HomeMy WebLinkAboutJARPA and HPA - SHX Application HYDRAULIC PROJECT APPROVAL state of Washington
4=4 RCW 75.20.100 or RCW 75.20.108 Dew Fi
sh and WUWe
ma Region 7 Office
600 Capkol Way North,Ms 3155
WHAN Olympia,Washington 9MI-1091
DATE OF ISSUE: April 14 1999 LOG NUMBER: 00-D5884-01
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
Keewon&Myong Lee GGLO, LLC
7201 NE 152"d Place 1191 Second Avenue, Suite 1650
Bothell,WA 98011 Seattle,WA 98101
(425)362-9413 (206)689-8980
Fax: 206 467-0627RECEIVED
� 61
PROJECT DESCRIPTION: Remove Fill and Reslope APR
MA,"CO.PLANN G DEIST.
PROJECT LOCATION: Allyn, next to Lennard K's Tavern, across from Fire Station, MP 21.
# WRIA WATER BODY TRIBUTARY TO 1/4 SEC. SEC. TOWNSIE[P RANGE COUNTY
1 14.MARI North Bay Case Inlet 20 22 North 01 West Mason
NOTE: This Hydraulic Project Approval is for the removal of fill placed illegally on the intertidal area of the property.
PROVISIONS
1. TIMING LIMITATIONS: The project may begin June 15, 1999 and shall be completed by March 14,2000,
provided:
a. Due to the lengthy spawning period of surf smelt in this portion of Puget Sound, work below the ordinary high water
line from July 1 through December 31 and January 1 through March 31 of any year may be acceptable if a
WDFW representative confirms a lack of spawn during a site inspection. Arrangements for a site inspection shall be
made with the Area Habitat Biologist listed below. Work shall commence within 48 hours of notification by WDFW
and shall be completed within seven days of project commencement.
2. NOTIFICATION REQUIREMENT: The permittee or contractor shall notify the Area Habitat Biologist(AHB)listed
below of the project start date. Notification shall be received by the AHB at least three working days prior to the start of
construction activities. The notification shall include the permittee's name,project location, starting date for work, and
the control number for this Hydraulic Project Approval.
3. Work shall be accomplished per application,dated March 15, 1999, and submitted to the Washington Department of
Fish and Wildlife, except as modified by this Hydraulic Project Approval. These plans reflect design criteria per
Chapter 220-110 WAC. These plans reflect mitigation procedures to significantly reduce or eliminate impacts to fish
resources. A copy of these plans shall be available on site during construction.
4. Gravel and manmade material shall be removed from the waterward side of ordinary high water line, staked by WDFW
representative.
5. All fill and manmade debris on the beach shall be removed and disposed of upland such that it does not enter waters of
the state.
Page 1 of 3
HYDRAULIC PROJECT APPROVAL state or Washington
d RCW 75.20.100 or RCW 75.20.108 �of Fuh and Wume
fice
Mew 600 Capitol Way North,M3 3155
WHAW Olympia,Washington 98501-1091
DATE OF ISSUE: April 14, 1999 LOG NUMBER: 00-D5884-01
6. Beach shall be resloped to natural grade.
7. Project activities shall be conducted to minimize siltation of the beach area and bed.
8. If a fish kill occurs or fish are observed in distress,the project activity shall immediately cease and WDFW Habitat
Program shall be notified immediately.
9. All debris or deleterious material resulting from construction shall be removed from the beach area and bed and
prevented from entering waters of the state.
i
10. Project activities shall not degrade water quality to the detriment of fish life.
I
11. Project activities shall not occur when the project area, including the work corridor, is inundated by tidal waters.
f 12. Use of equipment on the beach shall be held to a minimum,confined to a single access point, and limited to a 50-foot
work corridor waterward of the fill material. Construction materials shall not touch the beach outside this work
f
corridor.
13. Beach area depressions created during project activities shall be reshaped to preproject beach level upon project
completion.
