December 9, 1998
Subject: Safeway #1571
Attn: Kelly Mayo
Dear Kelly,
This letter is in response to the correction notice dated
November 24, 1998.
1994 Uniform Building Code Items
Item 11: Our office has indicated the areas for special
inspection required, the owner shall provide the
name of the special inspector they Wish to use.
Item 12: The metal siding is not a structural item, see the
architectural specifications.
Item 13: See the revised structural drawings.
Item 14: See the revised structural drawings.
Item 15: See the revised structural drawings.
Item 16: See the revised structural drawings.
Engineering Items
Item 1: See calculation sheet 12 .
Item 2: The equipment platform is not required for this
store, void calculation sheets E8, E8A, E9, and
E10.
Item 3: See Item #2.
-Item 4: See the attached new calculation sheets E12 , E13 ,
E13A, and E13B.
Item 5: Detail 17/S4 is not used.
Item 6: We have reviewed the details and from past
performance the connections are sufficient.
Item 7: See the attached new calculation sheet 15.
Item 8: See the attached new calculation sheets E12 , E13 ,
E13A, and E13B.
If you have any questions please contact me at my office,
425-489-9622
Sincere ,
Robert J. Bosek Jr. P.E.
Civil and Structural Engineering
19704 9th Drive S.E. Bothell, WA 98012 (425) 489-9622 Fax. (425) 489-9622
01/0�/1999 10:01 253-8e4-0651 JERRY HARRIS PAGE 01
ath ws & .11a
E..npineeru
.tldeckar icat&Electricgd Consultants
January 4, 1 esa
Mason County '
Permit Assistance Center
Mason County Building III
420 W. Cedar,
Shelton, WA 98584
Attention: Kelly Mayo �i s
Subject: Safeway Store#1571, Belfair
Mason County Permit#Bld98-0977
Dear Mr, Mayo:.
Following are responses to your plan review letter dated November 24, 1998.
Plumbing
The plumbing systems are deaigned to the 1994 Uniform Plumbing Code.
Item 1: The Mechanical and Plumbing application has been cornpisied and enclosed with,this
resubmittai.
Item 2: Reference sheet•number has been changed to M-4..'On this Floral Department Piping
Detail, note that the water heater PRV is piped through an air gap fitting,then to the
sewer system.
Item 3: Fixture P-38 is not used.
Item 4:All drains have been labeled..
Item 5:Waste and water piping on sheets M-2 and M-4.has been completed.
.,Item 6: Gas piping hats been completed and gas meter location shown.•
Itern,7: P trap at disposal Is now Indicated.The drain lines from the two remaining compartments
are Indicated by note to be manifolded and piped indirect to the floor sink.
Item 8: The water softener is an optional item to be used when the water supply is considered
hard.On this project,the Belfair Water Dist. does not consider the water supply hard,
-Item 9: Note that the detail on sheet M-5 shows the PRV's piped to the drain pans and the drain
pans piped to outside,
Mechanical.
Item 1: Please refer•ta the enclosed catalog cut sheets for the Onan 45,EM generator set for
size, horsepower, combustion air, heat rejection, etc.See sheet M-2 for gas pipe size.
See sheet M-3 for room.ventilation. (Vote also that the room is open to the'stockroom
and freely communicates with the air volume in the stockroom.
Item 2:The air conditioning schedule on sheet M-1 is now Complete.'
i,Aubum Way N,Suite 209 • Aabum,WA 98002 a Phone 253-804-0737 • Fax 253-804-0651 • Ep ail mheia&Ts@aol.com
01/05/1999 10:01 253-804-0651 JERRY HARRIS PAGE 02
Item 3: See sheet A-2.3, Roof Plan for roof hatch location and detail 1 for roof hatch detail.
Item 4: Sheet M-4 is now complete with gas pipe string and equipment btu requirements.'-See
enclosed catalog cuts for details of hood and filters, which are provi.ded•by Safeway and
installed by the mechanical contractor.
Item 5:The 2250 CFM make-up air unit essentially makes up air for the Wok hood (EF-3),
allowing fora slight negative pressure. The remainder of the make-up air ford a Deli and
Bakery'are to be�u•pplied from the main sales AC unit,which can provide up t4 8000
CFM of outdoor air.
Item 8:We will instruct contractor.that compliance is'to be per the 1994 UMC, not NFPA 96.1
If you have any questlons or comments, please call rne.
sincerely, , • •