Loading...
HomeMy WebLinkAboutRAP Letters / Memos - 6/28/1990 Washington State Department of Transportation Office of District Administrator 5720 Capitol Blvd.,KT-11 Tumwater,Washington P.O.Box 9327 Olympia,Washington 98504-9327 Duane Berentson,Secretary O � M ® � O V June 28,1990 Grace Miller, Planner D Mason County Department of .�(/� 3 1,Q90 General Services P.O.Box 186o Shelton,WA 98584 fti ,u'smVICES SR 3 MP 25.5 Vicinity Belfair Equipment Rental E.C.File No.90251-6 Dear Ms.Miller: McCUS We have received your request for review of the above proposal and offer the following comments: The proposed access must be constructed to Department standards. We have sent the applicant a commercial approach plate for their reference use. The applicant has also been provided with a permit application form and instructional letter which should be submitted to our office. A plan which clearly shows the exact location of the proposed access should be provided. Details of road approach construction will be determined during the permit application process. The Department requests the opportunity to review and comment on the drainage plans and calculations for this proposal. Additional surface water runoff generated by development of the property must not be directed toward the State highway right-of-way. i The Department will not be responsible for noise attenuation if the subject property experiences noise levels in excess of the maximum allowed for the land use. i Advertising signs visible from an adjacent State highway must comply with the State Scenic Vistas Act of 1971,which is administered by the Department. For information regarding the signing i regulations,contact Jack Smith in the District 3 Traffic Operations office at 753-7220. If you have any questions in response to our review comments,please contact Ed Sharp at 753-1901. Hammond,P.E. Transportation Planning Engineer District 3 PJCH PSC cc: N.Williams Ronald&Judith Mears