SEPA: Exempt,no other non-exempt permits
APPLICATION ACCEPTED: March 14, 1999 ENFORCEMENT OFFICER: Ohlde 029 [P2]
Margaret Schirato (360)427-2179 � S� for Director
Area Habitat Biologist WDFW
cc: Alan Borden, Mason County DCD
t
g�
3 GENERAL PROVISIONS
This Hydraulic Project Approval(HPA)pertains only to the provisions of the Fisheries Code(RCW 75.20). Additional authorization
from other public agencies may be necessary for this project.
This HPA shall be available on the job site at all times and all its provisions followed by the permittee and operator(s)performing
the work.
3.
This HPA does not authorize trespass.
The person(s)to whom this HPA is issued may be held liable for any loss or damage to fish life or fish habitat which results from
failure to comply with the provisions of this HPA.
Page 2 of 3
_r
I s�
HYDRAULIC PROJECT APPROVAL state of Washington
RCW 75.20.100 or RCW 75.20.108 Department of Fish and Wildlife
Wool Region 7 Office
WHINX 600 Capitol Way North,MS 3155
Olympia,Washington 98501-1091
DATE OF ISSUE: April 14 1999 LOG NUMBER: 00-D5884-01
Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars
per day or a gross misdemeanor charge,possibly punishable by fine and/or imprisonment.
All HPAs issued pursuant to RCW 75.20.100 or 75.20.160 are subject to additional restrictions,conditions or revocation if the
Department of Fish and Wildlife determines that new biological or physical information indicates the need for such action. The
permittee has the right pursuant to Chapter 34.04 RCW to appeal such decisions. All HPAs issued pursuant to RCW 75.20.103 may
be modified by the Department of Fish and Wildlife due to changed conditions after consultation with the permittee: PROVIDED
HOWEVER,that such modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 75.20.130.
APPEALS--GENERAL INFORMATION
IF YOU WISH TO APPEAL A DENIAL OF OR CONDITIONS PROVIDED IN A HYDRAULIC PROJECT APPROVAL,THERE
ARE INFORMAL AND FORMAL APPEAL PROCESSES AVAILABLE.
A. INFORMAL APPEALS(WAC 220-110-340)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 75.20.100,
75.20.103, 75.20.106, AND 75.20.160:
A person who is aggrieved or adversely affected by the following Department actions may request an informal review of-
(A) The denial or issuance of a HPA,or the conditions or provisions made part of a HPA;or
(B) An order imposing civil penalties.
It is recommended that an aggrieved party contact the Area Habitat Biologist and discuss the concerns. Most problems are
resolved at this level,but if not,you may elevate your concerns to his/her supervisor. A request for an INFORMAL REVIEW
shall be in WRITING to the Department of Fish and Wildlife,600 Capitol Way North,Olympia,Washington 98501-1091 and
shall be RECEIVED by the Department within 30-days of the denial or issuance of a HPA or receipt of an order imposing civil
penalties. The 30-day time requirement may be stayed by the Department if negotiations are occurring between the aggrieved
party and the Area Habitat Biologist and/or his/her supervisor. The Habitat Protection Services Division Manager or his/her
designee shall conduct a review and recommend a decision to the Director or its designee. If you are not satisfied with the
results of this informal appeal,a formal appeal may be filed.
B. FORMAL APPEALS(WAC 220-110-350)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 75.20.100 OR
75.20.106:
A person who is aggrieved or adversely affected by the following Department actions may request an formal review of:
(A) The denial or issuance of a HPA,or the conditions or provisions made part of a HPA;
(B) An order imposing civil penalties;or
(C) Any other"agency action"for which an adjudicative proceeding is required under the Administrative Procedure Act,
Chapter 34.05 RCW.
A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife,600 Capitol Way North,
Olympia, Washington 98501-1091,shall be plainly labeled as"REQUEST FOR FORMAL APPEAL"and shall be RECEIVED
DURING OFFICE HOURS by the Department within 30-days of the Department action that is being challenged. The time
period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an
informal appeal, the deadline for requesting a formal appeal shall be within 30-days of the date of the Department's written
decision in response to the informal appeal.
