HomeMy WebLinkAbout30-84 - Res. County Road Project No. 1008 Island Lake Road (`-)1AOI IUSS a ONT S RESOLUTION %qzO. 3 0-8 4
t:.t::u"TrY pl n= Iq0. 1008
V41:fl, .AS, on Dla_,ors ��,..zri t.�- Road �rj. 5120 _... _ k3,,iown locally as the-
Island Lake Road Road, more specifically located in
M.P' 0.00 _ to M.Pa 0.10 work de—
i_1nc-,, I as 'V)n��t2—'JC,t1.on" .in the BARS, Nla_"ta_ia , Page _1-63,, et sea, is determined to be-
necessary rind
WHEIMAS, this e roject. is herely a part of the officially adopted Comity
mnijal toad Prtogra-, ,uru.,aant to P.C:V 36.81.130 and assigned # 24 thereon.
Fat. I'll" C,zaSOILVI�.D BY THE , l RD OF COLiR'Y CONMTSSIOMERS that it as their
intention to improve the road section by providing 25 m.p.h. vertical allignment
sight distance, PLUS grading, draining, surfacing and paving.
I
and that said wort; s to p rforii 'd by _ day labor _ in accordance with the
(day labor/contract)
Washington State StEnn]_7,ii_-d Sr_-ecifications for Tbad and Bridge Construction as adopted
by Mason County.
BE T'.t' MJ'��'I"HE:R RU,SC)TA/ED that -the. �=,Lxave described County RDad Project is necessary
aid prorxsr, and the es tin-ted costs of said project are herewith set out as fol lows:
500.00
Roa_:l Constr uuc.t.on $ 11,539.00
BrJ_rT, ins t_.ia.i.c Lioii�
Engineer'; Estimate: in et it is ol-ri f ile in the office of the County Engineer.
The Count ;' sxic1 'i'c E C 13c rel.n CSE'.5cr.ibed is HFITREBy DECLARED to be a public neces-
sity, and -tile 00urit.y TA:_)ad. Engineer is ITr.'EBY ORDE,'RE1D AND AUTHORIZED to report and pro-
ceed thereon as �y lavv, prmn_t7jed and J-P, ac cord.ance with WAC 136-18.,
A1�JI_ITI-aD t1-lis __12th--- da ` o 19 84
BOARD Or COT-WrY COMMISSIONERS
MASON COUNTIY, WASHINC`I'ON
IA
Cha ix�nan
z ri
I��znber
Cldkk or the zx�ar� k� _z er
cc: Co. Comanissa_oners
D-igine_er
JOURNT3L;,,, March 15, 1984_
(CPP rorrn No. 2 j