Loading...
HomeMy WebLinkAboutAccess Connection M93-195 - RAP Letters / Memos - 12/2/1993 w Washington State Special. Provisions for - Department of Transportation Highway Encroachments Permit No. M93-195 Applicable provisions are denoted by (X) No work provided for herein shall be performed until the Grantee is authorized by the following Department representative: Marvin (Casey) McGill Area Maintenance Superintendent 8293 Spring Creek Road, Port Orchard, Washington 98366-9613 Phone: (206) 895-4753 U 2. Prior to the beginning of construction,a preconstruction conference shall be held at which the Department and the Grantee and Grantee's engineer,contractor, and inspector shall be present. U 3. Should the Grantee choose to perform the work outlined herein with other than its own forces,a representative of the Grantee shall be present at all times unless otherwise agreed to by the District representative.All contact between the Department and the Grantee's contractor shall be through the representative of the Grantee.Where the Grantee chooses to perform the work with its own forces,it may elect to appoint one of its own employees engaged in the construction as its representative. Failure to comply with this provision shall be grounds for restricting any further work by the Grantee within the State right of way until said requirement is met.The Grantee,at its own expense, shall adequately police and supervise all work on the above described project by itself,its contractor,subcontractor,agent,and others,so as not to endanger or injure any person or property. a 4. A copy of the permit must be on the job site and protected from the elements at all times during any of the construction authorized by said permit. L 5. This permit does not give the Grantee or any agent or contractor of the Grantee any rights to cut, spray, retard, remove, destroy,damage,disfigure or in anyway modify the physical condition of any vegetative material located on the highway right of way, except by written permission from the Department or for purposes as described by No. 6 if denoted below. All restoration shall be done to the satisfaction of the Department at the sole expense of the Grantee. 6. If necessary to increase sight distance,brush shall be removed from both sides of the access connection and stumps shall be removed. The indiscriminate cutting of merchantable timber or disfiguring of any feature of scenic value shall not be permitted. 7. The access connection(s)shall be constructed in accordance with the attached Sufficient length of -inch diameter culvert pipe shall be placed in ditch and laid to a true line and grade.The access connection(s)shall be surfaced to the limits as shown on the plan with a 6-inch minimum compacted depth of gravel base material and a 3-inch compacted depth of crushed surfacing top course.Asphalt paving will not be required. Finished grade of the access connection shall be in accordance with the profile control as shown on the attached plan.Directing of surface water from private property to Department right of way will not be permitted, unless otherwise approved by the Department. IX 8. The access connection(s)shall be constructed in accordance with the attached Type "D" Plate (Modified) Sufficient length of 18 -inch diameter culvert pipe shall be placed in ditch and laid to a true line and grade.The access connection(s)shall be surfaced to the limits as shown on the plan with a 6-inch minimum compacted depth of gravel base material a 3-inch minimum compacted depth of crushed surfacing top course and paved with a 3-inch minimum -.-compacted depth of Asphaltic Concrete Class B unless otherwise specified by the Department. Any existing oil mat on shoulder or roadway shall be removed and new pavement laid to a butt joint with existing pavement.Finished grade of new pavement shall be in accordance with the profile control as shown on attached plan.Directing of surface water from private property onto Department right of way will not be permitted, unless otherwise approved by the Department. U 9. All buildings and appurtenances shall be so located at a distance from the right of way line of any State Highway that none of the right of way therefore is required for use of the patrons or customers of any such establishment.Grantee shall comply with local building codes.Set-back requirements for the location of buildings in relation to the right of way line are a function of local authorities, and they should be consulted regarding requirements that must be adhered to. DOT Forth 224-713X Page t Exhibit "A" Revised 9192 f �J 10. The Grantee agrees to schedule the work herein referred to and perform said work in such a manner as not to delay the Department's contractor in the performance of his contract. , R 11. Work within the right of way shall be restricted to between the hours of 8:30AM and 4:30PM ,and no work shall be allowed on the right of way Saturday,Sunday,or holidays,unless authorized by the Department.Any lane closures must be submitted for approval in advance of use. The hours of permitted closure may differ from the above noted hours. $1 12. The shoulders,where disturbed,shall be surfaced with crushed surfacing top course three -inch minimum compacted depth,or as directed by the Department.The surface of the finished shoulder shall slope down from the edge of pavement at the rate of 1/2 inch per foot unless otherwise directed.The restored shoulder must not have any strips or sections less than 2 feet wide.The restored shoulder shall be surfaced with aVlWt concrete pavement. )gl 13. The Grantee shall be responsible for constructing and maintaining the access connection(s)and appurtenances between the shoulder line of the highway and the right of way line inclusive of surfacing and drainage.The Department has the right to inspect all installations at the time of construction and at any time afterward and to require that necessary changes and repairs be made. Unsatisfactory work will be corrected by the Department, at the Grantee's expense, or access may be removed at the Grantee's expense.Directing of surface water from private property onto Department right of way will not be permitted. �I 14. The access connection shall be sufficiently surfaced back an adequate distance from the edge of the pavement to prevent any tracking of material onto the highway.Any tracking of material onto the highway shall be subject to enforcement of Chapter 46.61.655 RCW and shall be immediately cleaned up by the Grantee or the Grantee's agent. ❑ 15. Standard highway warning signs designated as "Truck Crossing"sign, plate W11-6, shall be placed and maintained at Grantee's expense on each side of the access connection.Signs shall be in evidence only when access is actually being used. If necessary,flagmen shall be provided.Sufficient parking space shall be provided by the Grantee outside Department right of way so no vehicles will be parked on said right of way. X 16. All manholes,valve covers,and like appurtenances shall be constructed at such an elevation to conform to the shoulder slope from the edge of pavement or as directed by the Department. lK 17. All slopes, slope treatment,top soil, ditches,pipes,etc.,disturbed by this operation shall be restored to their original cross section and condition. All hazards shall be marked by warning signs,barricades,and lights. If necessary,flagmen shall be employed for the purpose of protecting the traveling public. Roadside operations shall be specified by the Department's representative. 18. During the construction and/or maintenance of this facility, the Grantee shall comply with the Manual on Uniform Traffic Control Devices for Streets and Highways. If determined necessary by the Department,the Grantee shall submit a signing and traffic control plan to the Department's representative for approval prior to construction or maintenance operations. ❑ 19. Bond coverage requiredto ensure proper compliance with allterms and conditions of said permitwill befurnished by a Blanket Surety Bond held at Headquarters in Olympia. Ikj 20. A surety bond in the amount of$ 10,000.00 written by a surety company authorized to do business in the State of Washington,shall be furnished to ensure compliance with any and all of the terms and conditions of this permit and shall remain in force until all work under this permit has been completed and approved by the Department. I� 21. Relative to advertising adjacent to all State highways,we wish to call your attention to the Scenic Vistas Act of 1971,Chapter 47.42 RCW and State Transportation Commission ruling Chapter 468-66 WAC.Violation of this section of the statutes will be sufficient cause for cancellation of this permit. On-premise signs are allowed. 22. The Grantee shall notify the Department's representative upon completion of the work under this permit so that a final inspection can be made. ;S 23. No lane closures shall be allowed except as approved by the Department representative.Approvals may cause revision of special provisions, including hours of operation. K 24. The responsibility of the Grantee for proper performance,safe conduct,and adequate policing and supervision of the project shall not be lessened or otherwise affected by Department approval of plans,specifications,or work,or by the presence at the work site of Department representatives,or by compliance by the Grantee with any requests or recommendations made by such representatives. '5d 25. All material and workmanship shall conform to the Washington State Department of Transportation Standard Specifications for Road, Bridge and Municipal Construction, current edition, and shall be subject to inspection by the Department. ADDITIONAL "SPECIAL PROVISIONS" SEEPAGE 3. DOT Forth 224.713X Revised 9192 Page 2 Exhibit "A" a M93-195 Page 3 of 3 Bob Linhart 345 Andover Park East Tukwila, WA 98188 Special Provisions (Continued) X 26. Any future development of this property or change in land use will require review and approval by both WSDOT and Mason County for adequacy of this approach for the intended use. X 27. The Grantee is responsible for all coordination, work, and expenses associated with any utility relocation and any service connection fee. X 28. There will be no advertising signs or billboards erected within the state right-of-way. Any proposed landscaping or fencing within the Department's right-of-way must not infringe on the sight distance or