information,contact the Corps Regulatory branch at(206)764-3495 or visit their website hftp://ww"i.nws.usace.army.mil. Section 303(d)listed waters These are water quality limited estuaries,lakes,and streams that fall short of state surface water quality standards,and are not expected to improve within the next two years. Mixing zone means that portion of.a water body adjacent to an effluent outfall where mixing results in the dilution of the effluent with the receiving water.Water quality criteria may be exceeded in a mixing zone as conditioned and provided for in WAC 173-201A-400. Turbidity means the clarity of water expressed as nephelomefic turbidity units(NTU)and measured with a calibrated turbidimeter. Background conditions means the biological,chemical,and physical condidons.of a.water body.outside the area of influence of the discharge under consideration. Instructions for question 7d. Water Quality Standards—Compliance for turbidity mixing zone requirements. The water downstream of the allotted mixing zone(100 ft,200 ft,300 ft,dependent on how fast the water is flowing and measured in cubic feet per second)must have the same visual clarity as the water upstream of the project impact site(the water cannot be greater than 5 NTUs above the background water). The following section from WAC 173-201 A 110 authorizes the turbidity mixing zone. All work in or near the water,and water discharged from the site shall meet the State's Water Quality Standards,WAC 173-201A. A mixing zone for turbidity is authorized within WAC 173.201A-030 during and immediately after necessary in-water or shoreline construction activities that result in the disturbance of in-place sediments. Use of a turbidity mixing zone is intended'for brief periods of time(such as a few hours or days)and is not an authorization to exceed the turbidity standard for the entire duration of the construction. Use of the mixing zone is subject to the constraints of WAC 173-201A-100(4)and(6),requiring an applicant have supporting Womnation that indicates the use of the mixing zone shall not result in the loss of sensitive or important habitat, substantially Interfere with the existing or characteristic uses of the water body,result in damage to the ecosystem,or adversely affect public health.The mixing zone is authorized only after the activity has received all other necessary local and state permits and approvals,and after the implementation of appropriate best management practices to avoid or minimize disturbance of in-place sediments and exceedances of the turbidity criteria. Within the mixing zone,the turbidity standard is waived,and all other applicable water quality standards shall remain in effect. The mixing zone is defined as follows: 1) For waters up to 10 cfs flow at time of construction,the point of compliance shall be 100-feet downstream of project activities. 2) For waters above 10 cis up to 100 ofs flow at time of construction,the point of compliance shall be 200-feet downstream of project activities. 3) For waters above 100 ofs flow at the time of construction, the point of compliance shall be 300 feet downstream of project activities. 4) For projects working within or along lakes, ponds,wetlands, estuaries, marine waters or other non-flowing waters, the point of compliance shall be at a radius of 150-feet from the activity causing the turbidity exceedance. I ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 3 GUIDANCE FOR COMPLETION OF DRAWINGS General Information. Three types of illustrations are needed to properly depict the proposed activity: Vicinity Map,Plan View,and Cross-Sectional View. Drawings to scale should be prepared using clear printing,black ink,and the fewest number of sheets possible. Include the scale. The importance of clear accurate drawings cannot be overstated. At a minimum,drawings must contain the following Information;other information may be required depending on project type. If you have questions regarding completing the drawings,call the appropriate agency. *NOTE: Army Corps of Engineers drawing requirements are found at: httD://www.nws.usace.army.miVPublicMenu/Menu.cfm?sitename=REG&Pagename=maini)age Permit Applicant