Loading...
HomeMy WebLinkAboutGrading Concern - GRD Letters / Memos fawad Von". e "A Residential Golf Community" August 18, 2003 R E C L' , V D AEG 192003 Kristin French Code Enforcement Planner MCC - p�ANNING Mason County Dept. of Community Development P.O. Box 279 Shelton, WA 98584 RE: Tax Parcel Number 12218-40-00000 Ms French, I am writing in regards to your letter concerning grading activity alongside a pond located on our farm that we call Pond 8. Pond 8 is actually a multipurpose facility. It is an irrigation reservoir, storm water detention facility and an infiltration pond. In 1968 Pond 8 was constructed to be an irrigation reservoir to irrigate our farm fields and garden. We requested and received water rights from the Washington State Department of Ecology to irrigate 90 acre feet per year. A copy of the Certificate of Water Right is enclosed. We originally irrigated out of the pond with a 7.5 horsepower gasoline pump. Several years later we upgraded our pump station to a 15 horsepower electric pump. Mason County PUD#3 installed power poles to the pump station site and from that point on until today we are irrigating with this pump. The grading/fill deposition the inspector observed was an improvement to our pump station site bringing our pump station up to road grade. In 1992 in conjunction with the development of LakeLand Village Division 12, our engineer, Pat McCullough of ESA, developed a Storm Water Management and Erosion Control Plan as part of the approval process for Mason County. Documentation from this Office:(360)275-2474 • FAX:(360)275-0266 • PO Box 108 • Allyn,Washington 98524 LakeLandll@msn.com • www.LakeLandLiving.com plan is enclosed. Pond 8 was incorporated into this plan as a storm water detention facility. At that time we constructed a dam on the north end of the pond and installed an outflow structure per plan specifications. Pond 8 also serves as an infiltration pond for the portion of Division 12 that is located in the Lake Devereaux drainage basin. As part of the mitigating conditions for Final Plat Approval for Division 12, the Mason County Board of Commissioners required water quality testing from Pond 8 at the outflow for the months of October through April. This is to ensure the storm water quality flowing into the Lake Devereaux drainage basin. These tests are performed by Twiss Analytical Laboratories with the most recent analysis attached. If you have further concerns,please feel free to contact me at (360)275-2474. We do appreciate your inquiry and concern that this might have been a wetland. We have always prided ourselves in the protection and preservation of our environment and its aesthetic values as we have developed LakeLand Village. Sincerely, ANDERSON ONS, INC. Richard A. Anderson President a' 3 (6 m y9D +C � c tr N L i C S .OLl- N q � m 96 C3 3 ru A ❑❑❑ T zar w � � y Ln C3 �, g C3 C ❑❑❑ ru .n 03Elm g wLn £ n ❑ ❑❑ o Ca YMSTIN FRENCH-PLANNING DEPT. `n m PO BOX 279 m SHELTON WA 98584 Co ti ( �, Postage $ Q /A 9 O Certified FeeAS C3 �/�r�r�� 0 O Retum Reciept Fee (Endorsement Required) • 8Here j'O O Restricted Delivery Fee � (Endorsement Required) 3� m ru Total Postage&Fees $ 1=3 ent To C] or PO Box No. 60V- ' O City State,ZlP+4--- --------------------------------------------------------- PS Form :00