APPLICATION FOR COVERAGE
SAND AND GRAVEL GENERAL PERMIT
For the Discharge of Process Water, Stormwater or
WAS Y/T11 STATE Dine Dewaterinlg Water Associated with Sand and Gravel Mining, Rock
HI
9 [ / A R I Al E l i a F Quarries and Similar Mining Operations,Including Stockpiles of
C C 0 L 0 C Y Mined Material, Concrete Batch Operations and Hot Mix Asphalt operations
(DO NOT USE FOR COVERAGE OF PORTABLE OPERATIONS)
WASH NGTON STATE i7SF ONLY:
'R+:Ci:I:A: •. D�a�e R�eteived Covet�e Ds<te
❑0
L PERMrMt.-
Business/Corn r N e Per.-
son Name
IL RESPONSIBLA PARTY MARJNG AND CONTACT INFORMATION:
Name(primary� mailing dress)�/� 13 o� Name o�l�
Mailing A d�� e" Mailing Address
city KC7 • Ziip City p+4 X
�'��2� �' .� z:p9�v�8'
Contact Person Phone No. I Contact P son Phone No.
2 ,7 rrr l 275:
'UBI No. UBI No.
.IIL BILLING ADDRESS AND CONTACT INFORMATION:
Business/Com.y�a'ny N e iC7"er7
P
cur �s e-e caC �a' I
Mr Add s Phone No.
city '� Zip +4 site Identifier
W. FACEUTY/sITE LOCATION INFORMATION:
Business/Cippany one Contact P son
Street Address Phone No.
City /A • Coun
Legal description of site(use two of the following three):
L A4C—'/I %-; Section_�_L Township 'Z,-3 Range Uj
2.Latitude mZ�% '` L.ougitnde/g2sh,Z8�61'W (Specify degrees,minutes,and s=nds)
3. ❑ Map enclosed
07/29/2005 08: 13 FAX 3GO2773187 ESA Z 003/012
IV. FACILITY/SICI'I;LOCATION INFORMATION(continued):
• Directiane to site from nearest Hwy or City/Town:x; �� � �
—~ ire/mat,tea. �o 0/ i2,q '32 .
6ro /Sljlet cn4 1,jed I^C+qC/ 74-M Q
V. APPLICATION TYPE:
E&New Permit
- New facility ❑ Active Site ❑ Site Permit(Important-sec instructions)
Or Or ❑ Asphalt Batch ❑ Concrete Batch
❑ Existing Facility ❑ Inactive Site ❑ Rock Crusher ❑ Other
❑ Permit Modification Permit Number WAG-50- Reason for modification:
❑ Permit Renewal Permit Number WAG-50-
13 Site Permit- ❑ Asphalt Batch ❑Concrete Batch ❑ Rock Crusher ❑ Other
VL FACILITY INFORMATION: RTANT:this includes all activities Current and planned,at the site
Industrial activities covered by this application at this site: ton U`Blb
1. ❑ Minim inaction 5. b Concrete batch pWt 7. Truck washout 11. ❑ Track washing(extcrior)
2_ ❑ Crushing 6_ ❑ Hot mix asphalt plant 8, ❑ Stockpile
3. ❑ Screening ❑ Wet Scrubber 9. ❑ Blasting
4. ❑ Washing ❑ Bag House 10. ❑ Other(specify)
SIC Codes for the industrial activities described above:
1. 00811 4. ❑ 1423 10. ❑ 1499 13. Me3273
2. ❑ 1411 5. ❑ 1429 _ 8. ❑ 1455 _ 11. 02411 Tf we-k-
3. ❑ 1422 6. ❑ 1442 9. ❑ 1459 12. ❑ 2951
All industrial activities included within these SIC Codes at new facilities and those permit modifications that add new activities must
have a completed SEPA review to be considered a complete application.
1. Has SEPA review been completed for all SIC Codes? A YES ❑ NO Date
2. Lead agency issuing SEPA Determination:
3. SEPA Respomialc Ofcia1= 41,40 T J1 A�% Title:
4. Type of SEPA Determination; fiL DNS ❑ DS ❑ Mitigated DNS
Is site within a Critical Aquifer Rechm;ge Area? ❑ YES NO
Is site within a designated Wellhead Protection Areal❑ YES )91•NO
Is site within a Sole Source Aquifer? ❑ YES 0NO
VIL REGULATORY STATUS:
(check all that apply)
1.X NPDES Permit No. 4. ❑ City or County Permit No.
2. ❑ State Waste Discharge Permit No_ 5_ ❑ Dept of Natural Resources Permit No.
