Loading...
HomeMy WebLinkAboutStorm Drainage Plan Review for BLD93-01056 - COM Letters / Memos - 2/14/1994 Y . GINIER"' 0 WARf PPLKAT/ONS, Febuary 4, 1994 Alan Tahja Drainage Engineer Mason County Department of Public Works P. O. Box 1850 Shelton, Washington 98584 Dear Alan, - As I have indicated in our recent discussions, Bob Lenhart has retained me to revise the site design for the proposed AMPM Little Deli No. 3 in Belfair. The previous consultant was Micheal Wnek of Bovay Northwest. The major improve- ments that I made to the site consisted of moving the drainfield to a more suitable location up on the hill to the South of the property. Removing the drainfield from the back of the property provided the opportunity to construct a drive around the building and to increase the number of parking spaces from 11 to 19. The in- crease in paved area created an increase in the storm water runoff from the site so it was necessary to revise the design of the storm water control system. I have enclosed the following for your review and comment: 1: A set of existing and proposed watershed maps and calculations for the 2, 10 and 100 year storms. 2. A proposed strategy for improving water quality treatment for the site. 3. A revised drawing for the site drainage. When I began the project I did a field review of the existing site drainage and the topography. The topography map of the site was expanded to include more the area off the site on the South and West boundaries. Careful analysis of this new data resulted in the mapping of the existing site drainages show on the maps included with the calculations. I did not consider it desirable to divert all the surface water from this site that flows into the watershed that is drained by the small unnamed creek to the South of the site. Therefor, I separated the clean roof runoff from existing liquor store and the proposed AMPM Market and the canopy over the gas pumps from the rest of the site and drained it to Southerly side of the Engineering Software Applications,Inc. 210 N.E.Cherokee Beach,Belfair,Washington•98628 (200)276.0578 site. I then designed an infiltration system using two, 60 foot runs of H-10 graveless infiltration units developed by the Infiltrator Company in Old Saybrook, Conneticut to both store the peak runoff flows and soak the water into the ground. The outlet from these units will be controlled by two orifices located in a plate in the outlet catch basin. The lower orifice will be 1.5 inches in Dia. and at an Elev. of 59.0 and the upper orifice will be 4 inphes in diameter and located at Elev. 60.4. The infiltrators will serve to lower the ground water table in the wetter months so that infiltration of the storm water into the ground will be possible during wet peri- ods. The current calculations demonstrate that the site meets the stated design criteria by not exceeding the existing storm runoff flow rates for the 10 and 100 year storms and not exceeding 1/2 the storm water flow rate for the-2 year storm. .,Please review the hydrographs I have, included to for a visual demonstration'of the calculation results. Please note that I have continued to use the drawings previously approved by your office that were prepared by Mike Wnek for the storm water detention facility and the oil/water separator. The drawings remain unchanged except that the upper orifice in the distribution vault changed based on the new calculations. increased the outlet elevation from Elev. 54.01 to 54.41 and increased the orifice size from 5 inches from 5.5 inches to decrease the two year storm flows for the entire site. Based on lower storm water flows to the oil/water separator, resulting from moving the roof drainage to the South side of the site, I was able to reduce - the oil/water separator size from 577-CPS to 660-CPS. am very pleased with the proposed redesign of this system. It exceeds your criteria for the site yet keeps the clean water from the three roofs flowing into the stream system in a controlled manor. The average flow to the 660-CPS (Utility Vault Co.) is approximately 100 to 120 gpm which is less then the recommended 125 gpm process rate allowed through the unit. The unit can pass a maximum flow rate of 415 gpm. Thank you for your visit to the site and your interest in this project. Your coopera- tion has helped me to prepare this design. Your truly, h A 14Z Pa McCullough, P.E. President, ESA MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 February 14, 1994 INTER-DEPARTMENTAL COMMUNICATIONS DATE TO: JASON MANASSEE, Planner - DCD FROM: ALAN A. TAHJA, Office Tech. - P/W SUBS: Belfair AM/PM - BOVAY - ESA, McCullough Proposal Jason, I have reviewed the proposed storm drainage plan prepared by Pat McCullough, P.E. of ESA and feel his proposal provides adequate stormwater provisions. The plans submitted allude to an oil/water separator to be utilized that is detailed in the original plans submitted by Bovay Northwest. The plans submitted by Bovay only say that an oil/water separator will be sized to accommodate the water quality storm event (6 month storm event) . In the absence of more specific specifications, I would request that specifications for the oil/water separator to be used be submitted prior to its installation to ensure it provides adequate capacity. McCullough alludes to a Utility Vault Company 660-CPS with a recommended capacity less than 125 gpm. McCullough's calculations show that the water quality storm would deliver just under 100 gpm, so I feel comfortable with his proposal . I would like to make myself available to accompany whoever does the final inspection and acceptance of the stormwater drainage facility. ALAO A. TAHJA File: H:\WP\LETTERS\BEL-AMPM.IDC