Loading...
HomeMy WebLinkAboutBLD98-00977 Safeway - COM Engineering / Geo-Tech Reports - 12/9/1998 31tA Mason County Permit Assistance Center Mason County Building III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 December 9, 1998 Subject: Safeway #1571 Attn: Kelly Mayo Dear Kelly, This letter is in response to the correction notice dated November 24, 1998. 1994 Uniform Building Code Items Item 11: Our office has indicated the areas for special inspection required, the owner shall provide the name of the special inspector they Wish to use. Item 12: The metal siding is not a structural item, see the architectural specifications. Item 13: See the revised structural drawings. Item 14: See the revised structural drawings. Item 15: See the revised structural drawings. Item 16: See the revised structural drawings. Engineering Items Item 1: See calculation sheet 12 . Item 2: The equipment platform is not required for this store, void calculation sheets E8, E8A, E9, and E10. Item 3: See Item #2. -Item 4: See the attached new calculation sheets E12 , E13 , E13A, and E13B. Item 5: Detail 17/S4 is not used. Item 6: We have reviewed the details and from past performance the connections are sufficient. Item 7: See the attached new calculation sheet 15. Item 8: See the attached new calculation sheets E12 , E13 , E13A, and E13B. If you have any questions please contact me at my office, 425-489-9622 Sincere , Robert J. Bosek Jr. P.E. Civil and Structural Engineering 19704 9th Drive S.E. Bothell, WA 98012 (425) 489-9622 Fax. (425) 489-9622 01/0�/1999 10:01 253-8e4-0651 JERRY HARRIS PAGE 01 ath ws & .11a E..npineeru .tldeckar icat&Electricgd Consultants January 4, 1 esa Mason County ' Permit Assistance Center Mason County Building III 420 W. Cedar, Shelton, WA 98584 Attention: Kelly Mayo �i s Subject: Safeway Store#1571, Belfair Mason County Permit#Bld98-0977 Dear Mr, Mayo:. Following are responses to your plan review letter dated November 24, 1998. Plumbing The plumbing systems are deaigned to the 1994 Uniform Plumbing Code. Item 1: The Mechanical and Plumbing application has been cornpisied and enclosed with,this resubmittai. Item 2: Reference sheet•number has been changed to M-4..'On this Floral Department Piping Detail, note that the water heater PRV is piped through an air gap fitting,then to the sewer system. Item 3: Fixture P-38 is not used. Item 4:All drains have been labeled.. Item 5:Waste and water piping on sheets M-2 and M-4.has been completed. .,Item 6: Gas piping hats been completed and gas meter location shown.• Itern,7: P trap at disposal Is now Indicated.The drain lines from the two remaining compartments are Indicated by note to be manifolded and piped indirect to the floor sink. Item 8: The water softener is an optional item to be used when the water supply is considered hard.On this project,the Belfair Water Dist. does not consider the water supply hard, -Item 9: Note that the detail on sheet M-5 shows the PRV's piped to the drain pans and the drain pans piped to outside, Mechanical. Item 1: Please refer•ta the enclosed catalog cut sheets for the Onan 45,EM generator set for size, horsepower, combustion air, heat rejection, etc.See sheet M-2 for gas pipe size. See sheet M-3 for room.ventilation. (Vote also that the room is open to the'stockroom and freely communicates with the air volume in the stockroom. Item 2:The air conditioning schedule on sheet M-1 is now Complete.' i,Aubum Way N,Suite 209 • Aabum,WA 98002 a Phone 253-804-0737 • Fax 253-804-0651 • Ep ail mheia&Ts@aol.com 01/05/1999 10:01 253-804-0651 JERRY HARRIS PAGE 02 Item 3: See sheet A-2.3, Roof Plan for roof hatch location and detail 1 for roof hatch detail. Item 4: Sheet M-4 is now complete with gas pipe string and equipment btu requirements.'-See enclosed catalog cuts for details of hood and filters, which are provi.ded•by Safeway and installed by the mechanical contractor. Item 5:The 2250 CFM make-up air unit essentially makes up air for the Wok hood (EF-3), allowing fora slight negative pressure. The remainder of the make-up air ford a Deli and Bakery'are to be�u•pplied from the main sales AC unit,which can provide up t4 8000 CFM of outdoor air. Item 8:We will instruct contractor.that compliance is'to be per the 1994 UMC, not NFPA 96.1 If you have any questlons or comments, please call rne. sincerely, , • • ry D. arFis, P,E.