Loading...
HomeMy WebLinkAboutBLD10818 Bulkhead - BLD Inspections - 6/18/1981 MATZ, Larry #E10818 Ati 8036 " ' St. , Tacoma ',6-18-81 Case Inlet, Road just before Treasure Island 5-21-1, Tax Lot 162A Bulkhead Contractor - Roy Brumbaugh, Brumbaugh Construction $2,160.00 Shoreline Exemption ...___.0 �--� �cy" _ ��1 � �, � � o � 1 �� 3 . .� K BUILDICS PERMIT APPLICATON ` MASON COUNTY P.O. Box 186 Shelton, Washington 98584 426-5593 —4- �j DATE ISSUED V N f PERMIT NO. f D FI g OWNER NAME MAIL ADDRESS CITY&STATE ZIP PHONE s . c6 - i DIRECTIONS TO JOB SITE v LEGAL _ y (❑ SEE ATTACHED SHEET) DESCR. c� 2 — / /f X L-0 / . CONTRACTOR NAME MAIL ADDRESS CITY&STATE LICENSE NO. PHONE crC- USE OF BUILDING !J/- 1,J /Y4zf 15 � `T/4-1 Al /, G WA L � Class of work: j(I NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: Valuation of wo : $ C ` PLAN CHECK FEE PERMIT FEE 47 SPECIAL CONDI S: (Dry BEDROOMS DECKS CARPORT ❑ NOTICE BATHROOMS TOTAL SO. FT. GARAGE ❑ ATTACHED ❑ SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING NO. OF STORIES BASEMENT El ATTACHED AIR CONDITIONING. TOTAL SO. FT. FIREPLACE ❑ DETACHED ❑ THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHOR- CONTRACTOR AFFIDAVIT IZED IS NOT COMMENCED WITHIN 180 DAYS,OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER I certify that I am a currently registered contractor in WORK IS COMMENCED. the State of Washington and I the aware of the FOR OFFICE USE ONLY ordinance requirements regulating the work for which the permit is issued and all work done will be in Conformance therewith. PERMANEN SHORELINE SEASONAL ❑ FLOODPLAIN ❑ Firm E.D. NO. S.E.P.A. ❑ By Special Approvals IN OUT YES APPROVED NO Lic. No. � UM ` 1 C_ 2 `�� Date / — ZONING PLANNING DEPT. OWNERS AFFIDAVIT HEALTH DEPT. PUBLIC WORKS I certify that I am exempt from the requirements of the FIRE MARSHAL contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for BUILDING DEPT. $� which this permit is issued and that all work done will ROAD ACCESS in conformance therewith. MOTOR VEHICLE PERMIT //�a1 rf A LIC TION EPTED B PLANS CHECK BY APPROVED FOR ISSUANCE Own A '�'�st Date_ BY CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O CASH