3. 0 Air Notice of Construction,Permit or Order,Agency
07/29/2005 08: 14 FAX 3602773187 ESA 2 004/012
VIII. WATER MANAGEMENT ON TEO srrE:
This permit is issued for discharges of stonnwater,process water,or mine&-watering to ground water or surface water.
Thcrc is no discharge of process water or mine dewatering water at this site_ All stommater percolates directly to ground
and does not puddle or flow in a ditch to a collection basin,drywell,drain field or infiltration pond. (Skip the rest of this
section and go on to Section IX.)
OR
1. Accon<panyiuyt this&PPIkgtion,You must provide a sketch map of your site that identlilee each point of discharg r-
Your monitoring plan and sobseegaent monkoring reports to Ecology must be based on the points of discharge
shown on the map you send in.
2. if you discharge to a Surface water body,you must also attach the following information:
♦ An estimate of the minimum width,depth and velocity or flow of the receiving water.
♦ For stormwater discharges.an estimate of the width,depth and velocity or flow of discharge that will occur as a
result of a 24 hour rain event greater than 0.5 inches.
♦ For process water:an estimate of the maximum width,depth and velocity or flow of discharge that will occur.
3. Identify the characteristics of each point of discharge below.Copy this page H necessary to identify additional
discharge points.
Is Monitoring Plan Complete and Up-to-Date? ❑ YES ❑ NO
For each discharge point listed below,mark all boxes that apply to the discharge during any time of the
Discharge Point 1: Name(unique identifier) Qy
Discharge includes�romm Water /� 1
SIC Code(s) 3 Z 7 3 `7,em r,/(.' �ilf L J
❑ Mine Dewatering Water
SIC Code(s)
❑ Stormwater
Discharges to: ❑ Storm Drain System(stormwater only)
Name of system:
Ground
XUnhned collection basin or infiltration pond
❑D+ywell or dtaiafield
❑ Other
❑ Surface water(creek,river,ditch,lake,wetland,or other water body)
Name of receiving water:..._.
Tributary to:
Discharge Point 2: Name(unique identifier)
Discharge includes: ❑Process Water
SIC Code(s)
C] Mine oewatering Water
SIC Code(s)
❑ Stormwater
Discharges to: ❑ Storm Drain System(stormwater only)
Name of system:
❑ Ground
❑Unlined collection basin or infiltration pond
❑Drywall or dtainfield
❑Other
❑ Surface Water(creek,river,ditch,lake,wetland,or other water body)
Name of receiving water:
Tributary to:
07/29/2005 08 : 14 FAX 3802773187 ESA U 005/012
EL BMN.EMPLOYED TO REDUCE POLLUTANTS IN STORMWATER OR PROCESS WAFER DISCHARGES:
Indicate with the following:
S for stormwater P for process Water Mbr stormwater and process water
a. Oil/water separator b. — Management BMPs c. Collection/routing of water
d. Spill prevcotion e. Lined evaporation basins f. Water recycling
g. filtration basins h, Vegetation management i. Containment
j_ Detention facilities k_ Overhead coverage 1/, 1. Chemi Additives(attach NISDS)
m. other(specify) S�inr T?' y
Is the SIOrmwater Polhrtion Prevention Plan Complete and Up-to-Date?❑ YES X NO
Is the Erosm and Sediment Control Plan Complete and Up-to-Date? ❑ YES ,(NO
Is the Spill Plan Complete and Up-to-Date? ❑ YES PCNO
X. OPERATIONS AND PRODUCT MINED OR PRODUCED EACH YEAR:
Does facility operate year round? RYES ❑ NO
If no,indicate months of operation(circle all that apply):Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Other periodic operation- Describe:
Indicate annual quantity of product produced using codes from the instructions for this jinn
MINED PRODUCTS PATMI PLANTS
L Sand 4- Quarry rock 6. Hot Mix Asphalt
2. Send&Grravel 5- Clay 7. Concrete f�
3. Other(specify material and amount) [- WLe.2
XI. CERTIFICATION BY PERMTITEE: R
I certify under penalty-of law that I have personally examined and am familiar With the information submitted in
this application and all attachments and, based on my inquiry of those persons immediately responsible for
obtaining the information contained in the applibation,I believe that the information is true, accurate and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and
imprisonment. l '
jAPriumsoda= hereon zi tting Below
S aae Dec AM1ij",3*=d.
T
NOTE: Federal regulations require this application to be signed as follows: A.) For
corporation, by a principal executive officer of at-least the level of vice president; B.) For a
partnership or sole proprietorship, by a general partner or the,proprietor, respectively; or C.)
