Loading...
HomeMy WebLinkAboutSpecial Inspection Services - BLD Inspections - 5/13/1994 RZAAGRA, Inc. 11335 NE 122nd Way RZA Kirkland, YiiA 9,?034;-6918 i206r 820 1cr;a FAX i206' 4211�0'9432-00 13 May 1994 Strata Communications, Inc. O 3501 Everett Avenue Everett, Washington 98201 Attention: Mr. Chuck Beebe f--fiAy 17 1994 Subject: Final Summary Letter for Special Inspection Services GENERAL SERVICES U.S. West NewVector Group, WA4 BELFAIR Cell Site N.E. 24767 State Hwy. 3 Mason County, Washington Dear Mr. Beebe: As requested by the Mason County Department of General Services,this letter serves as our final summary of special inspection services provided by our firm on the above referenced project. A representative from our firm provided material testing services for the cast-in-place, reinforced concrete foundation for the monopole tower. Based upon our observations and testing, it is our opinion that the cast-in-place, reinforced concrete foundation work was completed in conformance with Mason County approved plans. Our field report No. 1 and compression test report are enclosed for your records. We trust this letter meets your current needs. Please do not hesitate to contact us H you have questions or comments regarding the contents of this letter. Respectfully submitted, RZA AGRA, Inc. thy J. Boyce Staff Engineer A. JO 0 �F WAsx7�G r � r z Thomas A. Jones, E. O� •P�, 4 �.q 4w Project Geotechnical Engin r +s7g' `QI�NAL Ell Enclosures: Field Report #1 1EXPIRES 4/27/95 Compression Test Report TJB/TAJ/taj cc: U.S. West NewVector Group, Inc. - Marion Makita Mason County Dept. of General Services - Christine Herth AGRA Earth&Environmental Group 1 Materials Department RZA AGRA, Inc. Daily Field Report Field Report No. Project Name l/� S• k/�Sr / 1A�8 Ar�2 -'04d 2 Job No. //- �Y3oZ-00 Location A16 Date 9 y S S M T vG Arrival Time /-7� Page // of / client/Owner Client's Rep. 12'7/,,4t'4 61440 Contractor 3-)�?ij:7A e'Dri oyAJ1d,4y7O,)S Contractor's Rep. AW— 6t2g�N ,4mV: c,•r✓«t ECG RZA Field Rep. Job Phone No. _7.3&, RZA Office Contact �/I') �5 Weather Coop -a Material Type: -5 '� ' �� Material Supplier �o �r�G Requirement (psi) 7_SD6 Delivery Ticket No. 6a759 Cement Content (sk) 41 Truck No. Placement Time 1320 Mix No. itkuV_ _57,07ZIO Ambient Temperature (F) '9�5' Mix Proportions: Material Temp (F) 6�2° � Cement (Ib/cy) Slump (in) / Water (Ib/cy) s.'p Air Content Fine Aggregate (lb/cy) Water/Cement Ratio Coarse Aggregate (lb/cy) Sample Size e � 3el2- r �'`/� Admixture (oz/cy) Amount of Material Placed 9 CV Admixture (oz/cy) Field Specimen Numbers 14 B c Admixture (oz/cy) Test Age (days) Comments & Locations i'///14o oc/ 5172—_- /{> C'4 UEAll /1,�Qr/fST 7U z.�JS�r'T R�sr�FL /'fl-,Z )QsJo , S.4 nxp/_e se CO3VrR ,- - l!Y 9 C y ��/4s�firlf r/T", L a,yn�Er� sG�.nP i�rAS i�t�• Ki4S7- �'Gr�G� . �� �f S ra.,' �. rf5 � �� f�/,•�^c v�� AU.¢�v,S, l In our opinion.all items inspected are in conformance with the approved plans and specifications.Yes +/ or No RZA AGRA Field Relp ��•�� Contractor's Rep Reviewed by. s ❑Continued KWF 070-61REV.11/93) 11335 NE 122nd Way Suite 100 Kirkland, WA 98034-6918 RZA AGRA, Inc. COMPRESSION TEST REPORT (206) 820-4669 FAX: 821-3914 STRATA COMMUNICATIONS, INC. Date: 2/10/94 3501 EVERETT AVE. Job No.: 11-9432 EVERETT, WA 98201 Project: WA 4 BELFAIR TOWER Attention: CHUCK BEEBE FIELD REPORT #1 FIELD DATA Contractor: STRATA COMMUNICATIONS Material Supplier: FRED HILL Material Type: CONCRETE Delivery Ticket No. 02758 Requirement (psi) 2500/28 DAY Truck No. 66 Cement Content (sk) 6 Mix Number: N/A Placement Date &Time: 1:30 P.M. Mix Proportions Ambient Temperature CF) 45 Cement Content (lb/cy) 5075 Material Temp CF) 62 Water (Ib/cy) 130 GALLONS Slump (in) 6" Fine Aggregate (Ib/cy) 13260 -5.7% MOISTURE Air Content (%) N/A Coarse Aggregate (lb/cy) 16530 (1.5" MAX) Water/Cement Ratio: .36 Admixture (oz/cy) MICRO AIR 36oz. Size of Samples: 6X12 CYLINDERS Admixture (oz/cy) N/A Amount of Material Placed: 9 CY Admixture (oz/cy) N/A LABORATORY DATA Test Date Laboratory Field Test Age Test Load Specimen Area Compressive Specimen Specimen (days) (Ibs) (sq.in.) Strength (psi) Number Number 2/17/94 780 1 7 96900 28.27 3427 3/10/94 781 2 28 146160 28.27 5170 3/10/94 782 3 28 142530 28.27 5042 HOLD 783 4 HOLD N/A 28.27 N/A SPECIFICATIONS 28 DAY 2500/psi Remarks: 7 DAY BREAK EXCEEDED 28 DAY STRENGTH REQUIREMENTS. 28 DAY BREAKS ALSO EXCEEDED 28 DAY STRENGTH REQUIREMENTS. Project Engineer m Jones cc: