Loading...
HomeMy WebLinkAboutStormwater/Runoff Drainage Proposal Review - PLN General - 5/31/1994 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 DATE May 31, 1994 INTER-DEPARTMENTAL COMMUNICATIONS TO: JASON MANASSEE, Planner - DCD FROM: ALAN A. TAHTA, Office Tech. - P/W SUBJ. McDONALD'S - Belfair, Ace Site, Stormwater/Runoff Drainage Proposal I've reviewed the stormwater/drainage proposal prepared for McDonald's in Befair, Washington by MAP Ltd. The proposal provides for water quality treatment of a 6 month storm event and provides for infiltration of the runoff from a 100 yr storm event. The engineer has employed a flow splitter that delivers flow quantities less than a water quality design storm to an infiltrating bio-Swale. Larger storm event runoffs are directed around the bio-swale and are delivered to an underground infiltration trench. I expect this arrangement to work well in handling McDonald's runoff and in helping to alleviate the surface drainage problem that exists in Belfair under normal operating conditions, but I feel the Engineer should incorporate an emergency spill separator to pre-treat the parking lot runoff prior to delivering the stormwater to either the bio-swale or the infiltration gallery. In the event of a parking lot spill, petroleum products could be delivered directly to their bio-swale or to their infiltration trench, resulting in the possibility of introducing petroleum contaminants into the area's groundwaters. I have been in contact with Mark Eisses, P.E. , a principle of MAP Ltd. and he understands my concern and will be submitting a revised plan sheet which incorporates an oil/water separator into one of the catch basins. I requested that he furnish us with three copies of the revised page of the Drainage & Grading Plan. The number of parking spaces appears to be adequate for the building size and the aisle widths appear adequate for the parking angle chosen. An Operation & Maintenance document should be prepared and submitted as part of the proposal. Enclosed please find an edited version of Kitsap County's standard O&M document. The enclosed document has not been approved by our County Prosecutor's Office, so if a document fashioned after this example is submitted, it will need reviewing by the Prosecutor's Office before final acceptance. I have furnished Mr. Eisses a copy of this same document for editing and submittal. Attached you should find a four page Drainage and Grading Plan, a 16 page calculation brief, and a sample O&M agreement. IV'rAA4 Jr7l;L_z- TARJA File: H:\WP\LETTERS\MAC-D.IDC