Loading...
HomeMy WebLinkAboutProposed Grading and Erosion Control Plan - PLN General - 10/7/1993 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 INTER-DEPARTMENTAL COMMUNICATIONS DATE October 7, 1993 TO: JASON MANASSEE, Planner-DCD FROM: ALAN A. TAHJA, Office Tech.-P/W SUBJ: ACE Paving Co. Inc. Belfair-SR3 Site. . .Stormwater Jason, I've reviewed the proposed grading and erosion control plan for ACE Paving Company's planed re-grading of their Belfair commercial site and though I dislike the extent of their proposed stormwater detention facilities, I have difficulty faulting their proposal . Computational analysis of the site reveals that because the site is already clear of trees and appreciable brush or ground cover, the affect of after development stormwater run-off is nearly negligible. The proposed detention facility provides adequate capacity to address PSWQA water quality standards for detention and infiltration. If the existing condition of the property was considered to be young or medium aged second growth timber and underbrush, the detention volume would have to be substantially greater. This greater detention capacity would be beneficial to the community of Belfair inasmuch as there currently exist problems directly downstream from this site that are aggravated by the run-off being shed from this site and other properties in the immediate vicinity. There appears to be little justification for encouraging infiltration in the Belfair area because of a high groundwater table and detention is the BMP which most directly addresses the existing surface water run-off problem in Belfair. AM =. :I-i I 7�, Alan A. Tahja File: H:\WP\LETTERS\ACE2BEL.IDC