C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 75.20.103 or 75.20.160:
A person who is aggrieved or adversely affected by the denial or issuance of a HPA,or the conditions or provisions made part of
a HPA may request a formal appeal. The request for FORMAL APPEAL shall be in WRITING to the Hydraulic Appeals Board
per WAC 259-04 at Environmental Hearings Office,4224 Sixth Avenue SE,Building Two-Rowe Six,Lacey, Washington
98504;telephone 360/459-6327.
D. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS RESULTS IN FORFEITURE OF ALL APPEAL RIGHTS.
IF THERE IS NO TIMELY REQUEST FOR AN APPEAL,THE DEPARTMENT ACTION SHALL BE FINAL AND
UNAPPEALABLE.
Page 3 of 3
GGLO, LLC
Architecture and Interior Design
1191 Second Avenue, Suite 1650
Seattle,Washington 98101 RECEIVED
j Telephone(206)467-5828
Facsimile (206)467-0627 MAR 2 6 1999
gglo@gglo.com
www.gglo.com MASON CO.PLANNING DEPT.
Transmittal
From: David Henig,AIA To: Mr. Allan Borden
Date: March 25, 1999 Mason County
Project: Lee Property Courthouse Bldg 1, 411 N 5th
Project No: 98135.00 PO Box 578
Shelton, WA 98584
Business[1] (360)427-9670 x365
Fax[1] (360)427-8425
VIA: ❑Fax ❑Courier ®Mail ❑Other.
❑Hard copy to follow
Description: JARPA Application
JARPA Application Submittal
Remarks: For your information.
Allan,
Here is a copy of the JARPA Application for the remedial action on the Lee Property.
If you have any questions, please call.
David Henig,AIA
206.689.8980
If enclosures are not as noted, please inform us immediately.
E:\Project\98135\8-transm\borden032599.doc
AQENCY USE ONLY
Agency Reference #: Date Received:
SEPA Lead Agency:
Other:
Mr
—JARPA APPLICATION FORM —
MA' 2 2' 11,99 - for use in Washington FEB 11 1999
htngton State - ..,.
PLEASE TYPE OR PRINT IN BLUE OR BLACK INK �. G 1. I')
Based on the preceding checklist, I am sending copies of this application to the following: (check all that apply)
,R Local Government: for shoreline ❑ Substantial Development ❑ Conditional Use ❑ Variance
❑ Exemption; or ❑ Floodplain Management ❑ Critical Areas Ordinance
Washington Department of Fish and Wildlife for HPA
❑ Washington Department of Ecology Approval to Allow Temporary Exceedance of Water Quality Standards
❑ 401 Water Quality Certification Nationwide Permits
[Q Corps Engineers for Section 404 or Section 10 permit(s)
SECTION A - Use for all permits covered by this application. Be sure to also complete Section C (Signature Block) for
all permit applications.
1. Applicant onN + nyoNt GEC
Mailing Address . 'ZZ01 A/E /5.:7Lc9 P A g (!
6,24
Work Phone: (OZ ) 36Z- 7f 3 Home Phone: (•�'LS') 36Z �lzf
Fax Number: ( )
If an agent is acting for the.applicant during the permit process, complete #2 &3.
2. Authorized Agent `7 C1 GOB LG
Mailing Address 5d,7-.r !65'•0 //7/
Work Phone: (Z&6) I V-77$0 Home Phone: ( )
i
Fax Number: (2o6) Y40- 06 2.7
4
3. Designation of Authorized Agent, if applicable:
I hereby designate iC1 G-O, L G to act as my agent in matters related to
%this application for permit(s). 1 understand that if a Federal permit is issued,I must sign the permit.