the roadside clear zone. The disturbed area within the Department's right-of- way shall be contoured, graded, seeded, fertilized, planted, and mulched at the Grantee expense to reduce erosion and problems with surface drainage. X 29. This access shall be constructed to meet the modified type "D" road approach standards (See attached Plate). The construction of this approach shall be as close to a 90 degree angle as possible so as to provide optimum sight distance in both directions. The slope from the edge of pavement, out to the centerline of the culvert plus a foot shall be constructed at a minus 0.05 feet/foot down and away from the highway. The culvert shall be laid to the true flow line and have beveled end sections added. For a culvert pipe in excess of 50 linear feet a "Type 1L Catch Basin" will be installed within the ditch flow line connecting the culvert pipes at a location specified by WSDOT Maintenance. Please review the type "D" templates for details. X 30. Special care should be taken during the reconstruction and upgrade of this approach to insure that water from this approach or paved area will not flow onto SR 3. Any problems created by surface water runoff directed toward the state highway must be alleviated at the Grantee's expense. X 31. Asphalt paving of this access shall be extended from the shoulder line of SR 3 out to the right- of-way line at the Grantee's expense. All materials used within the state right-of-way shall be to WSDOT standards. X 32. The Grantee is responsible for obtaining a construction permit and all other pertinent permits from Mason County or other agencies, if applicable, prior to beginning work. X 33. The Grantee shall use the approved traffic control plans as provided in Exhibit "C". It is the Grantee's responsibility to provide adequate traffic control and protection to ensure the safety of the traveling public, all personnel, and equipment, working within the state right-of-way. If necessary, the Grantee shall provide certified flaggers for the purpose of protecting the traveling public. X 34. The Grantee will notify the Department's representative 2 normal working days in advance of scheduled work within the state right-of-way. X 35. Bonding will be held on this approach until all work is completed to the satisfaction of the Department. X 36. The proposed change in use and upgrade of this existing road approach will be registered by this permit when completed. X 37. The contractor will be responsible for obtaining their own liability coverage while working within the right-of-way of the state highway. X 38. The Grantee will clear the brush, small trees, branches, and undergrowth, to the Southwest of the new approach, to improve sight distance. 1 Y • Washington State District 3 Headquarters Department of Transportation 5720 Capitol Boulevard,Tumwater P.O. Box 47440 Duane Berentson Olympia,WA 98504-7440 Secretary of Transportation December 2, 1993 (206)357-2600 Fax(206)357-2601 Little Deli-Mart 345 Andover Park East Tukwila, WA 98188 Attention: Bob Linhart , Y� Phone: (206) 575-3401 SR 3 C.S. 2305 DEC D 6 tg43 Access Connection Permit A4S4N CO. PL iNt; pCpr M93-195 "D" / 26.51 Right M93-196 "D" / 26.54 Right E.C. File #93224 - M Dear Mr. Linhart: Attached are your executed original Access Connection Permits allowing you to perform the indicated work within the state highway right-of-way. The bonding requirement of these permits is satisfied by a $10,000.00 bond from "Houston General Insurance Company of Fort Worth TX., and shall remain in affect until all work under both permits has been completed and approved by the Department. Before beginning work on these approaches, please contact both the Area Maintenance Superintendent and the Utility Underground Locate Center to advise them of your planned work, starting date, and location. The Area Maintenance Superintendent's phone number is on front of the Special Provision page, and the Utility Underground Locate Center phone number is 1-800-424-5555. No work is authorized within the state highway right-of-way until this notice is given. Upon completion of these approaches the Grantee will need to make a written request for inspection and release of bond as provided under Special Provision No. 22 to the Area Maintenance Superintendent. It is your responsibility to provide any release of bond forms required by the "Houston General Insurance Company". Sincerely DAVID B. HILDERBRANT P.E. Assistant Transportation Planning Engineer DBH TLS =&-_ Mason County cc: M. McGill Aft Washin t State -u on �yd 9 District 3 Headquarters vom Department of Transportation 5720 Capitol Boulevard,Tumwater Duane Berentson P.O. Box 47440 Secretary of Transportation rJ + 1p� VGE9lympia.WA 98504-7440 L,J—1 �s (206)357-2600 Fax(206)357-2601 July 30, 1993 Mr. Gary Yando Director of Community Development P.O. Box 578 Shelton, WA 98584 SR 3 MP 26.51, Right Vicinity ARCO AM/PM - MDNS E.C. File No. 93244-M o: We have reviewed the Mitigated Determination of Nonsignificance (MDNS) for the above proposal and we offer the following comments: The proponent has applied for an access connection permit from the WSDOT. We are currently reviewing this application and we have requested a more