Info. 1.Vicinity Map. A copy of a county or city road map,or a U.S.Geological Survey topographic map maybe used. Include: a. North arrow. b. Name of waterbody(and river mile if appropriate). C. Location of the proposed activity(indicate with a circle,arrow,X,or similar symbol). d. Provide latitude and longitude of the site to the nearest second. e. Provide directions to the site. 2. Plan View. This drawing illustrates the proposed project area as if you were looking down at the site from overhead. a. North arrow. b. Name of waterbody and direction of water flow. C. Location of existing shoreline. Tidal Waters: Show the Ordinary High,Mean High,Mean Low,Mean Higher High,and Mean Lower Low Water Marks or Lines, and/or wetland boundaries. Indicate elevation above datum. Non-tidal waters: Show the Ordinary High Water Mark or Line,Meander Line,and/or wetland boundary. d. Dimensions of the activity or structure and impervious surfaces,distance from property lines,and the distance it extends into the waterbody beyond the Ordinary High,Mean High,Mean Higher High,and Mean Low Water Mark or Line,and/or wetland boundaries,as appropriate. e. For Corps permits,indicate the distance to Federal projects and/or navigation channels(if applicable). To ascertain,call the Corps'Regulatory Branch Office at(206)764-3495. f. Show existing structures on subject and adjoining properties. g. Indicate adjoining property ownership. h. If fill material is to be placed,identify the type of material,amount of material(cubic yards),and area to be filled(acres). I. If project involves dredging,identify the type of material,amount of material(cubic yards),area lo be dredged,method of dredging,and location of disposal site. Dredging in areas shallower than-10 feet needs to be clearly identified on drawings. J. Identify any part of the activity that has been completed. k. Indicate types and location of aquatic,wetland,riparian and upland vegetation. 1. Erosion control measures,stabilization of disturbed areas,etc. m. Utilities,including water,sanitary sewer,power and stormwater conveyance systems(e.g.,bloswales). n. Indicate stomiwater discharge points. o. Proposed landscaping where applicable(for complex landscape plans,please attach a separate drawing). p. Where applicable,plans for development of areas on or off site as mitigation for impacts associated with the proposal. q. On all variance applications the plans shall clearly indicate where development could occur without approval of a variance,the physical features and circumstances on the property that provide a basis for the request,and the location of adjacent structures and uses. 3.Cross-Sectional View. This drawing illustrates the proposed activity as if it were cut from the side and/or front. Include: a. Location of water lines. Tidal Waters: Show the Ordinary High,Mean High,Mean Higher High,and Mean Lower Low Water Marks or Lines,and/or wetland boundary. Non-tidal waters: Show the Ordinary High Water Mark or Line,and/or wetland boundary. b. Water depth or tidal elevation at waterward face of project. C. Dimensions of the activity or structure,and the distance it extends into the waterbody beyond the Ordinary High,the Mean High, the Mean Higher High and Mean Low Water Mark or Line,and/or wetland boundaries. d. Indicate dredge and/or fill grades as appropriate. e. Indicate existing and proposed contours and elevations. f. Indicate types and location of aquatic,wetland,and riparian vegetation present on site. g. Indicate type and location of material used in construction and method of construction. h. Indicate height of structure. 4.Clearance and Elevations. Applies to Coast Guard Bridge Permits only. a. Vertical clearance measured from Mean Higher(tidal waters)or Ordinary High(non-tidal water). b. Horizontal clearance between piers or pilings. C. Bottom elevation of the waterway at the bridge. ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 3601407-7037 or 800/917-0043 5 AGENCY CONTACTS Below is a list of agencies to which a copy of the Joint Application may be sent,and which permit each agency issues. Technical assistance and information is also available from these offices. State of Washington Office of Regulatory Assistance State of Washington Office of Regulatory Assistance Telephone 1-800-917-0043 or(360)407-7037 Mailing Address Fax(360)407-6904 PO Box.47600 Olympia,WA 98504-7600 Physical Address 300.Desmond Drive Lacey,WA 98504 Department of the Army Permit(s)(Section 404 or Section 10) U.S.Army Corps of Engineers, Telephone(206)764-3495 Seattle District FAX(206)764-6602 Regulatory Branch Post Office Box 3755 Seattle,WA 98124-2255 U.S.Army Corps of Engineers Telephone(509)238-4570 Eastern Washington Information FAX(509)238-4570 P.O.Box 273 Chattaroy,WA 99003-0273 U.S.Army Corps of Engineers Telephone(509)682-7010 Central Washington Information FAX(509)682-7710 P.O.Box 2829 Chelan,WA 98816-2829 ,,Department of Ecoloov Permits—401 Water Quality Certification Washington State Department of Ecology—Headquarters Mailing Address Post Office Box 47600 Telephone(360)407-6000 Olympia,WA 98504-7600 Physical Address 300 Desmond Drive Lacey,WA 98504 Central Region Telephone(509)575-2490 15 West Yakima Avenue,Ste 200 FAX(509)575-2809 Yakima,WA 98902-3401 Eastern Region Telephone(509)329-3400 4601 North Monroe,Suite 202 FAX(509)329-3529 Spokane,WA 99205-1295 Northwest Region Telephone(425)649-7000 3190-160th Avenue S.E. FAX(425)649-7098 Bellevue,WA 98008-5452 Southwest Region Telephone(360)407-6300 Mailing Address: FAX(360)407-6305 P.O.Box 47775 Olympia,WA 98504-7775 Physical Address: 300 Desmond Drive Lacey,WA 98504 ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 8=917-0043 6 Department of Fish.and Wildlife(Hydraulic Project Approval)-Submit 3 copies of the JARPA application to Regional offices. Contact regional offices for questions or assistance. Headquarters Washington State Department of Fish and Wildlife Telephone(360)902-2534 600 Capitol Way North TDD(360)902-2207 Olympia,Washington 98501-1091 FAX(360)902-2946 Region 1 (Pend Oreille,Ferry,Stevens,Spokane,Irncoln,Whitman,Columbia,Garfield,Asotin,and Walla Walla Counties) Washington State Department of Fish and Wildlife Telephone(509)456-4082 8702 North Division Street FAX(509)456-4071 Spokane,WA 99218-1199 Region 2(Okanogan,Douglas,Grant,Adams,and Chelan Counties) Washington State Department of Fish and Wildlife Telephone(509)754-4624 1550 Alder Street NW FAX(509)754-5257 Ephrata,WA 98823-9699 Region 3(Franklin,Kittitas,Yakima,and Benton Counties) Washington State Department of Fish and Wildlife Telephone(509)575-2740 1701 South 24th Avenue FAX(509)575-2474 Yakima,WA 98902-5720 Region 4(Whatcom,Skagit,Snohomish,King,Island,and San Juan Counties) Washington State Department of Fish and Wildlife Telephone(425)775-1311 16018 Mill Creek Boulevard FAX(425)338-1066 Mill Creek,WA 98012-1296 Region 5(Lewis,Wahkiakum,Cowlitz,Skamania,Clark;and Klickitat Counties) Washington State Department of Fish and Wildlife Telephone(360)696-6211 2108 Grand Blvd. FAX(360)906-6776 Vancouver,WA 98661-4624 Region 6(Pacific,Pierce,Thurston,Grays Harbor,Mason,Jefferson,Clallam,and Kitsap Counties) Washington State Department of Fish and Wildlife Telephone(360)249-4628 48 Devonshire Road FAX(360)664-0689 Montesano,WA 98563-9618 Local Government(Shoreline Management Act Approval) Appropriate City or County Planning,Building,or Community Development Department Refer to: htto://www.ora.wa.gov/countiesfindex.htm for city and county contact information. Natural Resources Conservation Service(NRCS),formerly Soil Conservation Service(SCS)for information regarding activities on agricultural land NRCS Telephone(509)323-2900 West 316 Boone Avenue,Suite 450 FAX(509)323-2909 Spokane,WA 99201-2348 Coast Guard Section 9 Bridge Permit Commander 13'h Coast Guard District(OAN)Telephone(206)220-7282 915 Second Avenue.Room 3510 FAX(206)220-7265 Seattle,WA 98174-1067 Attn: Bridge Administrator Private Aids to Navigation Commander 13t'Coast Guard District(OAN) Telephone(206)220-7285 915 Second Avenue,Room 3510 FAX(206)220-7265 Seattle,WA 98174-1067 Attn: PATON Manager Department of Natural Resources,Aquatic Resources Authorization to use bedlands,tidelands,or shorelands of navigable waters. Headquarters Telephone(360)902-1000 Northwest Region Telephone(360)856-3500 Pacific Cascade Region Telephone(360)577-2025 South Puget Sound Region Telephone(360)825-1631 Northeast Region Telephone(509)684-7474 Southeast Region Telephone(509)925-8510 Olympic Region Telephone(360)374-6131 ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 7 v� 1 H 4 a '-� a L 4c OV 46 ' \tp o' IR AO kcp � • moo. ���� / y�_s.