'-t--
•'hignature of plicant Date
• ' •4` kelationship of applicant to property: :9 Owner ❑ Purchaser ❑ Lessee ❑ Other (_
5. Name, address, and phone number of property owner(s), if other than applicant:
Application Page I of 5
4
6. Location where proposed activity exists or will occur: Waterbody IJoi-CH ,&y, LA56'/A/"I-
DNR Stream Type (if known)
Street Address Tributary of
AL.LYAj, MA5oj 6oyN124 WA,5,g/,J57-dd Legal Description: Seba ATTAC H6,b
City, County, State, Zip Code Tax Parcel No.:
'A 'A Section Township Range
7. Describe the current use of the property, and structures existing on the property. If any portion of the proposed activity
is already completed on this property, indicate month and year of completion.
'r'1'I� 5/T6t$ L,u�c,t,r�.r+�'I.y ua'Jm�e.ov�p� iQNd uS�d /rd2 PA4lGi.vl�� �NFe.tMAL,t..lf.
Tt P_iulg /S Ar.J &tk1Vr,,v j 1701.1.0{&Ad ON r/4e S/TE, z✓Mle. I lwV ti_ JZ �'►I�q�nJ•
/l.Id kJOAA HAIrREE7✓ ON 'sNa' 0046ACR-I.Y
Is the property agricultural land? ❑ YesNo Are you a USDA program participant? O Yes XNo
8. Describe the proposed activity, and the activity's purpose. Include expected water quality and fish impacts, and proposed
actions to reduce the duration and severity of those impacts and provide proper protection for fish life. Complete plans
and specifications should be provided for all work waterward of the Ordinary High Water Mark or Line, including types
of equipment to be used, and for all work if applying for a shoreline permit. If additional space is needed, please attach
a separate sheet. r/4r p20PD$EA /dcr��iT'j� /t ?"o �C�I+ao�d" !1'1ANMMOC a�-dT/C/S A✓� �jIe14!/iFL
�,QbM 7-141=5 !✓i1Tg�ewA24 .S/03 OF Th�E blZarNA1Gy I44N G✓A7-r2 /hi9,1:4k, /1Nd YO
.<6�To 2 E $�At.,►,f $Lam.
4
a
I
4
k
Preparation of drawings: See Appendix A - sample drawings and checklist for completing the drawings. One set of
original or good quality reproducible,drawings must be attached. NOTE: Applicants are encouraged to submit
photographs of the project site, but these do not substitute for drawings. THE CORPS OF ENGINEERS REQUIRES
DRAWINGS ON 8-1/2 X 11 INCH SHEETS. Larger drawings may be required by other agencies.
r
Application Page 2 of 5
9. Proposed Starting Date: T' A.&c,A L-1-a)
Estimated duration of activity: I-W& -Fov2 ram,�tKS
Will the project be constructed in stages? ❑ Yes No
10. Will any structures be placed:
a. waterward of the Ordinary High Water Mark or Line for fresh or tidal waters?
b. waterward of Mean High Water Line in tidal waters? ❑ Yes No
11. Will fill material (rock, fill, bulkhead, pilings or other material) be placed waterward ❑ Yes �No
of Ordinary High Water Mark or Line for fresh or tidal waters? '
a. If "yes," in fresh water indicate volume in cubic yards: ❑ Yes No
b. If "yes," in tidal waters; indicate volume in cubic yards water-ward of the line of mean higher high
water:
12. Will material be placed in wetlands?
If yes: ❑ Yes '1\Io fy�, impacted area: (acres)
a. Has a delineation been completed? ❑ Yes ❑ No (If yes, please submit with application..)
b. Type and composition of fill material (e.g., sand, etc.):
c. Material source:
d. List ail soil series.(type of soil) located at the project site, & indicate if they are on the county's list of hydric soils:
Soils information can be obtained from the Natural Resources Conservation Service
Conservation Service (SCS). (MRCS), formerly Soil
-------------------
13. Will proposed activity cause flooding or draining of
wetlands?