For a municipality, State, Federal, or other public facility, by either a principal executive officer
or ranking elected official.
If yore require this document in an alternate format,please contact the Water-Quality Program at 360-407-
6401(Voice) or 711 or 1-800-833-6388(TM.
07/29/2005 08: 14 FAX 3802773187 ESA fa006/012
KURT'S PRECAST—CONCRETE TRUCK WASHOUT AND STORMWATER
MONITORING PLAN
BY: Pat McCullough,PE
7-20-2005
Potential Contaminants: The site will be used for precasting concrete tanks and other
precast concrete parts. The precast work will be accomplished on a 120 foot long by 10
wide concrete slab. Concrete is brought to the site by concrete mixer trucks.There is no
concrete batch plant on site. Quantities of materials are: May through October-, 16 CY of
premixed concrete a day, 5 days a week:November through April, 10 CY of premixed
concrete a day for 5 days a week. Work on site is terminated during heavy rainfall.
There is potential contamination of storm water from the wash down of the delivery shuts
and,other external parts on the concrete trucks and the wash down of the precast forms
and tools. There will be trucks and fork lifts on the site which creates the potential for
fuel and oil spills from heavy equipment.
The trucks will back up to the South end of the precast slab to wash down. The wash
down water will be conveyed to a lined sedimentation pond via the storm water
conveyance piping. The sedimentation pond will be 70 feet long, 10 feet wide at the
bottom, and have 2:1 side slopes. The pond will be lined with a 30 mil PVC pond liner.
6"of gravel will be placed over the liner to protect the bottom. Water depth in the pond
will be 4 feet. The sedimentation pond will overflow to an infiltration pond that is
designed to infiltrate storm water runoff from a 24 hour, 100 year recurrence interval
storm. The native soils will be left in place in the infiltration pond. The storm water will
infiltrate through 3 feet of organic soils(with vegetation) to a hard pan layer.
Potential contaminants: High PH from the cement in the concrete wash down, dissolved
solids from the cement, sand, and gravel used in the concrete mix.
PH of outflow should be above 6.5 and below 8.5.Total Dissolved solids of outflow
should be below 500 mg per liter. Visible Oil Sheen—none.
Monitoring Plan:
Monitor the outflow from the sediment pond:
Measure PH on a monthly basis.
Total Dissolved Solids--monthly basis.
Oil Sheen—daily(Observation)
Report To:
Sherri Greenup, Washington State DOE-SWRO,PO Box 47775, Olympia, WA 98504-
7775. Use forms supplied by WSDOE
Report above parameters Quarterly
07/29/2005 08 : 15 FAX 3802773187 ESA Z007/012
KURT'S PRECAST DEVELOPMENT
DRAINAGE REPORT
By: Pat McCullough, P.E.
ESA Inc.
July 19, 2005
EXISTING CONDITIONS
The project is located north of Belfair Washington, Section 20, Township 23, Range 1 W in Mason County off Log
Yard Road NE. A topography and Vicinity map are included with the submittals. The average grade of the
existing site is approximately 4%. The existing soils are Alderwoo4 Gravelly Sandy Loam per the Mason County
SCS Soils Survey. There is approximately 3 feet of weathered sands and gravels over hard pan. There is no
standing water on the site. The site has been cleared but before the land was cleared the ground cover was small
second growth trees and brush. The soils were classified as Type C.
PROPOSED DEVELOPMENT
The.proposed development consists of clearing and grading, construction of a gravel ingress and egress road, a
piped storm drainage system,a storm water infiltration system, industrial fabrication and lay down area for
concrete precast products, and a new potable water well. At this stage of development of the 4.99 acre site
development will include 0.7 acres of gravel road,0.38 acres of gravel covered,product staging and storage area,
and 0.27 acres of product development area(this area includes a 10' wide by 120' long concrete fabrication pad).
The remainder of the site will be graded and hydroseeded to await future development. Water supply will be by
potable water well on site that has yet to be drilled.
Additional permits will be applied for when development proposals are developed for the remainder of the site.
The site, grading and temporary erosion and sedimentation control drawings are included with this submittal.
DESIGN PARAMETERS
Design Storm
6-rnonth: 2.1 inches, 2 year: 3.5 inches, 10 year: 5.0 inches, and 100 year: 6.5 inches
• The existing onsite soils are Class C soils and were assigned a uniform CN number of 81 with an assumed
time of concentration of 10 minutes.
• Post developed soils were assigned a composite CN number of 89 with a proposed time of concentration of
I0 minutes.