detailed traffic analysis report from the proponent, for determining what potential impacts this development may have on the state highway system. The drainage plans as submitted by the developer, will increase the runoff for the 10 year and 100 year storms. We request the developer resubmit the drainage plans, and address onsite detention for these storm events. The existing drainage system along State Route 3 is not able to accommodate increased flows. The Department will not be responsible for noise attenuation if the subject property experience noise levels in excess of the maximum allowed for the proposed land use. Advertising signs visible from an adjacent State Highway must comply with the State Scenic Vistas Act of 1971, which is administered by the Department. For information regarding the signing regulations, contact Jack Smith in the District 3 Traffic Operations office at (206) 357-2667. Thank you for the opportunity to review the MDNS for the above proposal. If there are any.questions regarding our comments, please contact Rick Mowlds at (206) 357- 2667. Since ly, VIX,,PASCO BAKO , II, P.E. Assistant Transportation Planning Engineer PB/RM cc: J. Manassee / Mason Co. DCD / P.O. Box 578 / Shelton, WA 98584 C. Herth / Mason Co. DHS / P.O. Box 186 / Shelton, WA 98584 B. Lenhart / Little Deli Mart / 345 Andover E. / Tukwila, WA 98128 B. Saling / PCS / 10020 Main St. Ste. 114 / Bellevue, WA 98004 J. Schultz M. McGill 93244M 1.DOC S7*Ar, � GARY YANDO,DIRECTOR } s°o _ DEPARTMENT OF COMMUNITY DEVELOPMENT N Y 0 PLANNING-SOLID WASTE-UTILITIES of BLDG. III • 426 W. CEDAR • P.O. BOX 578 1864 SHELTON, WA 98584 • (206)427-9670 July 14, 1993 Washington State Department of Transportation Rick Mowlds P.O. Box 47440 Olympia, WA 98504-7440 RE: Application for access/building permit application. Dear Rick: The enclosed commercial project is found to border on a State of Washington road or right-of- way and is submitted for your review and comment on access, drainage and setbacks. APPLICANT: Robert Lenhart/Bob Saling/Little Deli Mart PROJECT: Proposed construction of gas station and mini-market; ARCO,AM/PM LOCATION: NE 23880 Highway 3, Belfair. East side. ACCESS: SR 3 ADDITIONAL INFORMATION: Page 2 of the Drainage and Infiltration plan are enclosed. Your comments and recommendation are requested by August 6, 1993. If you have questions regarding the information provided please contact Jason Manassee at (206) 427-9670, ext.295. Please send your response to : Mason County Department of Community Development PO Box 578 Shelton, WA 98584 Sincerely J. anassee, Planner epartment of Community Development encl. Recycled _ Of1 State District 3 Headquarters Washln9t 5720 Capitol Boulevard. Tumwater pernent of hansportation F.O. Box 47440 Duane 9erentsua Olympia. WA 98504-7440 Secretary of Transportation (206)357-2600 Fax(206)357-2601 May 11, 1993 Mr. Paul S..Jensen Attorney At Law P. 0. Box 296 Belfair, WA 98528 Fie: SR 3 MP 26.5 Vicinity of SR 300, Belfair Proposed Convenience Store Dear Mr. Jensen: Thank you for your recent letter in which you expressed your concerns about the proposed construction of a convenience store adjacent to State Route (SR) 3 in Belfair. Although this proposed project is located next to a state highway, we are not in a position to either approve or disapprove this development. That decision is determined by the local city or county in which the proposed development is located. In this case Mason County is the lead governmental agency that will make that decision. The Department's responsibility, in conjunction with the State Environmental Policy Act (SEPA) review process, is to make sure a proposed development adequately mitigates any adverse impacts it may cause to the state highway system. Items we typically review are the traffic impacts the development may generate, such as the need for channelization or frontage type improvements. We also look at non-transportation impacts such as the effect the development would have on our drainage system. At this time we have not completed an in-depth review on this development since we have yet to receive from Mason County the SEPA environmental checklist for this development. When we receive the checklist we will then begin our in-depth review on this development. Thank you for the opportunity to address your concerns. Should you wish to discuss this matter further please contact Ms. Paula Hammond, Transportation Plan mg Engee (206) 357-2630. Sincere y, T , GARY MICH Distri Administrator `Enp GM:taj DCS _.... Er4V. .3 Coord. cc: Paula Hammond i 2F'i1 DCT,DI.e,TF- •?, H a }1 District 3 S H.i.ti rah t i ,for n State �iiiC9^f�iss. c r,Cm r ;f�?Or f Trans ortation ' :)epartrriertit o A ���o yap+;o;B��E�v�� P.C. Box Duane Borentson Olympia.'L�rh a8pa-71-;U "t:'r.f,t T'ana�C.fi2lla� April 23, 1993 Bob Saling Permit Consulting Services 5Cj15 Lake Washington Blvd, Iv, Renton, WA 9905 SR 3 11T 26.5;, Right Vicinity Proposed ASS/P141 Mini Market Road Approach Request 't • Ir Dean'Mr. Saling: .fit this t;me we are unable to gr�rlt your request thiark trmit t t abav mentioned locial 'Ype ation. , "D" road approach.to serve a proposed A111iPA2 _ First, we must review any proposed commerce development