Loading...
HomeMy WebLinkAboutMinimum Commercial Standards - COM Letters / Memos - 5/25/1993 GARY YANDO,DIRECTOR Py�r1_STq;Fo o a°u �► DEPARTMENT OF COMMUNITY DEVELOPMENT o T z PLANNING -SOLID WASTE-UTILITIES z� N Y Y BLDG. III • 426 W. CEDAR • P.O. BOX 578 of rasa �o SHELTON, WA 98584 • (206)427-9670 May 25, 1993 Pen-nit Consulting Services 10020 Main Street Suit 114 Bellevue, WA 98004 RE: Belfair prop. right vicinity. Commercial Development. S t o r in w a t e r management. Dear PCS: The County requires commercial development to meet the following minimum standards for site drainage: 4.2 Runoff Quantity All proposed projects must provide runoff quantity controls to achieve the following three purposes unless exempted because of direct discharge to a regional facility or a major body of water or because of negligible increase in runoff ( see 4.2.1, below) 1. Infiltrate at least the excess runoff volume generated by the proposed development for the 2-year , 24-hour design storm, provided that.site conditions are appropriate and ground water quality will not be impaired. Release any residual runoff from the 2-year, 24-hour design storm at no greater than 100% of the peak runoff rate for that storm for existing site conditions. 2. If infiltration is precluded because of site conditions then detain and release runoff from the 2-year, 24-hour design storm at no greater than 50% of the peak runoff rate for pre- existing site conditions. 3. Detain and release runoff from the 10 and 100-year, 24-hour design storm at no greater than 100% of the peak rate for existing site conditions. If you have specific questions about stormwater facility design please contact Alan Tahja of the Mason County Public Works Department. Please submit your plans to the address below, ATTN: J. Manassee. Elecycled PCs page 2 /RKetf H. assee, Planner Department of Community Development