Loading...
HomeMy WebLinkAboutFIR2011-00025 - FIR Permit / Conditions - 6/29/2011 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line (360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670, ext. 352 Shelton, WA 98584 P10 FIRE PROTECTION PERMIT FIR2011-00025 APPLICANT: NORTH FORTY LODGING LLC RECEIVED: 6/ CONTRACTOR: FOX FIRE PREVENTION (360) 871-1985 LICENSE: FOXFIP1127M8 EXP: ISSUED: 6/29/2019/2011 SITE ADDRESS: 10 E ALDERBROOK DR UNION EXPIRES: 12/29/2011 PARCEL NUMBER: 322335000014 LEGAL DESCRIPTION: SUNNY BEACH PCL 1 OF BLA#04-58 PROJECT DESCRIPTION: ADDING 2 NEW SPRINKLER HEAD GENERAL INFORMATION System Information Type of Use: Sprinkler Heads: Audible Switches: Pull Stations: Fire District: Flow Switches: Visual Devices: Door Releases: Hood & Duct?: Pressure Switches:: Smoke Detectors: Duct Detectors: Dry Chemical?: Zones: Heat Detectors: Wet Chemical?: Sprinkler?. Y Standpipe?: SQUARE FOOTAGE FEES Monitoring Company: First Floor: Type Amount Due Amount Paid Monitoring Phone No.:() - Second Floor: Sprinkler System Permit FE $168.50 $168.50 Auto Fire Alarm?: Third Floor;: Sprinkler System Plan Che $109.20 $109.20 Total: $277.70 $277.70 FIR2011-00025 Please refer to the following pages for conditions of this permit. Page 1 of 4 CASE NOTES FIR2011-00025 CONDITIONS FOR FIR2011-00025 1.) Per section 901.2.1 of the 2009 International Fire code, Statement of Compliance. Before requesting final approval of the installation, the installing contractor shall furnish a written statement to the fire code official that the subject fire protection system has been installed in accordance with the approved plans and has been tested in accordance with the manufactures specifications and the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be attached th ritten statement. X This permit bec mes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access tope above described property and structure for review and inspection. OWNER OR AGENT: DA�.�� 62 zZ FIR2011-00025 Please refer to the following pages for conditions of this permit. Page 2 of 4 -bl/20/2005 15.2E FAI 360 427 7796 MAS10N CO PERMIT CfiR U002 MASON COUNTY FIRE -MARSHAL RECEIVED Mason county Bldg_ill 426 w Cedar St JUN 0 2011 PO BOX 186 5hefbn,WA 9&%4 =w1_N1V1j (350)427-9670 Ext 273 426 W. CEDAR ST. Permit#F, of i Mason County Tire Protection System Permit Application Incomplde application will not be accepted j Owner: .J L Lc Phone#: Mailing Address:_3-I al City: Q JZo 0 State:W Zip: Site Address: 4-1o>1 f--Vuj 1(3(. City: jh1.Sv O State:WA-Zip: 1`8 Parcel c)0 o I Legal Description: Lien/Title-Uc)lder: Address: City- State: j:,J c_ Phone :3(oO &+I i Address fir,T�>a K City State: $3 Contractor Regist-aldon#: �oX Ir= Fx-- IZ:1-yi 9 E pirtdon Date: Budding S Footage & Ir" / 2"' / 3� g �� b (existing P���� Building U5e: Occupancy Classification: Constrilction Type: 'I' Te of System- 1�,pe of Fork: Sprinkler: 'met Dry New System: Standpipe: Wet Dry Modification:_ )4 AFA: Hood&Duct: , Diy Cheroot 1 Wet Chem: Fire Pump: LTL cerf ifi ed Monitoring company Phone#: Contractors Bid Price: S b , Plan Submittal Requirements Your plan submittal shall include the following_ • Plans shall be on standard 24"x 36"paper,drawn to scale with dimensions and north arrow. • Site and Floor plan with cross sectional and exterior elevations. • Location of occupancy and/or area separation walls,partitions, stairway enclosures, concealed spaces, etc. • Cut sheets and/or references for all new devices. • Location/description of all new and existing devices. • Battery calculations. • Wiring diagrams per floor or zone overlaid on an accurate floor plan. • Electrical riser diagram showing all zones,circuits, devices,and end—of—line resistors. • Hydraulic calculations. • Copy of Contractors bid. Fees The permit fee will be assessed based on the submitted contractor bid for the project or a minimum of$168.50. A plan review fee will be calculated at 65%of the permit fee(minimum$109.50)and is due upon submittal of permit application. Contractor's Affidavit I certify that I am a currently registered contractor in the State of Washington. I am aware of the ordinance requirements regulating the work for which the permit is issued and certify that all work will be in compliance with this ordinance. No changes will be made without first obtaining approval from the Mason County Fire Marshal. BY: Date: f vI