Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PAR2002-00085 - PAR Letters / Memos - 8/19/2004
MC O T MASON COUNTY SU O lY N v PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: Aug. 19'', 2004 INTER-DEPARTMENTAL COMMUNICATIONS TO: Grace Miller, DCD - Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. SUBJ: Stormwater Site Plan Review NAME: Grapeview Community Club Expansion PAR202-00085 Grace, I've reviewed the materials you delivered to me, and find no site work details addressing stormwater collection,treatment, or disposal. The following is a copy of P/W's comments regarding a 2002 Pre-App meeting. It appears that the current proposal generally requires the same stormwater planning that was perceived in 2002. Proposed improvements will not require any changes to the existing access, so access is not expected to raise any issues. The proposal ypears to create in excess of 5000 square feet of new impervious surfaces, so a Large Parcel Stormwater Site Plan (SSP) will be required to be designed and constructed. As a Large Parcel activity, the SSP will be required to be prepared by a licensed engineer. The SSP will be required to provide for Ecology's minimum requirements (1992 PSWOA Technical Manual) with a Permanent Stormwater Pollution Prevention Plan, and a Temporary Erosion and Sediment Control Plan. Contact Alan Tahja at County extension 461 regarding access and stormwater management issues. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Si cerely, An A. Tahj File: H:\WP\Strmwtr\Reviews\XXXxxXX.doc i i I Case Number:PAR ab0"a o00S5 MASON COUNTY pA�m ,3-C PRE-SUBMISSION CONFERENCE REQUEST FORM The purpose of the pre-submission application is to identify and/or eliminate as many potential problems as possible in order for the project to be processes without delay. Representatives from the Building Department, Fire Marshal's office,Environmental Health,Planning and Public Works Departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program,zoning,availability of sewer and potable water,development concepts,building construction,fire protection,and life safety of the proposed project. Your pre-submission conference will be informative when you provide accurate and detailed information on the Pre-Submission Conference Application Form and the site plan. Pre-submission conferences are held every Wednesday and last approximately one-hour.To schedule a conference complete the application on both sides and return seven(7)copies of the site plan to the Mason County Department of Community Development,attn: Pre-Submission Conference Coordinator.P.O.Box 186,Shelton,WA 98584. Fax request forms to(360)427- 7798. If you have questions call(360)427-9670 ext. 281. Date: 10/t/CZ Site Plan Applicant: Submit i(!: opies Name: MA-C)O W 6o u rJ T-Y FUZ6 'D 151151GT 3 Address: P.O. 130X t 2q (4550 5-G R.A?EFyi 8W t.AOP Include the following Daytime Telephone: C-1 PCY to Wj TWA 9 8 64 t'o information on the site plan: 3 - 5 - ✓ Property lines, easements,and right-of- Representative: (5 W,,o,,N-1- Fps-fig, ways. ka : T \Y I t-.I./A 5 'PICI4 I _�S ✓ The location of all existing and proposed inn Address: P.O. 13O1C 1 O2 ) 5 51_T-C 4 ,\VA4 9858`�' structures. Include square footage of ne Telephone: 3CPO -ct Of. -0'11 existing and proposed structures. ` ✓Parcel Number: (12 digits) Setback distance,in feet,from all property c� lines and buildings. I ©C¢ ✓ Existing and proposed road access to and from the site. Description of Project: Include square footage of structure,use of buildings(I.e. office, ✓ Parking sites warehouse, restaurant, storage, etc.), occupancy classification per Location of on-site sewage tanks and U.B.C. table 3-A, and construction type. Provide one set of drainfields. plans, if available. Use a separate sheet if necessary. ✓ Location of drinking water supply. Include (f-*--- 5'l'p-T t b 64 . C�G V 13 C�CGu PA hI GY . location on the proposed site and T`9 P5 79: N Go A7STTy GTE N . 3 CY O �fW, surrounding parcels. Atyrrto�4 To EKLST, 24co Ste• A171'Al N - a'L-VC,-- `� Steep bluffs,wetlands, streams,and bodies of water. ALso OF 24W S-f- L- 1C tom'• M,,QrZ Pu gro5 g ©F Tg6,6GT 1,5 TU D EV E W t A motion of fire hydrants and emergency vehicle access roads, including grade. Go M M U 1V I"T`l 'D15AST�P� G��I Tyr ✓ Surface and storm water run-off routes. Continued on reverse side Has this project been discussed during a previous Pre-Submission Conference? If yes,please indicate date V I,5r—ut;,�E51D J4.g a '5eF a eATe 1P)O i L V l W G 1 N ZOO I Will the building have employees?If yes,how many? Y t✓'S 3 SAI-A -- A-t) r -,5-rI Cal What is the water availability of the proposed project? If there is an existing well,what is the name of the system? 1-K t-_T_1 1 f4 G 11Z IYA I'>u 'V tjt'L.- What is planned for an on-site sewage system? If you are proposing a new on-site system provide detail on the required site plan. EX I.57 ( F4 6 �5E'P-0C, -.5`(STEM _M T E A?'A N•CX?New A?15 W 5�PTIG "5-1 'STD M E T om 16r AV i4?,C-A 51- QW ki O 0 S iTe FLA 10 ADDITIONAL COMMENTS: Z-,)O NOT O. A I� 1T G O io APPLICABLE BUILDING CODES: 1997 Uniform Building Code-WAC 5140 1997 Uniform Mechanical Code-WAC 51-42 1997 Uniform Plumbing Code-WAC 51-46/5147 1994 Non-Residential Energy Code/Ventilation and Indoor Air Quality Code Mason County Ordinance Date and Time Conference Scheduled: C _ h�� ,�?] �S .• �j G- 3� Location: �-