�_1ri. M / ` O V y oho MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Courthouse Annex P.O.Box 279,Shelton,WA 98584 (360)427-9670 SHORELINE PERMIT APPLICATION PERMIT NO. SHORELINE SUBSTANTIAL DEVELOPMENT SHORELINE VARIANCE DATE RECEIVED SHORELINE CONDITIONAL USE SHORELINE EXEMPTION The Washington State Shoreline Management Act (RCW 90.58) requires that substantial developments within designated shorelines of the state comply with its administrative procedures(WAC 173-14)and the provisions of the Mason County Shoreline Management Master Program. The purpose of this Act and local program is to protect the state's shoreline resources. The program requires that substantial development(any development of which the total cost or fair market value exceeds $5,000.00 or materially interferes with the normal public use of the water or shorelines of the State be reviewed with the goals, polices, and performance standards established in the Master Program Answer all questions completely. Attach any additional information that my finther describe the proposed development. Incomplete applications will be returned. APPLICANT: MKd.r4�L V1'tlkL{�,y ADDRESS: 1910 NE �QQYA BlDWMrrj4 14VANA (street) 1►3A �$9 (city) (state) (Zip) TELEPHONE: 360-3 3- 9g99 (home) (business) AUTHORIZED REPRESENTATIVE: Gam' EEZ- ADDRESS: I URI�r� uJ (street) 983(a ( TELEPHONE: (city) (state) (Zip) PROPERTY DESCRIPTION: General location(include property address,water body and associated wetlands—identify the name of the shoreline): r Legal description (include section, township, and range to the nearest quarter, quarter section or latitude and longitude to the nearest minute. Projects located in open water areas away from land shall provide a longitude location)-include all parcel numbers: LV T..20 O ERSHIP: Contract Applican Owner Lessee Purchaser (Identify) Other Owner: MtcuASL N►U y -,-q(Dl (street) (city) WW (state) (Zip) I:\PLANNINGICHARELL&RENEEISHORELINEPERMIT.APP REVISED: 06-25-03 DEVELOPMENT DESCRIPTON Development(identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions,and other pertinent information): QE-C UCT 2� I CA) I u sti.�o,�u►,�6 tMJ. Use(identify current use of property with exist improvements: Reason for requesting development: `To FAQ- C�mpUN(r 1 1 , ACKOWLEDGEMENT I hereby declar ,to the best of my knowledge and belief,the forgoing information and all attached information is true and corre 7 qQ pli prized-risen ) (date) TO BE COMPLETED BY LOCAL OFFICIAL Identify and describe existing features of the site and surrounding area: If proposed structures will exceed a height of 35 feet above the existing grade level,indicate the location of any residential units that will have an obstructive view: If a Conditional Use or Variance is requested,make reference to the appropriate section in the Master Program: I:\PLANNINGICHARELL&RENEE/SHORELINEPERMIT.APP REVISED: 06-25-03 THE SHORELINE PERMIT PROCESS--Page 4 Publication cost is the responsibility of the applicant. Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant. The Shelton-Mason County Journal will bill the applicant directly. WE understand that UWE must sign and date the attached acknowledgement indicating that UWE understand that is MY/OUR responsibility. UWE must submit the signed page as part of this application in order for it to be considered as complete. uC�-e DAT �16L O APP THE SHORELINE PERMIT PROCESS—Page 5 LIST OF ADJACENT PROPERTY OWNERS WITHIN 300 FEET OF YOUR PROPERTY BOUNDARIES FOR CONDITIONAL USE AND VARIANCE Addresses may be obtained from the Mason County Assessor's Office,Building I, Second Floor. I� 4 ( =c, S 4- Rzt�.(-- �) Pp-aF c 7 10 SavbG<- Kpsnao 193(t) WE -Mm-t3l,SM aj ttw po 13� 2450 `0 BD( 3biq �"11Ly4 985� l�E 'n ,L,u� 9` 52`� KIWG.9N9� 1f.�1 9��83 L. D "tits Bum 1950 f< -U_W, ad t**0 2�20 3i"-' ST N\a ' TAMNA C)d58�3 G 1 G Oa w-,WJ 9`a33S UV) MLNCjuu 3m��� 3Acogse� 313 5. 