• Post developed storm water will be directed to a piped storm drainage system and then to a 5.5-foot deep
infiltration facility located in the far southern corner of the site (the natural low area). Infiltration will be
through native sandy,gravelly soils with a 12"+top layer of organics that has an infiltration rate of 1-inch
per hour(conservatively estimated). The volume of the drainage basin is such that it will retain the post
developed 100-year storm event for the current development of the site at a pond elevation of 331.91 feet,
or 0.5 feet below the overflow weir. The site of the proposed drainage infiltration pond has been cleared
but will be otherwise left undisturbed so as to optimize water quality treatment by the organic top layer of
soil.
• Most of the post developed storm water will be directed to the infiltration system. Areas not directed to the
facility are considered bypass. The total bypass discharge is less than the allowable 2, 10, and 100-year
predeveloped discharge.
07/29/2005 08 : 15 FAX 3602773187 ESA Z008/012
• Pretreatment will be required in the form of a settling basin. BMP T6.10 was used.The volume of the basin
is 30% of the 6 month storm hydrograph. The water depth of the basin will be 4 feet. The sediment basin
will be lined with a 30 mil PVC pond liner. 6"of gravel will be placed over the pond liner to protect it
during cleaning. The basin is 70 feet long and 10 feet wide with 2:1 side slopes. It will be sealed with
compacted clay soils. The overflow elevation will be 332.0. Discharge elevation will be 229.0.
DOWNSTREAM ALALYSIS
A downstream analysis was not required at this stage of development of the site due to the excessive capacity of
the proposed infiltration facility. The infiltration facility was designed to allow the 100-year storm event to
infiltration into the existing soils.
EROSION CONTROL
Erosion will be controlled during construction by the use of silt fences,construction entrance and if necessary,
sedimentation ponds as required with the State's Best Management Practices. An erosion control drawing is
included with the submittal.
HYDRAULIC COMPUTATIONS
The latest version of the Engenious Systems Storm Shed 20 was used to analyze the existing and proposed
conditions and to size the infiltration facility. The results of the computer analysis are included in this report.
07/29/2005 08: 16 FAX 3GO2773187 ESA Z009/012
w 21 xiNN 1T4a�1� LcFr 0 g��M
HE YGTCK
,14irt�
LrOr 8
0.9' V4xT a i
8a gyp`
Nww
Or ow.
11�/W 1
CRipnoN
4'NtaARY LINE Ap,,J1,JSZirILNT
4LLIME 26 OF SURVEY$ AT � .� •• SW MARMAD
�
iRDIN0 NUMNER 1729721. �' 9 n LOT sa�r.
Wt4 Y, WASMN+GTON. !1 �a:ems
so:
t�rtunr� —OP1;
�r
• _ ° Un44
r ,,� ■ate.
as .04ss 'eta
4.
tr IT
y, Lat a ,
7
07/29/2005 08: 16 FAX 3602773187 ESA 2010/012
All
3.' ag _
li8 ;
cc
pox
LQ
a
— _— le -
� p °OF r
cc
LL
� LQ
o
07/29/2005 08: 17 FAX 3802773187 ESA laO11/012
�a
ll
off
3 �� aft
Oaf a�`� �—� ---.i «'�.•� - ' �i�
o
3 i_....., nrw
A313 Ad SL. `$ ,1\, •�-• .. 1
(?� OD-6- is Nd
„ v
SY'wc 13 Nd -
MK• rah na - - .. ... - �•'i _
Pr
came-A=ea
MEW
9^ I s
07/29/2005 08 : 18 FAX 3602773187 ESA 12012/012
a Eb i � gp °aa p h
sc
44 f
6 Ri
Im PT
I i� fil e I I v ED �
3 i k4_ ESQ % �Q :,�e Q =_ E
.� � . a . ` f
fit
A Ilk
gill
;IP11 NIX
115
b its ■py � :� ; 19
-e��� I
1a f!� � x
at
_ 99 Qp
s� �~ F °t ■ G _ tad
jig
fi
■iI s ll it i�■ 36d a f elk
' � � aIdu %Q�'1. 1 H g
11
�i
gg r
fill
On I Ir�°r �' ��Q �` r eI� p�� � =Q9 sif� �■ �,��Q �e� ° � �.F ��
pi
a� #Yr�l�i
� "� fey=� s� I� � i � # °["i � � �'� f � �f. f� # � � f#� ■�
01
is gi lit f w' 10 _
Id X all,
I- I ;ill
Nib _ � F f� A6y■�� i i1ig" ! • �,
Qp C
f� i�I rgp#
���# Y� i�:ix = � e � E�3 � =a� � �� �i Bf� �� � �E ���� Q■�E= t
111H
�� �