Loading...
HomeMy WebLinkAboutBLD2024-00823 Mechanical - BLD Inspections - 8/12/2024 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-00823 PROJECT ADDRESS 180 E Fir Dr Shelton, WA 98584 PARCEL# 320065200018 PROJECT DESCRIPTION INSTALL SINGLE ZONE DUCTLESS HEAT PUMP OWNER ADDRESS PHONE CONTRACTOR BRADLEY AIR COMPANY ADDRESS 123 E FAIRFIELD CT PHONE 360.426.1284 CONTRACTOR LICENSE BRADLAC828L6 LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments Mechanical/Plumbing Final L IZZ 1 1 -Z-Z Y JCL ��E�2 �T MASON COUNTY 360-427-9670 Shelton ext.352 360-275-4467 Belfair ext.352 COMMUNITY DEVELOPMENT 360-482-5269 Elma ext.352 Building,Planning,Fire Marshal 615 W.Alder St. Bldg. 8 - Shelton,WA 98584 www.masoncountywa.gov CORRECTIONANSPECTION REPORT PERMIT/CASE NUMBER: i;zz)WZ-O®FZ3 ADDRESS/LOCATION: /�D -F7r bf- FINDINGS• Gt 60-41KI �v / 2 p a -gckeJak 414 itac to�� -Per �a� Z>� _/�' f Items listed above must be corrected to gain compliance. THIS IS NOT A COMPLETE INSPECTION ❑ This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. ❑ Call for re-inspection when corrections are made before proceeding with any further work. ❑ Make corrections, items will be checked on the next inspection. ❑ OK to Date: O 'Z Z� ❑ Please contact our office regarding possible Department: Lp structural damage incurred by recent Inspector: "natural/man made"disasters.This is NOT a CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC14.12 r Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-00823 MECH/PLUMB - RESIDENTIAL PROJECT DESCRIPTION: INSTALL SINGLE ZONE DUCTLESS HEAT ISSUED: 07/09/2024 PUMP SITE ADDRESS: 180 E FIR DR SHELTON EXPIRES: 01/05/2025 PARCEL: 320065200018 APPLICANT: HERNANDEZ JENNIFER L OWNER: 180 E FIR DR SHELTON,WA 98584 CONTRACTOR: BRADLEY AIR COMPANY 123 E FAIRFIELD CTSHELTON,WA 98584 360.426.1284 GENERAL CONTRACTOR'S LICENSE: BRADLEY AIR COMPANY License: BRADLAC8281_6 123 E FAIRFIELD CTSHELTON,WA 98584 Expires: 06/26/2026 360.426.1284 FEES: Paid Due Mechanical Base Fee $30.00 $0.00 Mechanical Fees $19.00 $0.00 Final Inspection $80.00 $0.00 State Fee-Residential $6.50 $0.00 Technology Flat Convenience $5.00 $0.00 Fee Totals : $140.50 $0.00 FIXTURES (sty Mechanical Fixtures 1.0000 Ductless Heat Pump REQUIRED INSPECTIONS Printed by:Brittany King on:08/01/2024 02:25 PM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov MECH/PLUMB - RESIDENTIAL BLD2024-00823 Mechanical/Plumbing Final Inspection CONDITIONS All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy code(WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. " All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. " All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. " Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org " CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. " Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. Printed by:Brittany King on:08/01/2024 02:25 PM Page 2 of 3 a � Mason County Mason County - Division of Community Development 615 W. Alder St. G Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov MECH/PLUMB - RESIDENTIAL BLD2024-00823 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. 1 Issued By� Contractor or Authorized Agent: Date: t Printed by:Brittany King on:08/01/2024 02:25 PM Page 3 of 3