Loading...
HomeMy WebLinkAbout30-84 - Res. County Road Project No. 1008 Island Lake Road (`-)1AOI IUSS a ONT S RESOLUTION %qzO. 3 0-8 4 t:.t::u"TrY pl n= Iq0. 1008 V41:fl, .AS, on Dla_,ors ��,..zri t.�- Road �rj. 5120 _... _ k3,,iown locally as the- Island Lake Road Road, more specifically located in M.P' 0.00 _ to M.Pa 0.10 work de— i_1nc-,, I as 'V)n��t2—'JC,t1.on" .in the BARS, Nla_"ta_ia , Page _1-63,, et sea, is determined to be- necessary rind WHEIMAS, this e roject. is herely a part of the officially adopted Comity mnijal toad Prtogra-, ,uru.,aant to P.C:V 36.81.130 and assigned # 24 thereon. Fat. I'll" C,zaSOILVI�.D BY THE , l RD OF COLiR'Y CONMTSSIOMERS that it as their intention to improve the road section by providing 25 m.p.h. vertical allignment sight distance, PLUS grading, draining, surfacing and paving. I and that said wort; s to p rforii 'd by _ day labor _ in accordance with the (day labor/contract) Washington State StEnn]_7,ii_-d Sr_-ecifications for Tbad and Bridge Construction as adopted by Mason County. BE T'.t' MJ'��'I"HE:R RU,SC)TA/ED that -the. �=,Lxave described County RDad Project is necessary aid prorxsr, and the es tin-ted costs of said project are herewith set out as fol lows: 500.00 Roa_:l Constr uuc.t.on $ 11,539.00 BrJ_rT, ins t_.ia.i.c Lioii� Engineer'; Estimate: in et it is ol-ri f ile in the office of the County Engineer. The Count ;' sxic1 'i'c E C 13c rel.n CSE'.5cr.ibed is HFITREBy DECLARED to be a public neces- sity, and -tile 00urit.y TA:_)ad. Engineer is ITr.'EBY ORDE,'RE1D AND AUTHORIZED to report and pro- ceed thereon as �y lavv, prmn_t7jed and J-P, ac cord.ance with WAC 136-18., A1�JI_ITI-aD t1-lis __12th--- da ` o 19 84 BOARD Or COT-WrY COMMISSIONERS MASON COUNTIY, WASHINC`I'ON IA Cha ix�nan z ri I��znber Cldkk or the zx�ar� k� _z er cc: Co. Comanissa_oners D-igine_er JOURNT3L;,,, March 15, 1984_ (CPP rorrn No. 2 j