through:the Mason County Department of Community Development. The of these after tan receiving e such nathe a p as lan :ot�a5p proposed developrrtent such as years, will send us a copy P rJrtC..: ' analysts report, drainage concerns, and which these fac-toars may affect the state' , z� hy „ \ system. We then submit back to the county our recommendations and,requirements specific Project. p Secondly, the D ;3, ,tent of Transportation desires to provide safe access to the gate highway ,,• o er'atin conditions that adequately serve the general zYiotorin4 public : s ��ent along with p g Yc-'�r proposed location of the type `"D^`l road�pWSDOT a Sigta than adequate Wegr�Ire�'4 C `yoking southwest, for regressing -vehicles, P 4 kinuzxi south Sit feet of sight distance, looking southwest, for a Passenger/ Single `Unit. W ysign ; vehicle, your proposed location has only 250 ;mot of sight'distanc the In thi reqaired s case ight ii'St; proposedl access, we recommend your access be relocated to obtain needed, a site plan ss, please include in your submittal to the County To help expedite this grace to rest of your propel, with drainage plans <rid shoeing the relationship of the r�., A approachv� g what impacts t"ixs supporting calculations, and submit a traffic a�oalysis report for det�, �®mplet�i �;�.d commercial development will have an State Route 3. These submittal must be stamped by a licensed professional engineer, We will hold your nc application in abeyae Uunt ou Submitted your plans to the C;�uuty and the joint review has been accomplished, y Thank you for the: opportunity to review this proposal., If there are any questions regarding our comments, Tease contact Rick Mowlds at (206) 357-2667, Sincerely, Po •it-or and fax transmittal memo PAUL.A J. HANSZOND, P.E. { win! G Trap ortatia P Engineer phone.. ept, Fax By: PASCO BAKOTICHl II , _ 94Z5 .E• gin der Assistant p n Pan g PJCH/PB/RM DCD / P.O. Box 57$ J Shelton, 'NA 9$584 cc; a Yando J Mason County Christian Herth / Mason County DRS l P.O. Box 1666 ! Shelton, �4'A 98584 ` r M,.McQi11 s< ` y appp \ 1 V t f F •'A � ��� q R �p( UI' y,,�yyyy, „•,c , -UrioA1..aYV'.,Y..0.E.YRYSW... t.'if w •.'mf{'r'�i�. 11 ik. a'!,r{-.bR,fr ♦. JOHN SPELLMAN DUANE BERENT S()N Governor Secretary STATE OF WASHINGTON DEPARTMENT OF TRANSPORTATION Office of District Administrator • 5720 Capitol Blvd.,KT-11, Tumwater, Washington • P.O.Box 9327, Olympia, Washington 98504 August 7, 1984 E 0 E W E n Don Fawver, Assistant Director AUG 14 1984 Mason County Department of General Services P. Box 186 Shelton, WA 98584 _______ �FNERAL SERVICES "tC. . 26.51 Rt.- unko (DON CADY) Road-Approach E. le No. 4267-M-23 Dear Mr. Fawver: We have received your request for review of the above proposal . We offer the fol- lowing comments: The proponent has made application for a road approach permit and we will grant one access point to SR 3 from the proposal . A copy of the applica- tion is attached. Additional surface water runoff generated by development of the property must not be directed onto the State highway right-of-way. The Department will not be responsible for noise attenuation if the sub- ject property experiences noise levels in excess of the maximum allowed for the proposed land use. / Advertising signs visible from an adjacent State highway must comply with the State Scenic Vistas Act of 1971 , which is administered by the Depart- ment. For information regarding the signing regulations, contact the District 3 Traffic Operations office at 753-7221 . Please provide the applicant with a copy of these comments. Thank you for the opportunity to review the proposal . If there are any questions regarding our comments, please contact the District 3 Environmental Coordinator at 753-9620. Sincerely, RWD/bjr OA , P.E. RLA/RAB Distric ocation Engineer Attachments cc: Vanderpool-Maint. Div. II 3 i �AdIft Washington State District 3 Headquarters VI/ Department of Transportation 5720 Capitol Boulevard,Tumwater P.O. Box 47440 Duane Berentson Olympia,WA 98504-7440 Secretary of Transportation1 (206)357-2600 1 VED Fax(206)357-2601 September 3, 1993 S E P Q 7 �gg3 MASOrq (0. PLANNING DEPT. Mr. Paul S. Jensen Attorney At Law P.O. Box 296 Belfair, WA 98528 SR 3 MP 26.51, Right Vicinity Proposed Convenience Store E.C. File No. 93224-M Dears ensen: We have received your latest letter regarding the proposed construction of a convenience store in the vicinity of intersection of State Route 3 and State Route 300. We understand the concerns of the citizens which you represent and we appreciate you making us aware of their concerns. However, I must reiterate what our District Administrator, Gary Demich, stated in his previous letter to you dated May 11, 1993. Since this proposed project is adjacent to a state highway, we are not in a position to either approve or disapprove this develop- ment. That decision is determined by Mason County, the lead government agency in this case. I have enclosed a copy of a letter from Mr. Demich for your records. The Department of Transportation still has certain responsibilities, in determining if this proposed development will have any adverse impacts on the state highway system through the State Environmental Policy Act (SEPA) review process. We have had the opportunity to review the Mitigated Determination of Nonsignificance (MDNS) for this development and have responded to Mason County. In our response, we requested the developer to submit a detailed traffic analysis report and drainage plans for our review. Currently, we are reviewing the traffic analysis report and will be making a deter- mination on what mitigated frontage improvements are needed and will determine access control for this development. Additionally, we are reviewing the drainage plans for this development, in order to determine if the developer is adequately addressing storm water detention and storm water quality. Thank you again for passing on your concerns. If you have any additional questions or comments, please contact Rick Mowlds of my staff at (206) 357-2667. Sincerely, 'relMMOND, P.E. tation Planning Engineer Attach. PJCH/RM cc: Gary Yando / Mason Co. DCD / P.O. Box 578 / Shelton, WA 98584 93244M2.130C Washington State Department of Transportation Access Connection Permit cs 2305 SR 3 Permit No. M93-195 District No. 3 Name and Address of Applicant: Qua 1 '3 Little Deli-Mart -� c/o Bob Linhart 345 Andover Park East Tukwila, WA 98188 Phone: (206) 575-3401 The Applicant, hereinafter referred to as the "Grantee,"having applied for a permit to remove an existing approach; construct, upgrade, use and maintain, within the state right-of-way, a modified Type "D" mad approach to serve a convenient mini-mart gas station facility and a parking area only, at Mile Post 26.51, right side, located in the Northeast 1/4 of the Southeast 1/4 of Section 29, Township 23 North, Range 1 West, W.M., on a portion of State Route No. 3 in Mason County,Washington,the Washington State Department of Transportation or its designee, hereinafter referred to as the "Department," hereby orders that this permit be granted, subject to the terms and provisions stated upon the reverse hereof and Exhibits attached hereto and by this reference made a part hereof: Exhibit "A"— Special Provisions for Highway Encroachments, Pages 1, 2 & 3 Exhibit "B". Right-of-way sheet and site plan showing access point. Pages 1, 2, & 3 Exhibit "C". Traffic Control Plans. Pages 1 & 2 NOTE: The Grantee is responsible for compliance with all federal, state, and local laws pertaining to the discharge received by the state under this permit. This permit shall be void unless the construction herein contemplated is started within 90 days of issuance and completed within 120 days of issuance, unless otherwise provided herein. November 30, 1994 This permit is accepted and approved by the Grantee subject to the terms and provisions as herein set forth. GRANTEE DEPARTMENT OF TRANSPORTATION By: By: Title: Title:Assistant Transportation Planning Engineer Date: Date of Issuance: �? DOT Form 224-005X(front) 7/92 General Provisions t 1. The Grantee,its successors and assigns,agrees to protect the State of Washington,its officers and employees and save them harmless from all claims, actions or damages of every kind and description which may accrue to or be suffered by any person,persons,or property by reason of the acts or r omissions of the Grantee,its assigns,agents,contractors,licensees,employees or any person whomsoever,in connection with Grantee's,its assigns', agents',contractors',licensees'or employees'construction,installation,maintenance,operation,useoroccupancyof the rightof way orin the exercise of this permit. In case any suit or action is brought against the State of Washington,its officers and employees,arising out of or by reason of any of the above causes,the Grantee,its successors or assigns will,upon notice of such action,defend the same at its sole cost and expense and satisfy any judgement against the State of Washington,its officers,or employees: PROVIDED,that rf the claims or damages are caused by or result from the concurrent negligence of(a)the State of Washington's agents or employees and(b)the Grantee or Grantee's agents oremployees,this indemnity provision shall be valid and enforceable only to the extent of the negligence of the Grantee or the Grantee's agents or employees. The Grantee,and on behalf of its assigns,agents,licensees,contractors and employees agrees to waive any claims for losses,expenses,damages or lost revenues incurred by it or its agents, contractors, licensees,employees or customers in connection with Grantee's, its assigns',agents', contractors',licensees'or employees'construction,installation,maintenance,operation,use or occupancy of the right of way or in the exercise of this permit against the State of Washington,its agents or employees except the reasonable costs of repair to property resulting from the negligent injury or damage to Grantee's property by the State of Washington,its agents,contractors or employees. 2. During the progress of the work,such barriers shall be erected and maintained as may be necessary or as may be directed for the protection of the traveling public;the barriers shall be properly lighted at night. 