HomeMy WebLinkAboutBLD2007-00202 Final Pass - BLD Inspections - 3/5/2007 o CONCRETE MECHANICAL MANUFACTURED HOME � m
o Footings t Setbadw
eGasPipin By Ribbons —
C) Interior Date By Interior-Date By Dow By 2
fp Exterior Date By Exterior-Date B
Bet-up
Point toad l Isolated Postings INSULATION Date By
Date By_ Dam �INSULATION Date
FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Deta By DECKS
FRAMING Waft Date By
Date v-7 BYMA
Data By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork .Attic
Type;
Date By Date By Date By
OWV DRMALL Type:
Int.Brace Wall
Gate By W
Date By Dew By FINAL INSPECTION 0
Water Mine Fire Sep@ration N
Date By Date By Data -('? B*ojp^ y
Pate or Request Inspect. o
Type of Insp. Fail Date taste Dane By Comments
CD
CD
a
S
I
a
0
0
i
a
i
0