Loading...
HomeMy WebLinkAboutBLD9004 Final Replace Pier, Ramp and Float - BLD Permit / Conditions - 12/19/1980 Allen, Dave F. (Duplicate) #9004 11-19-80 •6 mi. West of Allen, turn left for 3.2 mi. to Cronquest Road, turn left, approx. .4 mi. Gov. Lot 2, Parcel 2 32-22-1 St. Rt. 1, Box 247 - Allyn Replace Pier, Ramp & Float as per Corps Permit $16,000.00 a s 3 ` 1 oK �� 4 _ _ G'; BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 426-5593 DATE ISSUED 11 157-�� PERMIT NO. v 0 OWNER NAME MAIL ADDRESS lcwCITY 8 ST ZIP PHONE DIRECTIONS e TO JOB SITE , LEGAL Q� (❑SEE ATTACHE HEET) DESCR. �L. o- ��C.t�e, • ' a —� NAME MAIL ADDRESS I 3 STATE LICENSE NO. PHONE CONTRACTOR fl c 7 G USE OF r BUILDING Class of work: ❑ NEW ❑ ADDITION ❑ ALTERATION Ot REPAIR ❑ MOVE ❑ REMOVE Describe work: IV Q.rr.t. Valuation of work: $ PLAN CHECK FEE PERMIT FEE si SPECIAL CONDITIONS: BEDROOMS DECKS CARPORT ❑ NOTICE BATHROOMS TOTAL SO. FT. GARAGE ❑ SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING NO. OF STORIES BASEMENT ❑ ATTACHED ❑ OR AIR CONDITIONING. TOTAL SO. FT. FIREPLACE ❑ DETACHED ❑ THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHOR- CONTRACTOR AFFIDAVIT IZED IS NOT COMMENCED WITHIN 180 DAYS,OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER I certify that I am a currently registered contractor in WORK IS COMMENCED. the State of Washington and I the aware of the FOR OFFICE USE ONLY ordinance requirements regulating the work for which the permit is issued and all work done will be in conformance therewith. PERMANENT ❑ SHORELINES ❑ �-1 n SEASONAL ElFLOODPLAIN ❑ Firm _ E.D. NO. S.E.P.A. ❑ C' Special Approvals IN OUT YES APPROVED NO By Lic. No.�r A -/AA=OM- �1I�D "Date �- 5"4f0 ZONING PLANNING DEPT. HEALTH DEPT. OWNERS AFFIDAVIT PUBLIC WORKS I certify that I am exempt from the requirements of the FIRE MARSHAL contract or registration law RCW 18.27, and am aware BUILDING DEPT. (, Q of the Mason County ordinance requirements for 042�_7 /which this permit is issued and that all work done will ROAD ACCESS be in conformance therewith. MOTPj VEHICLE PERMIT APPL TION ACC"By PLANS CHECK BY APPROVED FOR ISSUANCE Owner Date, lcnu BY PI AN CHECK VALIDATION CK.. M.O. CASH PERMIT VALIDATION CK. M.O. CASH