Loading...
HomeMy WebLinkAboutStormwater Management - COM Letters / Memos - 4/20/1994 GARY YANDO,DIRECTOR Py�N.STgT�O c A o u DEPARTMENT OF COMMUNITY DEVELOPMENT _ r a T z PLANNING-SOLID WASTE.-UTILITIES z� N Y y BLDG.III • 426 W.CEDAR• P.O.BOX 1864 578 SHELTON,WA 98584 • (206)427=9670 - April 20, 1994 Cascade Floral Products PO Box 1299 Belfair, WA 98528 Please reference the accompanying enclosed document regarding stormwater management. We are unable to further process your building permit application until we receive the information requested. t' Respec�tfull anassee, Planner ZJ�Dlnartment of Community Development c: Me Recycled GARY YANDO,DMECTOR PyON.STgTFo o A° N u DEPARTMENT OF COMMUNITY DEVELOPMENT o T i PLANNING-SOLID WASTE-UTI11=S i� N Y y BLDG.III •_426 W.CEDAR • P.O.BOX 578 of 1864 `'o SHELTON;WA 98584 • (206)427-9670' STORMWATER MANAGE TENT GUIDELINES Mason County,requires development of this type to meet the following minimum standards for the management of storm water: 4.2 Runoff Quantity ; All proposed projects must provide runoff quantity controls to achieve the,following three purposes unless exempted because of direct..discharge to a regional facility or a:major body of water or because of negligible increase in runoff( see 4.2.1, below) 1. Infiltrate at least the excess runoff volume generated by the proposed development for the 2-year , 24-hour design storm, provided that site conditions are appropriate and ground water quality will not be impaired. Release any residual runoff from the 2-year, 24-hour design storm at no greater than 100% of the peak runoff rate for that storm for ` existing site conditions. 2. If infiltration is precluded because of site conditions then detain and release runoff from the 2-year,24-hour design storm at no greater than 50% of the peak runoff rate for pre- existing site conditions. 3. Detain and release runoff from the 10 and 100-year, 24-hour design storm at no greater than 100% of the peak rate for existing site conditions. Your submitted drainage report should-include at a minimum, a site plan showing topographic lines, facility design and supporting calculations. All site preparation .should be done in accordance with Best Management Practices as outlined in the Stormwater Management Manual for the Puget Sound Basin. If you have specific questions about stormwater facility design please contact Alan Tahja of the Mason County Public Works Department. Please submit your plans to the address below, ATTN J. Manassee. i Recycled