3. Except as herein authorized,no excavation shall be made or obstacle placed within the limits of the State highway in such a manner as to interfere with the travel over said road. 4. If the work done under this permit interferes in any way with the drainage of the State highway,the Grantee shall wholly and at its own expense make such provision as the Department may direct to take care of said drainage. 5. On completion of said work herein contemplated,all rubbish and debris shall be immediately removed and the roadway and roadside shall be left neat and presentable and satisfactory to the Department. 6. The cost of construction or modification of a connection shall be the responsibility of the Grantee,including the cost of modification of any connection required as a result of changes in property site use in accordance with WAC 468-51-110. 7. The Department hereby reserves the right to order the change of location or the removal of any structure or structures authorized by this permit at any time,said change or removal to be made at the sole expense of the party or parties to whom this permit is issued,or their successors and assigns. 8. Existing permitted connections impacted by the Department's work program and which, in the consideration of the Department, necessitate modification,relocation,or replacement in order to meet current Department connection location,quantity,spacing,and design standards,shall be modified,relocated,or replaced in kind by the Department at no cost to the Grantee. The cost of further enhancements or modification to the altered, relocated,or replaced connections desired by the Grantee shall be the responsibility of the Grantee. 9 If any changes are made or proposed in the land use,intensity of development,type of traffic,or traffic flow of the property served by this connection permit,the grantee is required to contact the Department to determine if further analysis is needed to determine if the change is significant and would require a new permit and modifications to the connection. 10 All such changes, reconstruction, or relocation by the Grantee shall be done in such manner as will cause the least interference with any of the Department's work,and the Department shall in no wise be held liable for any damage to the Grantee by reason of any such work by the Department, its agents or representatives,or by the exercise of any rights by the Department upon roads,streets,public places,or structures in question. 11 This permitor privilege shall not be deemed or held to be an exclusive one and shall not prohibit the Departmentfrom granting other permits orfranchise rights of like or other nature to other public or private companies or individuals,nor shall it prevent the Department from using any of its roads,streets, or public places,or affect its right to full supervision and control over all or any part of them,none of which is hereby surrendered. 12 The Department may revoke,amend,or cancel this permit or anyof the provisions thereof at any time by giving written notice to the Grantee.The Grantee shall immediately remove all facilities from the right of way.Any facilities remaining upon the right of way 30 days after written notice of cancellation shall be removed by the Department at the expense of the Grantee. 13. It is the responsibilityof the applicant or Grantee to obtain anyother local permits or other agency approvals that maybe required,including satisfaction of all environmental regulations. It is also the responsibility of the Grantee to acquire any property rights necessary to provide continuity from the apptrcant's property to the Department's right-of-way it the Grantee's property does not abut the right of way. 14 The party or parties to whom this permit is issued shall maintain at its or their sole expense the structure or object for which this permit is granted in a condition satisfactory to the Department. 15. Any breach of any of the conditions and requirements herein made,or failure on the part of the Grantee of this permit to proceed with due diligence and in good faith after its acceptance,with construction work hereunder,shall subject this permit to cancellation as herein provided. 16. This permit is subject to all applicable provisions of 468-51 WAC, Chapter 47.50 RCW, Chapter 47.32 RCW, and/or Chapter 47.44 RCW and amendments thereto. DOT Form 224-005X(back) 7/92 SEP 14 '93 02:27PM DOT DISTRICT 3 HO 1 + P.3.1.4 !-c . �. jO x 1 � W i W W p !fl 6 j 1 F Ofo n curl d;.lodoj i pm ...................... tY� 4 �t .� O r S CC •r g 'J a � � o � - Itf o ; 1 J rJ W i 1 +� V ri a ,p ¢ a CE e� I o IL 1 p .r Vol � si► 4 r .e +3Yi1 .#Jadoij r saa } O I I i A C O C 1 o P p I � i r o d a �t W CA I e 1 Woil 1 I N 1 r I r � d COMMERCIAL APPROACH . SINGLE APPROACH TYPE D Fitune 920.2a 1 920-4 mlign Manual June 1989 - „XY •+{-�""41:n�-drt:� r.. ... e. .�t't rztAe+-.we.w•SnG-.1-. ��.