Loading...
HomeMy WebLinkAboutMEP2004-00072 - MEP Permit / Conditions - 5/2/2005 , t J PypN'STATFO� MASON COUNTY o A o N DEPARTMENT OF COMMUNITY DEVELOPMENT o N Z Planning Division z� N Y ti P O Box 279, Shelton, WA 98584 1864 (360)427-9670 MASON ENVIRONMENTAL PERMIT May 02, 2005 °"f , D TO BE KEPT IN THEE ROBERT DROHMAN PARCEL FILE - - —005 9981 E. SR 106 MCCD 7ti!l�f UNION WA 98592 -- -- Parcel No.: 322365100032 Issued: 5/2/2005 Case No.: MEP2004-00072 Project Description: CONSTRUCT NEW JOINT USE PIER RAMP AND FLOAT: 6' X 60' FIXED PIER (DOUGLAS FIR), 4' X 35' ALUMINUM RAMP, AN 8' X 12' LANDING WITH ATTACHED 8' X 80' FLOAT FULLY ENCLOSED IN EXTRUDED POLYETHYLENE, POLYSTYRENE FLOATATION. 14 PILES & 4 STUB PILES (AZCA). y The following critical areas are present on this property: Long-Term Commercial Forest X FWHCA7RE ,� Ch. 17.10.060; Ch. 17.01.110;Mineral Resource Lands Frequently Flooded j 0 2005 f Ch. 17.01.066; Ch. 17.01.090; __ � Inholding Lands Landslide Hazard ea CCD - PLA,�NG Ch. 17.01.062; Ch. 17.01.100, - Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. 2"A'�L�w 5-1/3./C5 Authorized Local Government Official Date Mason Environmental Permit 5/2/2005 Case NO.: MEP2 - Conditions: MaY ' o zoos 1.) All construction and demolition debris must be removed from the beach after prof[nek*MD completion. Proper disposal of construction debris must be on land in such a ma _ PLANNING debris cannot enter or cause water quality degredation of State waters. 2.) Approved per dimensions and setbacks on submitted site plan. 3.) Floatation for the structure shall be entirely enclosed and contained to permanently pr nt the br�a�C loss of the floatation material into the water. 4.) All floating structures shall include intermittent supKrts,which r paCaltel to the shoreline to keep structures off the tidelands at low tide. X 5.) The pier, ramp,float, and associated moo ' s shall be loc d void hading of eelgrass and other aquatic vegetation.X 6.) Water quality is n be degrad e d iment of the aquatic environment as a result of this project. X 7.) The surface of sting struct ' II e,a�minimum of eight inches above the surface of the water. X ( T 8.) Recreational piers shall be no higher than 11 feet above mean higher high water. Piers an docks shall ha at least an eight foot span between pilings. X �•4 O ._ 5/2/2005 Page 3 of 3 MEP2004-00072