HomeMy WebLinkAboutCOM2023-00042 Cancelled Cellular Tower Equipment - COM Inspections - 8/27/2024 INSPECTION CARD
Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352 CANGELLED
www.masoncountywa.gov
PERMIT# COM2023-00042 PROJECT ADDRESS 1654 E MASON BENSON RD GRAPEVIEW, WA 98546
PARCEL# 221030000000 PROJECT DESCRIPTION ADD 3 ANTENNAS, PLATFORM MOUNT, JUMPERS &
EQUIPMENT, EQUIPMENT CABINET ON 5X7 CONCRETE PAD
OWNER GREEN DIAMOND RESOURCE COMPANY/ ADDRESS 10 PRESIDENTIAL AVE PHONE 1.208.938.8844
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
KNOX BOX VERIFICATION �BLD-Final Inspection
40
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
F
3-00042 NEW COMMERCIAL PERMIT
ESCRIPTION: ADD 3 ANTENNAS, PLATFORM MOUNT, ISSUED: 05/22/2023
EQUIPMENT, EQUIPMENT CABINET ON 5X7 CONCRETE EXPIRES: 11/18/2023
ESS: 1654 E MASON BENSON RD GRAPEVIEW
PARCEL: 221030000000
APPLICANT: GREEN DIAMOND RESOURCE COMPANY/ OWNER: GREEN DIAMOND RESOURCE COMPANY/
DISH WIRELESS DISH WIRELESS
10 PRESIDENTIAL AVE 10 PRESIDENTIAL AVE
WOBURN, MA 01801 WOB URN, MA 01801
1.208.938.8844
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 20000.00 $20,000.00 Planning Commercial Review $380.00 $0.00
ESTIMATION..) Fee
Technology Surcharge $11.15 $0.00
Plan Check Fee $219.68 $0.00
Building Permit Fee $337.97 $0.00
State Fee-Commercial $25.00 $0.00
Total: $20,000.00 Totals : $973.80 $0.00
REQUIRED INSPECTIONS
KNOX BOX VERIFICATION BLD-Final Inspection
CONDITIONS
All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
Printed by:Annie Wilson on:05/22/2023 03:32 PM
Page 1 of 2
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
H'V C 360-427-967070 ext 352
www.masoncountywa.gov
NEW COMMERCIAL PERMIT COM2023-00042
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
* Must comply with MC ORD 5-98
1 hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Annie Wilson on:05/22/2023 03:32 PM
Page 2 of 2