�' � � !S EF " i 7 �`* •q= Q�•`i.F�,i DOT La I'�TF'I%_', 3 LJL,i t J r .i w I i W ^ _ QLLJ O ni i e 6n er I '' � W � j I w� I AI• II x rrs El- 0 i �� I �►--� 4 WZ O W a a-� C m en tL v L> O J M I I I c�I AJ 3 C�!W 'mU. I If (I zi o c f ., a � o � � f 1 .m AEP 1S '93 07.46AM! DOT DISTRICT 3 HO P.2f3 i, l 11Hit j, b OH ' ' il►YYr__ ��� r � i I r t I aOMM��CtAL AMA4AOM • WHOLN APOMACM 7TM o Five M24 IyM 1"9 ( P.2/4 SEP 14 '93 02:26PM LOOT DJLSTRIt_T 3 HO t Washington State, Distriet 3 Headquarters Co rtment of Transportation 5720 Csp't0+Bouievarc,Timwsie pa °C Box 47440 Duane Berentsan Qlymo;a,WA 98504-744C 'Secretary of Transportation (206)357-2600 Fax(206)367-2$0' September 9, 1993 Michael F. Winek, P.B. Bovay Northwest 4040 Wheaton Way, Suite 202 Bremerton, WA 98310 SR 3 MP 2&51, Right Vicinity ARCO AM/PM ; " B.C. File No. 93224-M Dear Mr. Winek: We have reviewed the revised drainage calculations and the traffic analysis for the above proposal and we offer the following comments: _ The drainage plans are acceptable to the Department of Transportation, if constructed as submitted. a • K Based on the projected traffic volumes as submitted for this development, the ' Department will require the west access approach to be "right-in" and "right-out" only. The Department of Transportation is mandated by WAC 468-51 to regulate and control vehicular access and connections paints of ingress to, and egress the state highway system. One of the wqs we accomplish-this is by limiting the f accesses or in this case, limiting the movements of ingress and egress. number o , We request the developer resubmit the access plan for the west and east access connections. The Department requires the accesses be a Type "D" commercial approach design, using a WE-50 design vehicle, see attachment. We will require full tapers be installed for both of the approaches. A raised traffic island is required to control ingress and egress, for the west approach. Attached is an example copy of a raised traffic island plan, for your use. Thank you for the opportunity to review the drainageplans and the traffic analysis for the above propos al.If there are any questions regard ng our comments, please contact Rick Mowlds at (206) 357-2667. Sincerely, Al V DEAN W. M G, P.E. Assistant Transportation Planning Engineer Attach, DM/RM WA 98584 cc; I. Manassas! Mason Co. DC P.��B P.O. 578 helSoneltWA 98584 C. Herth / Mason Co. DHS E. Lenhart/ Little Deli Mart / 345 Andover t B Xlsvue Tukwila, 9$Og4128 B. Saling / PCS / 10020 Main St. Ste. l M. McGill 93224M3.DOC 1. 113 Ili I I! III• I ?I . I _ '�,``�.yS. ` O�j. P I 1 � •4r•'t�,• Ir!! � illl ! flll IIIIIIIIII I !• II 1• >: •'�• �� 1, !I111111111111 °`r'•J. �f I 111 a ! \ '.fS��ir'!� .s.��'�• � `Yfi•f�.. ! lillillilI I I!1 I I I, : y 'Rr�•},•• •.,• 'ti I l i 61i1i it I II I : '_ •'"'° ,, ''a, �I Ali I II I I' 111 I i oil Hll, I I °f i - � I I t ! I�i I ^'• ...� r•. .. .....0 / �• �n• . 1 ' II iII I. II 11 11 �Hll 1 . I I J� 1 M, 1111 , i I ti Mol' T ti4 1 I� Ili I I I n l I I II �E I11 1 I 1 .1�. / •`�*•`ry 4• i1 i• .\. Y Ml ,l :I �11 NilI I I I it 'ill ! +�� ,ja 'I J II ! IIII II I �J I I I I I'i 1i1 I I ;! I �t.TO' .'\33\i� 47-'93 !III I II I 1111 II1111111 II II I T t I t�.1y":':�, •^' a /' 2 a!i I I ; Al, �i i i I11111111i li G g 1 I I' !I I ! ij I I 1 ' ' �o��,``�'°t�r�''S4'•• �~ ...kf��e '�� .1 ,�I a I I :I l l I'I �I� �I I t� IT ! �z °'a`'Y°t.•"''•�•d`hy���.,°�aj`� a+•��.�;:y. V 'v/C��j lk ' I 4i. MAP , IIII ' i•! "' r II I II I, �asc: r � \\\� /�/ < .I rt � / I •1111 rn k \ , I� I I! i!!j s� -oo€-•oo� •Fr.Eti \ 1 HIM EftHI - WIN Il ¢�11 a�•� � `i gg , 1111 -01 �111 I I II I Hi MR. INN, Fill u l I f¢ _I I �III1 II 1 I1l1 I i , 111 ! ? , ' Ii•• Hill 11111�111! ill 1. il 1 RI 1 1 1 11 1 i I I . i 1, ' I I , I -1 r�Tj I � gZ I �Ml I ! 'III H lid H Ill i 11111 111111 HH i Ill 'I HIT1 I II 7te g m� a• r I I! •n mil"ill I I ! I lip I iIII I ��!^ E� }{r !n � � •;• I �� k/ !+ 1� i• = ly gm . il ZA Icc � ' '�. � � � .� 4•(l.F S,�?i�1i•d.`J.`.4����S7-U�I�ILaO��%i'�+l i.�•¢ �;hj, .jy {{r,1 ' `I.:•'\ . S� .t_It. ° Sri( ��i'�„ ` pt �.�1 S^•�"}••• A.•�{r1- t riS^'��`XL�y'1i}' �1}31, .T.�{�9}�,yylr.e..+irC3t e--.+...' .ii 1 L IJ I�!__��_ —..�i_ � �.a'�.. :1 - r'.�-_ � � �L 1_.) .�'.��`��i�—���•X�)� �1�11•I ('/'.:.1r�—�(l'�t�." �^^. ~� Y 9AR � ~ y z A! .1 Is T� T4 I-� il; j4 q Us 4 M, j! 4 6q l j z r MY it is M1 T I� r. ZL . 5 I Ste- '°'\ ••.,� ;` ,—�, '' ail ���Oy L 'p1 � sue' • �6. �� �'��""` s � / l� s' v �3� l ` vat mCD a� C —1 > �$ .s > . . . 11 , ®®SAM � t y > Z 00 � � H> g 8 y �• � � < � > � � c - 40 I ( b CL � a � n , v a r- N ~ W IV) ¢ )- z S 4. = LLJ W V S T W _L 0 U z Q a a < _o d �C::)y J W _ CVm l�Y� I I ILL. J m a W d CL Ln • I Q °1 O I lJ Li J in (A CID I W a Cb ~ z J 1 z W N Q > CZ) z a z Qz _ 0 1 p a: z tw W I 0— I"- Z 1=- 00w �1 U� W L O} WS F- -C d C a .4 V O N d _Z c� N F- J W Vri _J Q � o $ cv`~i Q V U -�� U r � LLAmo � I C= f- � z � >- � co H U m W W D S U 4. lL. O ^O m -""=W z W z V U) O x W OOS W /L U iL (3 m zH0 p.. \�11U► W V Y W W J F- W W C C7 W V I c WZ N V s W F v co W U V a f O ' K � o ~ f Z 0 O Z IU l� Q I K fi b SS z 8 Q w O 7 W e Z J O R u Z WO 8 Q WN .R\ Q 30 a � $ J w a: O J Q. v ~ Q z r F a e e R 'Se 1/Z r c8 Z E w Q r 3 7 e J a.icy E u d c ,r i J •' R S .. c Lo Y cr c0 ) Z n J e i w ° O c e N o V D V CU i oe5 LO « • Q a r Sk Zoe W c v E u 05 v c CL .H VI O of c« O CL =O It W L. 2 w n Ff U O> •«g K AO � O p J O z 7 O • n 0 x � Q: W W Y Q OJ= x =O f 3 � e N ! ! x Z O ` <@> II a � W 0 J Z N 2 W O 4 EXHIBIT «C'►z/z $ of O 2 a 0 a� o zo Uar . 216' -- —. SCALE 1`= 20" LOTS 8 10 t AM PM LIQUOR STORE TANKS 253 50 55 A CANOPY 55 s M� 20 M � M 6,5 y R t , '2440 R s� y - IDS---- ..-- ------- — ._. HIWAY_, 3 13ELFAIR WA - l J J 3