HomeMy WebLinkAboutIncomplete Drainage Plan - SEP Letters / Memos - 5/13/1994 GARY YANDO,DIRECTOR '
STATFo
o a o N u DEPARTMENT OF COMMUNITY DEVELOPMENT
o T i PLANNING -SOLID WASTE-UTILITIES
z� N Y y BLDG. III • 426 W. CEDAR • P.O. BOX 578
1864 SHELTON,WA 98584 • (206) 427-9670
May 13, 1994
Jack Johnson
P.O. Box 1119
Belfair, WA 98528
Olympic Engineering
3472 NW Byron Street
Silverdale, WA 98383
RE: Incomplete Application. Inadequate drainage plan. PN#123213400030.
Dear Sirs:
After a recent review of this proposal by county engineering staff it was determined that further
hydrologic study is needed.
Page 4, Item 4 of the SEPA checklist states that no surface water will be diverted. The site in
its present condition appears to be the recipient and final destination of runoff from the State's
drainage and there is no indication that any of the water reaching the property leaves the
property except by infiltration. The proposal intends to "tight-line " the State' run-off across
the property and deliver it at a new elevation that would not be attainable in the sites existing
condition without impounding a large quantity of water before spilling any over to the 80'
elevation.
This proposal has potential for adversely impacting the properties between it and the Union
River or Hood Canal and further hydrologic and hydraulic investigation of this proposals'
impacts is necessary. _
Please submit a drainage report which adequately addresses all these issues.
Respectfull
J. Manassee, Planner
Department of Community Development
cc:
file
Alan Tahja, P.E., MCPWD
Rick Mowlds, WDOT
l