❑ Yes No If yes, impacted area:
14. WII excavation or dredging be required in water or wetlands? (acres)
If yes, volume: o--�o (cubic yards) X Yes nI No
a Composition of material removed:
a6�t AL• s,Fb Te rrrr
b: Disposal site for excavated material: .v
c• Method of dredging: �¢A�sr` r
�3Au��lo8, 1=2dIn �.AN u, Pte�.Ie a.,ev ARe �
e alrn o Blom
15. List other applications, approvals, or certifications from other Federal, state or local agencies for an structure
construction, discharges, or other activities described in the application(her., preliminary y s'
approval, building permit, SEPA review, p ary Plat approval, health district FERC license, Forest Practices Application, etc.) Also indicate whether work
has been completed and indicate all existing work on drawings.
Type of Aoaroval lssuinQ Asency T Date of Date Completed?Identification No. Application
Approved Yes_ or No
SEPA Lead Agency:
SEPA Decision Date:
16. Has any agency denied approval for the activity described herein or for any activity directly related to the activity
described herein? ❑ Yes 10 If yes, explain:
SECTION B - Use for Shoreline& Corps of Engineers permits only:
17. Total cost of Project. This means the fair market value of the project, including materials, labor, machine rentals, etc.
18. Local government w/jurisdiction: _r ,4SON
Shoreline Environment designation: Zoning designation:
19. For corps permits;provide names, addresses, and telephone numbers of adjoining property.owners, lessees, etc.,
PLEASE NOTE: Shoreline management compliance may require additional notice— consult your local government.
SECTION C - Complete for any permit covered by this application
20. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am
familiar with the information contained in this application, and that to the best of my knowledge and Belief, such
information is true, complete, and accurate. I further certify that I possess the authority to undertake the proposed
activities. I hereby grant to the agencies to which this application is made, the right to enter the above-described location
. to.inspect the proposed or completed work.
-$ ature of pli t or Au orized Agent (REQUIRED) Date
Signature of Landowner (REQUIRED if other than applicant) Date
This application must be signed by the applicant. If an authorized agent is to be designated, the applicant must also sign
at Item #3.
18 U.S:C §1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false, fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fi audulent statement or
entry,,shall be fined not more than $10,000 or imprisoned not more than 5 years or both.
Application Page 4 of 5
DO NOT SEND FEDERAL PROCESSING FEE RRTM APPLICATION
TO BE COMPLETED BY LOCAL OFFICIAL
A. Nature of the.existing shoreline. (Describe type of shoreline; such as marine,.stream,lake, lagoon, marsh,bog, swamp,flood plain,
floodway, delta;type.of beach,:such as accretion,erosion;high bank,low:bank,or dike;material such as sand,grave(, mud, clay,
rock,riprap;and:extent and:type of-bulkheading,:if any;)
B. In the event that an of the.proposed s enures will.:e buildings or stru xceed a<hei t o v eet y propos g gh f thuty.& e f above the average grade level,
indicate the approximate.location<of and:number of:residential.units.,.existing-anilpotential,:that:will:have:an obstructed view:
C. If the.application involves a:conditional usear variance,':set faith:m�fiiU:thatportion..of3he:master.program which provides.that the
proposeduse inay be:a.conditional:use; ot,ui-tfie..case of:a:vaiianee,::fro i.which.the varianceis being sought:
These Agencies are Equal Opportunity and Affirmative Action employers.
For special accommodation needs, please contact the appropriate agency from Appendix A.
Application Page 5 of 5
■
R
i
E
E
R
M
T� m
j. T Tw..h
HWW.M— Wahl M..
A F
; 0 9
s � �
C] �
op
C °
rr y q
E� d sS•Ao S e g 41
3
3 3 6
R•nq. 77d�•.+.•a
• � z
z
0 46bh
II111
i
1
f
e
++fFF
1 '
1 1
q 1
M �
a
qu
/
Pr Tn / / J
1-3tt
N '�
, C \
21
/
o3
A
0 E
REMEDIAL ACTION PLAN
r1p a
LE
s
1
I
f
e
4
4L
r�
-------------
oil
O
s �
i i 1
a {{
I
}}dLld'iiii=�� -
o�
REMEDIAL ACTION PLAN
L—L
S o