2,Q)N 5'r 5F 1561-0 S7 IDS rraWC-S 6 A 9,319,3 ?GN117Ni. 01h 9%rg -W- Z.i31 TOW 12.$2.1 5'ory £ 8515 '4i5-r WO `rAcrWw)W 99yqb G I UWJ3%7-�i44 9 33 Nbe^o N rOtJ PA►iu P Ll�,acf) &LZta.Lx)A �5 TAc�.•�•,� wa 984m6 Ta2i5 � Trz7-c(4 LAY ZA�s P� Aer lot siL,u4zrys1j,UA`03s 3 u22J DNv io NO2- %:SN to25 fk'T% LOU UVWT PAaacgT Sim, t�l1 9dMo VIM� Sc t'NTliT9 RM2 ENGINEER K W August 9,2007 FRlpaiirwrrdi2.can ''' Mr.Chuck McCoy,County Planner m �nt2oom Mason County Department of Community Development Mason County Building 1 t°�° 411 N 51'Street PO Box 279 Shelton,WA 98584 WESTERN WASHWT0N Sent Via: E-mail to Robert t-'ixk and Brenda Drake 12100 NE tW St SM 100 Subject: Murray Geotechnical Report Review 00W,WAW11 Dear Mr,McCoy: We have reviewed the following document under our existing contract to provide fiery must 54W Geotechnical leering review services to Mason County. #a)4aMM4 • Geotechnical Report—Murray Residence, 1910 Tahuyu Blacksmith Road,Tax Parcel No_ 22330-50-00902 and 22330-50-00209, by Landau Associates, dated June 29, 2007. The review was performed to ensure that the improvements are in concurrence with Mason EASTERNYYASNINGTOt9 County ordinances for geologic hazard areas. The engineer and/or engineering geologist and preparer of the documents remain responsible for all report and design issues. Smw suet SE,Suite 5 In general we appreciate the level of detail provided in the report. However, there are some items that were not mentioned in the report that are required by Mason County Code. Eastitee,wa9B802 Therefore, we recommend the County request the submittal of a revised Geotechnical Report to describe all necessary items as required by the Mason County Resource "509.88cm Ordinances — Iandslide Hazard Areas 17.01.100 and Seismic Hazard Areas 17.01.102. Specific comments listed below are directed to the Geotechnical Testing Laboratory and are rm)509W2313 in the order they appear in the Geotechnical Report_ I. Page 2 — Site Reconnaissance: Mason County Ordinance requires discussion of upland waterbodies and wetlands. If any, provide all details that may affect the site. If none,state as such. KITSAP PENINSULA 2. Page 2—Subsurface Conditions: No soil logs were described on the site. Were test w0K4W see101 pits or borings completed? If no soil logs were completed,state as such and reasons why none were completed. At which locations on-site were soils observed? The locations of these observations shall be noted on the site plan. It is also noted that PatOrddwAsa3as there is a well on the property. Was the well log reviewed to determine or verify soil MMMM conditions and confirm the depth to groundwater? 3. Pales 3 and 4 — Geotechnical Conclusions and Recommendations, :dope Stability: (lagM rs>see Existing predeveloped conditions as described include slopes of 50 percent at heights of 10 feet or more. This requires a slope stability analysis that:was performed t ►360:877961 for static conditions to address construction conditions and final conditions for the i 09/09/07 4 35 VNI J;\i)ata��tC13C17 Ei73\t i3 �Eumy a2T_il -it'�3 tr�o immix*Ald;.�y m\1�may E:c=�cdmw-il 7E�.x�R�wx c I IY7_Itt-30 ikx 1 ti Mr.Chuck McCoy August 9,2007 Page 2 existing ecology block walls but was not completed for the finished construction. Describe inputs and outputs in the report for the finished construction. Provide both static and seismic slope stability analysis for the finished construction of the site. Note that Mason County requires static factors of safety of 1.5 and dynamic factors of safety of 1.1 using a 475-pear return period seismic event. Slope stability calculations should also be provided as an appendix to the report for construction conditions, block wall as-is conditions, block wall with recommendations and, as described above,finished site conditions. This concludes our review of the Geotechnical Report. If you have any questions or comments, please contact me at(360) 876-7960 ext. 5342. Sincerely, RH2 ENGINEERING,INC. D. T Dan Burwell,P.E. Project F?ngineer 3 58 C)Hlb�+/jw f '1s1V ,SIGNED: �h7lVALC EXt�IRE,�,' i i I I 06/09/07 915.1M 1ADat&vh1C:)Vr,07VO1.1 1tumey 07_07-17\1 v w Chuck 5fc.Cuy m RUmA t:n*hnuz)Rq..wt Rawt.':i 07.07 304x i i