Loading...
HomeMy WebLinkAboutCOM2006-00079 - COM Letters / Memos - 7/18/2006 MASON COUNTY DEPARTMENT Of HEALTH SERVICES July 18, 2006 PO BOX 1666 Shelton WA 98584 Shelton (360)427-9670 Fax (360)427-8442 MASON COUNTY FIRE DIST#3 Elma (360)482-5269 P.O. BOX 142 GRAPEVIEW WA 98540 Belfair (360)275-4467 Case No.: COM2006-00079 Parcel No.: 121082160041 Dear Applicant: Your building permit cannot be approved by Mason County Environmental Health until the following are completed and turned in: aPlease see comments at the end of this letter. Please call me at(360)427-9670, ext. 554 if you have any questions. Sincerely, Trish Woolett tw@co.mason.wa.us Environmental Health Mason County Health Services Comments: According to the site plan and septic records there is a drainfield under this breezeway. After speaking with a plans examiner and reviewing the construction documents. This breezeway is required to have barried footings. The-setback to these footing from a drainfield is 1 Oft. It appears this setback can not be met. You have a couple options; redesign the building so that the footings are not required (engineering) or abondon this system and connect to the new system. If you wish to connect to the existing (new), please contact a septic designer. 7/18/2006 1 of 1 COM2006-00079 w MASON COUNTY DEPARTAkENT OF HEALTH SERVICES July 18, 2006 PO BOX 1666 Shelton WA 98584 Shelton (360)427-9670 RECEIVED Fax (360)427-8442 MASON COUNTY FIRE DIST#3AUG O 7 2006 Elma (360) 482-5269 P.O. BOX 142 Belfair (360)275-4467 GRAPEVIEW WA 98540 426 W. CEDAR STD Case No.: COM2006-0007,�,;;. . Parcel No.: 121082160041 Dear Applicant: Your building-permit cannot be approved-by Mason County Environmental Health until the following are completed and turned in: mPlease see comments at the end of this letter. Please call me at(360)427-9670, ext. 554 if you have any questions. Sincerely, Trish Woolett tw@co.mason.wa.us Environmental Health Mason County Health Services Comments: According to the site plan and septic records there is a drainfield under this breezeway. After speaking with a plans examiner and reviewing the construction documents. This breezeway is required to have barried footings. The setback to these footing from a drainfield is 1 Oft. It appears this setback can not be met. You have a couple options; redesign the building so that the footings are not required (engineering) or abondon this system and connect to the new system. If you wish to connect to the existing (new), please contact a septic designer. 7/18/2006 1 of 1 COM2006-00079